Appeal 3374690
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
12 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of a two-storey rear extension, loft conversion, including the construction of a front and rear dormer. Part retrospective permission sought for the removal of existing render to expose the original stonework, along with alterations to the side elevation to introduce new windows.
Section 02
Decision
The appeal is dismissed insofar as it relates to the front and rear dormers.
The appeal is allowed insofar as it relates to the two-storey rear extension and removal of existing render and alterations to the side elevation to introduce new windows; and planning permission is granted for the two-storey rear extension and removal of existing render to expose the original stonework, along with alterations to the side elevation to introduce new windows at [site address] , Northumberland [postcode] , in accordance with the terms of the application, Ref 25/02542/FUL, and the plans submitted with it, so far as relevant to that part of the development hereby permitted and subject to the following
Section 03
conditions:
The two-storey rear extension and removal of existing render to expose the original stonework, along with alterations to the side elevation to introduce new windows, hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans insofar as they relate to the approved development: WR-11-03-p Rev b - [name]; and WR-11-04-p Rev b - [name]
The external materials of the two-storey rear extension and replacement windows, and removal of existing render to expose the original stonework, along with alterations to the side elevation to introduce new windows, hereby permitted shall match those used in the existing dwelling.
Within three months from the date of this decision, the window located on the second-floor side elevation, as shown on [name]/11/04/p Rev b, shall be obscure glazing to Level 3, and this specification shall be retained as such thereafter.
Prior to the first use of the two-storey rear extension hereby permitted, a bird box shall be built into the two-storey rear extension. Its design and installation shall follow best practice guidance (e.g. as close to the eaves as possible, facing between the north and east elevation and away from artificial light). This feature shall then be retained thereafter.
Section 04
Preliminary Matters
It was evident at appeal that the description used on the planning application form by the appellant and the Council during its assessment and on the initial consultation and advertisement omitted reference to the proposed front dormer. The description in the banner above has been taken from the Council’s correspondence dated 23 December 2025, which was agreed with by the appellant, except where I have deleted reference to (amended at the request of the Planning Inspectorate on 17.12.2025), as these do not relate to an act of development. The Council has undertaken a further round of consultation on the amended description, and I am now satisfied that the description now reflects the development sought, and I can proceed with my assessment.
During the Council’s consideration of the planning application, amended plans were submitted1 showing changes, amongst other matters, to the rear extension. The appellant has requested that I consider these changes, which were before the Council when it took its decision. The Council contend that whilst the revised plans were not considered, the changes would still not have been considered acceptable due to the inclusion of inappropriate dormers. I have considered these plans, taking into account the tests on [name] Ltd2. Given that the description of the proposed development remains the same and the overall footprint has not been enlarged, I do not consider that the amendments would lead to the scheme being substantially different to that considered at the application stage. Interested parties and the Council have had an opportunity to submit comments on the amended plans during the course of the appeal. In these circumstances and given the representations received during the course of the application, I am satisfied that my consideration of the proposed amendments would cause no injustice to any party were I to consider them as part of the appeal documentation. I have therefore determined the appeal on the basis of plans, WR-11-03-p Rev b - [name], and WR-11-04-p Rev b - [name].
It was apparent during my site visit that some works have commenced, namely, the removal of the existing render and the introduction of new windows to the side elevation. I have therefore dealt with the appeal on the basis that planning is being sought for these retrospectively.
The proposal is for a rear extension, loft conversion, including the construction of a front and rear dormer and removal of existing render to expose the original stonework, along with alterations to the side elevation to introduce new windows. The Council has indicated that it has no objection to the removal of existing render or alterations to the side elevation to introduce new windows, and based on the evidence, I have no reason to take a different view. The dispute between the 1 WR-11-03-p Rev a - [name] and WR-11-04-p Rev a - [name] 2 Holborn Studios Ltd v The Council of the London Borough of Hackney [2017] EWHC 2823 (Admin) parties relates to the rear extension and front and rear dormers, and these shall be the focus of my assessment.
