Skip to main content
Official casework recordAllowedCurrent release

Appeal 3374032

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

alterations to existing front porch and installation of front gates with walls.

  1. Section 02

    Decision

    The appeal is dismissed insofar as it relates to the front gates with walls.

    The appeal is allowed and planning permission is granted insofar as it relates to the alterations to existing front porch at [site address] in accordance with the terms of the application Ref 3/25/0656/HH and subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: [name] 47-BGR-010 rev P01 – Location Plan; [name] 47-BGR-004 rev P01 – [name]; [name] 47-BGR-005 rev P01 – [name] and [name].

    No development shall take place above ground level until details of the materials to be used in the construction of the external surfaces of the building hereby permitted have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.

  2. Section 03

    [name]

    The main issues are: • whether or not the proposed development would be inappropriate development in the Green Belt, having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies, and the effect of the proposal on the openness of the Green Belt; • the effect of the proposed development on the protected trees; and • whether or not harm by reason of inappropriateness, and any other identified harm, would be clearly outweighed by other considerations to amount to the very special circumstances required to justify the proposed development.

  3. Section 04

    Reasons

    The appeal property (Brockswood) is a large, detached dwelling that is set back from [site address] Road (BGR). Substantial mature intervening vegetation and trees, that are included within a blanket Tree Preservation Order (TPO), exist along the site’s frontage, which are characteristic of the site’s particularly verdant surroundings. The dwelling is served by two ungated vehicular access points that exist off BGR. They are largely devoid of built structures save for the existing driveway surface and the low concrete wall that stretches across most of the site’s frontage.

    The proposed development would include the provision of 1.6m high traditional style gates to both entrances, with brick piers either side. The gates would be set back from the highway by approximately 6m. Sloping sleeper walls are proposed either side of the gates that would reduce in height significantly towards the highway to a height broadly commensurate with the existing low concrete wall.

  4. Section 05

    Whether inappropriate development, and openness

    The Framework states that the fundamental aim of the Green Belt is to prevent urban sprawl by keeping land permanently open. Inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Policy GBR1 of the East Herts District Plan (2018) (the Plan) states that planning applications within the Green Belt will be considered in-line with the provisions of the Framework and the policy therefore wholly aligns with national Green Belt policy.

    In this case the main parties agree that the proposed gates and walls would constitute inappropriate development in the Green Belt. I find no reason to disagree.

    Openness is an essential characteristic of the Green Belt that has both spatial and visual aspects. The proposed gates would be set back from the highway and despite being the tallest element, would only be fleetingly perceptible to passersby. They would also be screened from view by surrounding mature vegetation and trees.

    However, the sloping sleeper walls would introduce additional built structures to the more immediate street scene, the lower parts of which would be visible from a distance in both directions when travelling along BGR. The proposed development would introduce new boundary treatments, which would not only enclose the site entrances but would be more substantial features than currently exist near the site frontage. Overall, the proposed front gates and walls would have a negative effect on the openness of the Green Belt but only to a very limited degree.

    For the above reasons, the proposed front gates and walls would constitute inappropriate development in the Green Belt and cause harm to its openness. This element of the proposal would therefore be contrary to both the Framework and Plan Policy GBR1. As per the Framework, any harm to the Green Belt, including harm to its openness, should be given substantial weight.

    The Council states that the proposed alterations to the existing front porch would benefit from the exception to inappropriate development in the Green Belt at paragraph 154 c) of the Framework, which allows the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building. Having had regard to the evidence before me and my own observations on site, I find no reason to disagree. Given that the proposed porch alterations would not be inappropriate development in the Green Belt, I am not required to consider the matter of openness in relation to this element.

    Thus, the proposed alterations to the existing front porch would accord with the Framework and Plan Policy GBR1.

  5. Section 06

    Trees

    The on-site trees are subjected to a blanket TPO, which demonstrates their contribution towards the visual amenity of the area. During my site visit I observed that the trees along the site’s front boundary contribute significantly to the verdant character of the surrounding area. The largest Oak tree, which is identified as being in good condition, is a particularly prominent landscape feature when viewed from BGR, contributing positively to the visual amenity of the area.

