Skip to main content
Official casework recordDismissedCurrent release

Appeal 3373597

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

new 2-storey rear and part-2 storey side extensions to existing dwelling with loft conversion and partial lower ground level to rear.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The description of development in the banner heading above differs to that on the decision notice. [name] have no confirmation that the appellant agreed to change the description of development I must use that from the application form.

    The appeal site is within the Moor Park Conservation Area (CA). I am therefore required to pay special attention to the desirability of preserving or enhancing the character or appearance of the Conservation Area, in accordance with the statutory duty set out in Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (the Act).

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the host property and the Moor Park Conservation Area (CA).

  4. Section 05

    Reasons

    Having regard to the Moor Park Conservation Area Appraisal (CAA), I find the CA derives its significance, in part, from its distinctive visual qualities. This being a planned, low-density development of large, two-storey detached dwellings primarily constructed between the 1920s and 1950s. These properties are varied in style and design, set back from tree-lined roads in spacious plots with open frontages, with properties retaining many characteristic original features, including chimneys.

    The appeal property typifies this character and layout. It is a pre-1958, two-storey detached property situated in a spacious plot, set back from the highway and features distinctive chimneys. Due to the land levels, the property sits slightly higher than No [address], but lower than No 107.

    Although some alterations have taken place at the property, including a garage and single-storey side extension, the main dwelling appears relatively unaltered. The limited additions do not harmfully detract from the property or the visual qualities of the CA.

    The property has a simple form and a modest scale but exhibits an Arts and Crafts character with original architectural features. These include eaves detailing, a prominent hipped front gable, tiled front porch, leaded windows and tall prominent chimneys. These elements all add visual interest and contribute to the special historic interest and significance of the CA as a whole. Consequently, by retaining much of its original form and design, the property makes a positive contribution to the character and appearance of the CA. While this does not prevent the dwelling from undergoing any change, any alterations should be appropriately designed.

    The proposal involves a two-storey side extension, a two-storey rear extension and roof alterations. The two-storey side extension would extend the main dwelling closer to the boundary with No 107. Concerns have been raised by interested parties that this would result in the property covering more than 80% of its plot width, something that the CAA seeks to avoid to maintain the spacious, open character of the estate. The Council, however, indicate the coverage would be 75%, in accordance with the guidance. However, irrespective of the numerical calculations, to accommodate the side extension, I am mindful that the existing double garage would be demolished, which is built up to the side boundary. Furthermore, given the hipped roof form of No 107 and that the side extension would be set away from the adjoining boundary with a catslide roof, I am satisfied that the sense of spaciousness would be maintained.

    Although the side extension would incorporate a ground floor front projection, this element would remain noticeably setback from the front elevation of the hipped front gable. Consequently, given the modest width of the side extension, it would not in itself, unduly compete with the hipped front gable.

    However, notwithstanding the above, the first-floor of the side extension would contain no setback from the front elevation, with the roof continuing the existing ridgeline. This, in combination with a proposed 1 metre increase in the ridge height of the host property, would add noticeable massing to the roof.

    The enlarged roof as a whole would become an overly dominant feature of the front and side elevation when viewed from the street scene compared to the existing arrangement, particularly as the property is set forward of No 111. The enlarged roof, even with the proposed catslide, would harmfully erode the prominence of the chimney stacks, which contribute positively to the character and appearance of the property and, in turn, the significance of the CA. In particular, the southern chimney stack, a characteristic original feature, would be largely subsumed by the enlarged roof. This chimney stack is currently highly visible on the flank elevation from the street, above the vegetation along the shared boundary with No 111.

    Furthermore, the increased ridge height would be noticeably taller than that at No [address], even after accounting for the extant permission which would increase the roof height at this property. It would also be taller than the roof at No [address]. While this difference would not be substantial, it would nevertheless harmfully interrupt the gradual stepped roofline of the houses along this part of the road.

    Although the façade-to-roof ratio would be similar to the neighbouring properties, and the front elevation would retain the tiled front porch, leaded windows and eaves detailing, these factors do not sufficiently mitigate my concerns above.

    Turning to the rear elevation, although this element is not perceptible from public vantage points, it would be visible from the rear gardens of neighbouring properties and still forms part of the overall character of the property and does not negate the need to ensure a high quality design which respects the character and appearance of the existing property.

