Appeal 3373899
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as new replacement fence.
Section 02
Decision
The appeal dismissed.
Section 03
[name]
The first main issue is the effect of the proposal on highway safety. The second main issue is the effect of the proposal on the character and appearance of the area.
Section 04
Reasons
Ball and [address] is a narrow road with no pavements and is flanked by a diverse range of dwellings with varied building lines and plot sizes. This, together with the abundance of front and side boundary hedges, trees, verges and other soft planting contributes to the informal and semi-rural character of the northern and central parts of the lane. Conversely, the southern end of the lane is less verdant due to tall walls/fencing along the boundaries of a couple of properties, along with a few dwellings with predominantly hard surfaced modest sized front gardens.
The appeal site is located in a prominent position at the northern end of the lane, adjacent to the junction of Ball and [address] and [address]. From this junction views along Ball and [address] are dominated by hedges, trees and other soft planting, along with low flint walls. Whilst there is a tall fence along the front boundary of [address] (No.17), it is materially lower than the proposed fence; set behind a small planted verge; largely covered with ivy; and is dominated by hedges and shrubs growing immediately above and behind it.
Conversely, the southern sections of the proposed fence, which has already been constructed, sits on a low blockwork wall which is to be faced with Knapped flint. This wall gets progressively taller as the ground levels fall away from the junction. The vertical boarded fence steps down in line with the wall and rises to well in excess of two metres above the road level. The northern part of the proposed fence, which similarly has been constructed, sits at ground level and includes three Appeal Decision APP/ R3650/D/25/3373899 two tall horizontally clad panels. Around the junction area and along the frontage with [address] is a lower horizontal clad fence.
Section 05
Highway safety
Policy DM9 of the Waverley Borough Local Plan Part 2: Site Allocations and Development Management Policies (LP2), states that development should provide safe and convenient access for all highway users. It should not adversely increase the risk of accidents or endanger the safety of road users. Its design and layout should comply with highway standards and guidance including visibility splays. Together paragraphs 115 and 116 of the National Planning Policy Framework 2024 (the Framework) state that proposals should provide safe and suitable access for all users and that development should only be refused on highway grounds if there would be an unacceptable impact on highway safety.
It was evident from my appeal site visit that due to the narrow width of the lane vehicles tend to travel along the centre of the lane and close to the highway boundary on both sides of the road. As a result of its combined position, height and proximity to the crossovers that serve the appeal property and 18, 19 & [address], the proposed fence severely obstructs their visibility towards [address]. The proposed fence similarly severely obstructs forward visibility of the crossovers from the northern end of Ball and [address].
I accept that there was previously an inner boundary fence adjacent to the side boundary of the appeal site. However, it was set in from the boundary and did not project as far as the crossover that serves the appeal property. The Google map photograph submitted by a local resident does show that the former boundary hedge did compromise visibility, particularly when the hedging was in leaf. However, there would have been filtered views over a short distance through the hedging of vehicles, cycles and pedestrians either approaching or waiting to exit the driveways referred to in paragraph 7 above. As a result, whilst it clearly did materially compromise visibility, it was not as harmful as the proposed fence.
For these reasons, even when taking into account the previous boundary hedge, the proposed fence has an unacceptable impact on highway safety.
I conclude on the first main issue that the proposed fence has an unacceptable impact on highway safety. Accordingly, the proposal conflicts with LP2 Policy DM9 and section 9 of the Framework.
Section 06
Character and appearance
Together Policy TD1 of the Waverley Borough Local Plan Part 1: [name] and Sites 2028 (LP1) and LP2 Policy DM4 require new development to be responsive and sympathetic to the prevailing pattern of development. New boundary treatments should respond positively to the local context around and within the site and developments should be designed to create safe and attractive environments. Consistent with this policy FNP1 of the Farnham Neighbourhood Plan 2013-2032 (NP) supports new boundary treatment that is designed to a high quality and responds to the distinctive character of the area.
Due to its combined position immediately adjacent to the highway, height and solid character and appearance the proposed fence has a formal and Appeal Decision APP/ R3650/D/25/3373899 urbanising impact on the street scene. It fails to respect and is out of keeping with the low walls, hedges and abundance of soft landscaping along this stretch of Ball and [address]. Due to the combined width and height of the fence the trees to the rear of it currently and would in the future do little to soften its tall stark appearance. Although there is a fence to the front of No.17 for the reasons stated on paragraph 4 of this decision, it is not comparable to the proposed fence. For these reasons the proposed fence unacceptably detracts from and undermines the informal and semi-rural character and appearance of this part of Ball and [address].
I conclude on the second main issue that the proposal unacceptably harms the character and appearance of the area. It therefore conflicts with LP1 Policy TD1, LP2 Policy DM4 and NP Policy FNP1.
Section 07
Other matters
Overall, I find that the highway and environment harm caused by the proposal materially outweighs the security and privacy benefits for the appellant and their family from having the proposed boundary fence along the side boundary of their property. Further, this harm is not something that could be satisfactorily addressed through the imposition of conditions.
Concern has been expressed that the proposed fence and associated wall have been placed on highway land. The highway authority has raised no such concerns and the ownership of the site is not, in itself, a planning matter. Concern has also been raised regarding the positioning of a security camera at the entrance to the appeal property. I confirm that this camera is not included in the planning application and so falls outside the scope of this appeal.
Finally, I confirm that as required by planning law I have determined this application in accordance with the development plan, having taken into consideration all other factors, including the representations submitted both supporting and objecting to the proposal.
Section 08
Conclusion
Having regard to the conclusion on both main issues the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1220No official casework-database value to compare
- Extracted decision date · page 1
- 21 November 2025Matches the official casework database
- Extracted site visit dates
- 5 November 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3373899
- Application reference
- WA/2025/00787
- Lead case reference
- Not recorded
- Planning authority
- Waverley Borough Council
- Planning authority code
- E07000216
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 29 September 2025
- Valid date
- 10 October 2025
- Start date
- 10 October 2025
- Planning authority decision date
- 10 July 2025
- Appeal decision date
- 21 November 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 80195
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21