    The submitted tree survey does not reflect the latest location of the proposed gates and walls, which, of note, would be closer to the trunk of the site’s largest Oak tree than originally proposed. Without a substantive and up-to-date tree survey I cannot be certain that the proposed gates and walls would not harm the trees and their root systems. It would not be appropriate for me to impose a condition requiring the submission of a further survey as it would not in itself guarantee that the proposed development would be acceptable.

    Therefore, for the above reasons, the proposed gates and walls are contrary to Plan Policy DES3, which, amongst other things, requires development proposals to demonstrate how they will retain, protect and enhance existing landscape features which are of amenity and/or biodiversity value, in order to ensure there is no net loss of such features.

    The proposed alterations to the existing porch would be located a substantial distance from the trees subject to the TPO and I am therefore content that this element would not harm them accordingly. Thus, the proposed alterations to the existing front porch would accord with Plan Policy DES3.

  6. Section 07

    Other considerations

    The appellant has presented a fallback position relating to the implementation of permitted development rights at Article 3(1) and Class A of Part 2, Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), which includes the erection of gates and walls, subject to limitations. As they would not exceed 2m above ground level they would comply with the general height limitations at paragraph A.1.(b) of Class A.

    [name].1.(a)(ii) of Class A limits the height of any gate or wall constructed adjacent to a highway used by vehicular traffic to 1m above ground level where the proposal does not relate to a school. The gates and some of the walls would exceed 1m in height. However, the gates would be set back by approximately 6m from BGR and so not adjacent to it. The plans demonstrate that the walls would be a maximum of 600mm in height for a length of 2.4m back from the highway. Therefore, the point at which the walls would exceed 1m in height would be sufficiently far from BGR as to not be adjacent to it. The gates and walls are therefore likely to comply with the limitations of Class A in terms of heights.

    Class A does not require consideration of the effect of permitted development on trees. Nevertheless, given the presence of the protected trees, and the position of the large Oak in particular, there is a high probability that the Oak tree’s root system would be damaged by any gates and walls in this position. I am therefore not convinced that the fallback position would have a clear prospect of being implemented given it would likely conflict with the provisions of the Town and Country Planning Act 1990, which prohibits the wilful damage of protected trees. Consequently, the fallback position is a material consideration but of limited positive weight in this instance.

    The proposed gates and walls would provide enhanced property security and privacy and would provide a physical barrier to assist in keeping children safe from vehicles moving along BGR. However, I am mindful that the proposed walls would be low where they meet the highway and the resultant benefits would therefore be limited. Furthermore, there is no substantive evidence before me to demonstrate that the appellant has explored other potential ways of ensuring security and privacy is enhanced without the harm that I have identified. For these reasons, the benefits attract limited positive weight.

  7. Section 08

    Planning Balance and Conclusions

    The proposed development includes two distinct and separate elements.

    The proposed gates and walls would constitute inappropriate development in the Green Belt and would harm its openness. As such, the Framework requires me to give this harm substantial weight. I also ascribe significant weight to the harm found to protected trees. For the reasons set out above, I find that the other considerations in this case do not clearly outweigh the harm that I have identified. Consequently, the very special circumstances necessary to justify the proposed gates and walls do not exist.

    For the reasons given, I have found conflict with the development plan as a whole. The material considerations in this case, and the weight I give to them, do not indicate a decision should be made other than in accordance with the development plan. I therefore conclude that the appeal should be dismissed regarding the proposed gates and walls.

    As set out above, there are no reasons why the appeal should not succeed in relation to the proposed alterations to the front porch. These works are in accordance with the development plan. Consequently, I have imposed the standard time limit condition and a condition listing the approved plans for certainty. I have also imposed a condition relating to the materials of the porch to safeguard the character and appearance of the dwelling. I therefore conclude that the appeal should be allowed in relation to the proposed alterations to the front porch. [planning inspector] INSPECTOR

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 10No official casework-database value to compare
    Extracted decision date · page 1
    15 December 2025Matches the official casework database
    Extracted site visit dates
    10 November 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3374032
Application reference
3/25/0656/HH
Lead case reference
Not recorded
Planning authority
East Hertfordshire District Council
Planning authority code
E07000242

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
20 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
1 October 2025
Valid date
8 October 2025
Start date
9 October 2025
Planning authority decision date
10 July 2025
Appeal decision date
15 December 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
81526
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21