    The existing rear elevation is unassuming, but reflects the proportions and features of the host property, including eaves detailing and modest fenestration arrangement.

    Given the large plot size, the increased footprint of the dwelling arising from the additions would retain acceptable plot coverage. However, the two-storey rear extension spanning the full width of the enlarged property, with a significant increase in depth, in combination with the enlarged roof with increased ridge height and basement, would result in substantial additions to the host dwelling. Collectively, these additions would overwhelm the original form of the dwelling, resulting in a disproportionate addition that harmfully detracts from its original character and appearance, with the increased roof form and depth visible from the street given the property’s forward position relative to No 111.

    The rear elevation would also incorporate significant amounts of glazing, including multiple Juliet balconies. Although the arrangement has attempted to reflect the horizontal emphasis of the existing rear elevation, the extent of glazing gives the appearance of an overly wide building and, along with the overall increased massing, fails to complement the original character of the host property, appearing as an unsympathetic addition.

    I acknowledge that the roof would be dual-pitched, as required by the CAA, and that the rooflights and dormer on the rear would accord with the CAA principles. However, these factors do not mitigate my concerns regarding the overall scale of the proposals to the rear.

    In support of the appeal, the appellant has drawn my attention to an extant permission at No [address]. Although that scheme contains large amounts of glazing, extensive glazing is already a distinctive feature of No 111, which has undergone historic alterations. Furthermore, although the rear elevation would feature a terrace, the rear elevation of No 111 has various projecting elements at the ground and first floor which assists in breaking up the massing. Therefore, this example does not alter my findings, with the proposed scheme being assessed on its own merits.

    Drawing the above together, I find that the proposal as a whole would fail to preserve or enhance the character and appearance of the CA, resulting in less than substantial harm, but nevertheless of considerable importance and weight. Given that the impact arising from the proposal would be localised in terms of the CA as a whole, the harm would be at the lower end of this scale.

    Regardless of the level of harm, the National Planning Policy Framework (the Framework) at paragraph 212 advises that when considering the impact of a proposed development on the significance of a designated heritage asset, great weight should be given to their conservation. Paragraph 215 of the Framework requires the less than substantial harm to be weighed against the public benefits of the proposal.

    I have not been referred to any defined public benefits arising from the proposal. It would provide a larger residential dwelling, but this does not provide a public benefit that would outweigh the less than substantial harm identified.

    A lack of identified harm from the Council on other matters including access, carparking, landscaping and the living conditions of adjoining properties in terms of outlook and privacy are neutral considerations that weigh neither for nor against the proposal.

    I therefore conclude that the proposal would have an adverse effect on the character and appearance of the host property and would thus fail to preserve or enhance the character or appearance of the CA. Accordingly, the proposal would fail to satisfy the requirements of the Act and conflict with Policies CP1 and CP12 of the [name] 2011 (CS) which together seek to ensure high quality design that respects local distinctiveness and protects and enhances heritage assets and the character of an area from inappropriate development.

    The proposal would also be contrary to Development Management Policies Local Development Document 2013 (LDD) Policy DM1 which requires applications to satisfy the design criteria set out in appendix 2 to ensure that development does not lead to gradual deterioration in the quality of the built environment. Appendix 2 specifically notes that oversized additions can detract from the character and appearance of the original property. The proposal would also be contrary to LDD Policy DM3 which states that within a CA, development will only be permitted if the proposal is of a design and scale that preserves or enhances the character or appearance of the area.

    It would also conflict with Policy DE1 of the Batchworth Neighbourhood Plan (2025), which amongst other matters, seeks new development to respond to and where possible improve the local character.

  5. Section 06

    Conclusion

    The proposal conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. The appeal is therefore dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5200No official casework-database value to compare
    Extracted decision date · page 1
    21 November 2025Matches the official casework database
    Extracted site visit dates
    3 November 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3373597
Application reference
25/0876/FUL
Lead case reference
Not recorded
Planning authority
Three Rivers District Council
Planning authority code
E07000102

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
24 September 2025
Valid date
1 October 2025
Start date
1 October 2025
Planning authority decision date
16 July 2025
Appeal decision date
21 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
80189
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21