The Council, in its second refusal reason, refer to the impact the proposed two-storey rear extension would have upon the occupants of No [address] (No 8). However, I saw that No 8 is on the opposite side of [address] and that the adjoining property with which the appeal site shares a boundary is in fact No 9. Given my observations on site, I have taken this to be a typographical error, and I have not considered it necessary to seek the main parties' views. I have therefore considered the living conditions of No 9 and not No 8.
Section 05
[name]
The main issues are: • the effect of the proposed development on the character and appearance of the host property and surrounding area, and whether the proposed development would preserve or enhance the character or appearance of the [site address] Conservation Area (the CA); and, • the effect of the proposed two-storey rear extension on the living conditions of occupants in No [address] (No 9) with particular regard to sunlight and outlook from within the property and private amenity space.
Section 06
Character and appearance and Heritage Assets
The appeal site (No 11) is located within the CA and positioned on the corner of [address] and [address]. I saw that No 11 occupied a prominent location and was clearly visible within the streetscene and the CA. There is a clear distinction between the rear of properties on [address] and those on [address]. Currently, the rear of several properties on [address] and [address] can readily be seen from the junction with [address] and [address]. The roofscape to the front and rear of [address] is also currently largely free from development, with the exception of a few small dormers to the front.
The special interest and significance of this part of the CA predominantly comes from the architectural qualities of its 19th-century traditional, mainly two-storey domestic-scale terraced housing, largely focused on the coast with views funnelled towards the sea and the horse-shoe steps. This is aided by the predominantly simple roof line, which includes small front dormers. The largely uncluttered roofscape is significant to the views.
No 11 is a traditionally designed terraced property with ground and first-floor bay windows. I saw that it was representative of this part of the CA. Its existing form contributes to the historical context of the streetscape, which in turn contributes positively to the CA.
To the rear of No 11 is a range of single-storey extensions which occupy the majority of the rear yard up to the back lane, the roof of which vary in both height and design. Above the current kitchen, the roof is a mono-pitched design, which I saw projected above the cill of the upper floor windows on the shared boundary with No 9. Beyond the kitchen, I saw that the roof above the current utility and garage was predominantly flat.
I also saw that a number of properties within the CA have two-storey rear extensions, many of which occupy approximately half the width of the property and have flat roofs. Several properties had dormer windows to the front and rear. Those visible from the appeal site were predominantly narrow with vertical timber features and had curved roofs.
I acknowledge that the rear extension would be visible from within the surrounding area and from within the CA; however, I note that the [site address] Conservation Area (Existing & Proposed) 2008 (the SPD) recognises that later offshoots and extensions are not uncommon.
The proposed amended rear extension, as amended, would be set away from the shared boundary with the adjoining neighbour and would project approximately half the width of the rear elevation. It would extend outwards from the existing main rear wall of No 11 up to the proposed garage and incorporate a largely flat roof. Its projection, width and design would match the consistency of the two-storey rear extensions I saw within the immediate vicinity. It would therefore not appear unusual to the rear of No 11 or the CA and would appear compatible in terms of scale and design with the appeal property and its immediate context.
I am mindful that the two-storey rear extension would obscure some current views of the rear elevation of [address] and [address], however I note its distance from the back lane would retain a sense of openness between the host property and the flank elevation of [address]. This would largely preserve the historic street alignment and character of the CA.
I note that the SPD does not resist new dormers; rather, it states that new dormers should be avoided unless carefully designed, are modest in scale, well proportioned, positioned and detailed, and preferably on rear or less visible roof slopes.
The proposed dormers would each comprise two windowpanes to the front, glazed cheeks to the side and a pitched roof over. The appellant contends that the proposed dormers have been amended; however, from the plans before me, and despite the lightweight design of their cheeks, the dormers would still retain two glazed panels to the front, which accentuates their horizontal emphasis.
