Skip to main content
Official casework recordDismissedCurrent release

Appeal 3374167

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a double side extension.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposed development on flood risk.

  3. Section 04

    Reasons

    The appeal site is an end of terrace two storey dwelling, with side and rear garden and driveway to the front. The surrounding area comprises dwellings of similar architectural style. The appeal site is proximate to the [name] and the [name], both of which are main rivers with intervening development in between. The proposed development is for a two-storey side extension which would provide a new kitchen/dining area and a bedroom at the ground floor level.

    The National Planning Policy Framework states that local planning authorities should ensure that new development does not increase flood risk elsewhere and that any residual risk can be safely managed. The Planning Practice Guidance sets out the level of detail needed in a site-specific flood risk assessment. A guidance note also accompanies the Council’s Sustainable Drainage Proforma for [name] (the drainage proforma) on the content of such assessments.

    The New Enfield Local Plan 2041: Level 1 Strategic Flood Risk Assessment (2021) (SFRA) states that in order to ensure that development is safe from fluvial flooding, finished floor levels should be raised 300mm above the 1 in 100 year plus climate change flood level. It notes that if this level of safety cannot be achieved, habitable rooms used for sleeping (such as bedrooms) should not be located at ground floor level as the onset of flooding can pose a risk to life. It also requires that the development has safe access routes that are either dry or within the very low hazard area.

    The appeal site is within [name] 2 and subject to the 1 in 100 year plus 17% climate change flood event. A Flood Risk Assessment1 (FRA) was submitted with the planning application which concludes that based on mapping from the EA that the 1% [name] flood event plus appropriate climate change allowance would not inundate the site in either defended or undefended modelled scenarios. The appellant has confirmed that the finished floor level of the proposed development would be 300mm higher than the outside ground level in accordance with the conclusions of the FRA. However, the submitted plans do not include the 1 in 100 year plus climate change event flood depths and proposed finished floor levels in mAOD and therefore I cannot be satisfied that the proposal would provide sleeping arrangements safe from flooding.

    The FRA states that the appeal site has direct connection to [address] which lies outside of the mapped flood extent and therefore would provide safe and dry access and egress for occupiers, during a flooding event. However, this does not demonstrate that the evacuation route is in the very low hazard level in accordance with FD23202 as required by the drainage proforma. Therefore, I cannot be satisfied that the proposal would provide adequate safety from flooding for occupiers.

    The FRA states that the proposed sustainable drainage system (SuDS) led strategy would include a below ground attenuation tank of approximately 2m3 volume, which would discharge at a restricted rate of 0.90l/s into the existing surface water sewer in [address]. [name] is designed to accommodate the 1 in 100-year storm event plus 40% climate change uplift. In addition, a raised rain garden planter connected via a catchpit manhole would be installed in the front garden to receive runoff from part of the roof. However, the SFRA discourages the use of underground tanks and catchpits due to ongoing maintenance issues. Although the FRA includes a surface water maintenance strategy, a detailed SuDS maintenance plan has not been submitted to ensure an acceptable standard of operation of the SuDS for the lifetime of the development. Therefore, I cannot be satisfied that the proposed development would not increase flood risk elsewhere over the lifetime of the development.

    I conclude that it has not been demonstrated that the proposed development would be safe from flooding and would not increase flood risk elsewhere over its lifetime. It thereby conflicts with [name] 12, SI 13 of the London Plan (2021), Policies CP21 and CP28 of the [name] 2010-2024 (2010) and Policies DMD59, DMD60, DMD61 and DMD62 of the Enfield Development Management Document (2014). Together, these policies seek to ensure that new development avoids and reduces the risks of flooding over its lifetime and does not increase the risks elsewhere.

  4. Section 05

    Other Matters

    The appellant has referred me to a concurrent appeal which has been submitted at [address], which was also refused on the grounds of flood risk. However, that case differs from this appeal in that it is for the change of use from a dwellinghouse to a House of [name]. [name] am the same Inspector for both appeals I have considered each scheme independently. 1 Prepared by [name] dated June 2025 2 As defined by the Hazard table from the Research and Development Technical Report FD2320 included as [name] of the SFRA

  5. Section 06

    Conclusion

    The proposal conflicts with the development plan when taken as a whole and the material considerations, including the Framework do not indicate that the appeal should be decided other than in accordance with it.

    For the reasons given above the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5170No official casework-database value to compare
    Extracted decision date · page 1
    12 January 2026Matches the official casework database
    Extracted site visit dates
    10 December 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3374167
Application reference
25/01858/HOU
Lead case reference
Not recorded
Planning authority
London Borough of Enfield
Planning authority code
E09000010

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Yes
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
4 October 2025
Valid date
19 October 2025
Start date
20 October 2025
Planning authority decision date
16 August 2025
Appeal decision date
12 January 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
82619
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21