Skip to main content
Official casework recordAllowedCurrent release

Appeal 3373654

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘extend existing loft conversion to include dormer over front roof slope, plus dormer over part of rear addition roof, plus raise ridge by 300mm, plus remove front pediment’.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a front and rear roof extension, involving an increase in the ridge height by 300mm; a rear extension at second floor level, over part of the existing back addition; the removal of the existing pediment to the front elevation at roof level; and the retention of the already built ground floor side and rear extension to the side of the existing outrigger at [site address] , London [postcode] in accordance with the terms of the application, Ref 2025/00138/FUL, subject to the following

  2. Section 03

    conditions:

    The development hereby permitted shall be carried out in accordance with the following approved plans: A01 Rev-1, A02 Rev-1, A03 Rev-1, A04 Rev-1, A05 Rev-1, A06 Rev-1, A07 Rev-1, A08 Rev-1 and A09 Rev-1.

    The materials to be used in the construction of the external surfaces of the development hereby approved shall match those used in the existing building.

    The roof of the extensions hereby permitted shall not be converted into, or used as, a terrace or other open amenity space.

    Prior to the occupation of the development hereby permitted, the bedroom window at second floor level in the side elevation as depicted on drawing nos. A05 Rev-1 and A08 Rev-1 shall be fitted with obscure glass to a minimum level of obscurity equivalent to [name] 3, and shall be non-opening and fixed shut to a height of 1.7m above the finished floor level. The window shall be permanently retained as such thereafter.

  3. Section 04

    Procedural Matter and Background

    The description in my banner is taken from the application form, but differs from that in the Council’s decision and the appellant’s statement of case (‘the SoC’). Having regard to part 4 of the Council’s delegated report, and paragraph 2.2 of the SoC, the description was amended during the consideration of the proposal to include an existing ground floor extension which had been constructed without planning permission (‘the GFE’).

    [name] 2025, planning permission was granted at the host property for a front and rear roof extension, involving an increase in the ridge height by 300mm, a rear extension at second floor level over part of the existing back addition, and the removal of an existing pediment to the front elevation at roof level (‘the approved scheme’)1. The approved scheme is the same as those elements in the scheme before me.

    Consequently, whilst I have considered the impact of this scheme as a whole, and having regard to cumulative impacts, I have focused on the GFE.

  4. Section 05

    Main Issue

    The main issue is the effect of the development on the living conditions of adjacent occupiers with particular regard to the availability of natural light to, and the outlook from, [address] (‘No 76’).

  5. Section 06

    Living conditions

    The pre-existing floor plans show that No 78 had a two storey rear outrigger and a short single storey flat roofed projection which were set in from the boundary with the neighbouring terraced house at No 76. [name] observed on my visit, the space between that structure and the boundary has been filled in by the GFE.

    The [site address] Planning Guidance Supplementary Planning Document 2018 (the SPD’) advises at HS7 ii) that an extension to the side of an original back addition shall not exceed 2 metres in height on the boundary with the neighbouring property.

    No 76 has been divided into flats. It has a similar two storey outrigger to No 78, which includes ground floor windows and a glazed door which face the common boundary across a narrow side space. However, I understand that they serve non-habitable rooms in that property’s ground floor flat. The flat also has a ground floor rear-facing bedroom window. The outlook from there, which was already enclosed by that property’s own outrigger to one side, and by a boundary fence and No 78’s outrigger to the other, has become more so as a result of the GFE.

    However, that bedroom window, which is large and set in slightly from the boundary, retains an outlook straight down No 76’s side space towards that property’s main garden area beyond. Moreover, although the GFE is deep and abuts the side boundary, it has a limited single storey height which, although taller than advised by the SPD, is not substantially higher than boundary walls and fences which are prevalent in the area. 1 Ref: 2025/01982/FUL

    As illustrated by Figure 2 in the SoC, and as I observed on my visit, the outlook from other ground floor rear windows in the area is often constrained by boundary treatment or extensions, some of which fill the space to the side of, or project beyond, an original two storey outrigger.

    Based on the pre-existing drawings, the GFE fills the gap to the side of No 78 but does not result in a deeper projection into its rear garden. Thus, compared to the pre-existing situation, the gap between the building and the plot’s rear boundary wall, which the principal parties say measures 3.3 metres, remains unchanged.

    This is a densely developed urban area, where a limited outlook and some degree of enclosure is not uncommon. In that context, and having regard to its single storey height and the particular site circumstances, the GFE has not had a significant impact on the outlook from No 76, nor on the outlook from, and availability of natural light to, the nearest properties on [address] to the rear.

    Finally, given the GFE’s height, and No 76’s light coloured finish, I am not persuaded, on the basis of the available evidence, that it has caused a harmful reduction in natural light for those occupiers.

    The other elements of this proposal are the same as the approved scheme, and I have no cogent reason to disagree with the Council’s assessment that they would not result in an unacceptable loss of amenity.

    Summing up, the scheme does not have a harmfully adverse effect on neighbouring occupiers’ living conditions. Whilst it does not accord with the guidance in the SPD, it does not conflict with those parts of Policies DC4 and HO11 of the [site address] Local Plan 2018, which set out that extensions and alterations should take account of the amenities of neighbouring properties, and should not result in a harmful impact on the occupiers’ privacy, light and outlook.

  6. Section 07

    Other matters

    Given the diverse and evolving form and appearance of the properties on [address], and having regard to the relatively small differences compared to the approved scheme and the proposed use of matching materials, I agree with the Council that the proposal would not harmfully impact the character or appearance of No 78 or the area.

  7. Section 08

    Conditions and Conclusion

    I have considered suggested conditions against the tests in the National Planning Policy Framework. As the GFE has already been built, the standard time limit for commencement is not appropriate. In the interests of certainty, and as other parts of the scheme have not been completed, I have imposed a condition requiring that the development be carried out in accordance with the approved plans. In the interests of good design, a condition is also necessary requiring that it be faced with matching materials.

    Finally, in order to protect neighbouring occupiers from harmful overlooking and loss of privacy, conditions are necessary to prevent the use of the approved roof space as an outdoor amenity area, and requiring that the second floor side facing window be obscurely glazed and partially non-opening.

    For these reasons, and having regard to all other matters raised, including representations by interested parties, the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 450No official casework-database value to compare
    Extracted decision date · page 1
    24 November 2025Matches the official casework database
    Extracted site visit dates
    18 November 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3373654
Application reference
2025/00138/FUL
Lead case reference
Not recorded
Planning authority
London Borough of Hammersmith and Fulham
Planning authority code
E09000013

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
24 September 2025
Valid date
24 September 2025
Start date
1 October 2025
Planning authority decision date
21 July 2025
Appeal decision date
24 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
80273
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21