[name] saw dormers visible both to the front and rear elevations of nearby properties, the width and design of these differed significantly from those before me. The proposed development would introduce a prominent mass at a high level on the front and rear roof slopes. The scale and design of the proposed dormers would therefore appear unsympathetic within its context, unbalancing the roofscapes, and resulting in harm to both No 11 and the CA. [name] accept that the harm to the significance of the CA would be less than substantial, Paragraph 215 of the National Planning Policy Framework (Framework) states that the harm should be weighed against any public benefit.
Section 07
Public Benefits and Heritage Conclusion
Paragraph 213 of the Framework states that any harm to, or loss of, the significance of a designated heritage asset (from its alteration or destruction, or from development within its setting) should require clear and convincing justification.
The appellant has drawn my attention to caselaw3. There is no dispute between the main parties that the removal of the cement better reveals the original stonework, to which I attach moderate weight. They also contend that there would be energy-efficiency and durability enhancements through fabric improvements, but there is little explanation as to the technology or materials. As such, I can only attach limited weight to this. Furthermore, I have nothing to persuade me that without the front and rear dormers, the future use of No 11 would be unviable. As such, I attach limited weight.
Consequently, these moderate and limited public benefits would not outweigh the great weight attached to the conservation of the heritage assets, and the proposed dormers would therefore conflict with the Framework. The harm to the CA would not be outweighed by public benefits. Moreover, Local Plan Policies ENV1, ENV 7 and ENV9 and NNP Policy N4 collectively seek to ensure development preserves or enhances the character and appearance of CA’s in Northumberland. The dormer extensions would not preserve or enhance, whereas, for the reasons above, the two-storey rear extension would at least preserve the character and appearance of the CA.
The appellant has also drawn my attention to caselaw4. It is open to me to reach a split decision on appeals, allowing the appeal in part and dismissing other elements. This is only possible where the separate parts of the proposal are clearly severable and are not functionally or physically linked. In this case, the two-storey rear extension, which I have found to be acceptable, is not physically or functionally linked to the proposed dormer extensions and therefore can be allowed. I will, therefore, issue a split decision allowing the appeal insofar as it relates to the rear two-storey extension but dismissing it in relation to the dormer extensions.
For the above reasons, I conclude that the front and rear dormers would have an unacceptable effect on the appearance of the host property and would fail to preserve the character and appearance of the CA. These aspects of the proposal fail to accord with Local Plan Policies ENV1, ENV 7 and ENV9 and NNP Policy N4 as set out above, and Local Plan Policies QOP1, QOP2 and HOU9, which collectively seek to preserve the character of the area. The proposal would also be contrary to the provisions of the Framework in relation to heritage assets and design which seek to ensure, amongst other matters, that development is sympathetic to local character.
With regard to the proposed two-storey rear extension, I am satisfied that this aspect would not harm the appearance of the appeal property and would preserve the appearance of the CA. Consequently, the proposed works accord with the aforementioned policies.
Section 08
Living conditions
No 11 is an end of terraced property, with No 9 its immediate neighbour. I saw that No 9 currently has an open-ended single-storey, predominantly flat-roofed structure to the rear, which infills the majority of the rear yard and extends from the main rear 3 [name] v SSE (1992) and [address] (2014) 4 Timmins v [name] [2014] EWHC 654 (Admin) elevation up to approximately half the depth of the yard. Its roof partially encloses the main ground floor rear window, and a door and window within the existing single-storey outrigger.
At the time of my site visit (mid-morning), the sky was clear, and I saw that the majority of the flank and rear elevation of No 11, together with the rear elevation of No 9 and a large section of the remaining terrace within which the appeal site is situated, was in shade.
I have nothing before me from either of the main parties to demonstrate what the current level of sunlight the rear habitable rooms of No 9 currently receive. Based on the evidence before me and observations on site, it is unlikely that the amended proposed rear extension, which would be set off the boundary with No 9, would restrict the amount of sunlight to the rear habitable rooms of No 9 any more than the current situation.
With regard to the private amenity space of No 9, I saw that the area closest to the rear elevation was partially enclosed, and that the area closest to the rear lane was open to the elements. Given that the depth of the two-storey rear extension would be set off the rear lane, it is likely that it would terminate approximately in line with the open area of the yard. Based on the evidence before me and observations on site, I am not satisfied that the two-storey rear extension would adversely affect the living conditions of residents of No 9 when within their private amenity space.
The Council contends that the rear extension upon which it made its decision would be set approximately 0.9 metres from the shared boundary and that it breached its 45-degree test. The amended plans I am basing my assessment on were before the Council at the time it made its decision and demonstrate that the rear extension would now be set further from the shared boundary. The Council have not provided anything in its evidence to show the extent of the breach with regard to the amended scheme. From the evidence before me, given that the proposed development would now be set significantly further from the boundary, and in the absence of anything to the contrary, it is likely that the proposed development would no longer breach this test.
For the above reasons, I conclude that the proposed two-storey rear extension would not result in unacceptable living conditions for the occupants of No 9. Accordingly, there would be no conflict with Local Plan Policies HOU 9 and QOP 2, and NNP Policy N1 which collectively seek, amongst other matters, for development to ensure no harm to residential amenity with regard to sunlight.
Section 09
Other Matters
I acknowledge that the appellant contends that they have sought to work with the Council and sympathise with the appellant’s frustrations with the Council’s handling of their planning application, which includes, amongst other matters, its failure to undertake a joint site visit. However, these matters are not within the scope of my assessment, which must focus on the planning merits of the appeal. Any concerns relating to its conduct are best addressed through direct engagement with the Council, utilising any complaints procedure that it may have.
Section 10
Conditions
The Council has suggested a number of conditions which I have considered against the tests set out in the Framework and Planning Practice Guidance. I have only taken on board those which relate to the element I am allowing.
With regard to its suggested condition 2, whilst there is nothing in the evidence which sets out the reasoning behind its suggestion, the appellant, in their statement (paragraph 4.2), does state that the side gable window would be obscured to protect privacy. As this aperture has been installed and without anything to demonstrate that it is obscure, I consider it reasonable to impose a condition to require the installation of obscure glazing within three months of the date of this
Section 11
decision.
To ensure there is a biodiversity enhancement, it is necessary to impose a condition seeking a bird box to be installed in the two-storey rear extension, following best practice guidance.
Given that I am allowing the two-storey rear extension, I also consider it necessary to impose the standard time limit condition to ensure that works are undertaken within three years of this approval. Furthermore, it is necessary to ensure that the development is carried out in accordance with the approved plans for the reason of certainty. In the interests of the character and appearance of the area, I have also considered it necessary to impose a condition relating to materials matching those in the existing dwelling.
Section 12
Conclusion
For the reasons given above, I conclude that the appeal in relation to the front and rear dormers should be dismissed due to the harm to the character and appearance of the building, the CA and conflict with the development plan. However, no harm would arise from the two-storey rear extension, and this part of the scheme would comply with the relevant policies of the development plan and should be allowed. Accordingly, I shall allow the appeal in part, subject to the conditions set out above, and dismiss the appeal insofar as it relates to the front and rear dormers.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5633No official casework-database value to compare
- Extracted decision date · page 1
- 24 February 2026Matches the official casework database
- Extracted site visit dates
- 2 December 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3374690
- Application reference
- 25/02542/FUL
- Lead case reference
- Not recorded
- Planning authority
- Northumberland County Council
- Planning authority code
- E06000057
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 151 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Split Decision
- Decision category
- Split decision
- Received date
- 16 October 2025
- Valid date
- 21 October 2025
- Start date
- 27 October 2025
- Planning authority decision date
- 26 September 2025
- Appeal decision date
- 24 February 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 84859
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21