Skip to main content
Official casework recordDismissedCurrent release

Appeal 3375487

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey side extension, single storey side to rear extension (demolition of side to rear extension).

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are the effect of the proposed development on: • the character and appearance of the area; and • flood risk.

  3. Section 04

    Character and appearance

    The appeal site is a semi-detached bungalow occupying a prominent corner plot within a residential area characterised predominantly by bungalows. At the time of my visit, the property had already been altered through a hip‐to‐gable roof extension and rear dormer window, altering the original hipped‐roof form shown on the submitted existing plans.

    The proposed development would introduce a wraparound single‐storey extension extending the full depth of the side boundary and across the rear elevation, broken only by a small courtyard gap to the side elevation. In practice, it would read as a largely continuous addition enveloping two sides of the bungalow.

    At my visit, I observed the existing flat‐roofed rear extension with a tall parapet. Whilst visible from the street, that structure is confined to the rear and set away from boundaries, thus limiting its visual effect on the wider streetscape. I also noted some examples of side and rear extensions on other corner plots in the area, which generally retain separation to the site boundaries and a subservience to the main dwelling, thereby preserving the established rhythm and spaciousness of the street scene.

    Policy CS1 of the [name], February 2012 (the CS) and Policy DM1 of the Harrow Council Development Management Policies, July 2013 (the DMP) collectively require high‐quality design that responds positively to the local context and respects local character. The Residential Design Guide Supplementary Planning Document (the SPD) advises that corner sites are particularly sensitive, and that side extensions have considerable potential to cause harm if they erode the characteristic openness of such plots. Among other objectives, the SPD requires development proposals to consider the pattern of development, local character, and the need for extensions to remain subordinate to the host building.

    In this case, the flat roof of the proposed extension would project above the bungalow’s original eaves line and would extend directly to the side boundary in a highly prominent position. Combined with the wraparound form, this would substantially increase the perceived bulk of the dwelling when viewed from the public realm. The result would be an overly dominant and incongruous addition, at odds with the modest scale of the host bungalow and the openness that characterises corner plots in the area. The proposal would therefore disrupt the established pattern of development, appearing uncharacteristic and visually intrusive.

    I note the appellant’s references to matching materials, the presence of other extensions in the locality including the use of flat roofs, and the courtyard break in the built form. However, the development must be assessed on its own merits, and these factors do not overcome the fundamental concern that the proposal’s height, boundary siting and overall bulk and massing would erode the open character of the corner plot and would fail to read as a subordinate addition.

    Accordingly, I conclude that the proposed development would harm the character and appearance of the area and would conflict with Policy CS1 of the CS and Policy DM1 of the DMP, as well as the provisions of the SPD, the aims of which have previously been set out. It would also conflict with the relevant provisions of the National Planning Policy Framework (the Framework), which have similar aims.

  4. Section 05

    Flood risk

    A Flood Risk Assessment (FRA) accompanied the planning application. This states that whilst part of the appeal site lies within [name] 2 on the Environment Agency’s Flood Map for Planning, the footprint of the dwelling and the proposed extension are within [name] 1. Even so, the FRA acknowledges that parts of the site are subject to both fluvial and surface‐water flood risk, and that the site also lies within a Critical Drainage Area.

    In such circumstances, Policies DM9 and DM10 of the DMP require proposals to demonstrate that development will be resistant and resilient to all relevant sources of flooding, will not increase flood risk elsewhere, and will make adequate provision for the management, control and reduction of surface‐water run‐off. Policy DM9 requires evidence that development minimises the risk of flooding on site and does not increase the risk of flooding elsewhere, with appropriate mitigation and measures to manage floodwater movement and storage. Policy CS1 of the CS similarly seeks to manage development to achieve an overall reduction in flood risk and to increase resilience to flood events across the Borough. Policy SI 12 of the London Plan, March 2021 (the LP) reinforces these objectives by requiring that development proposals ensure flood risk is minimised and mitigated, and that residual risk is addressed.

    The FRA asserts that any displaced floodwater would be contained within the plot. However, it also confirms that no site‐specific topographic survey was undertaken. The statements regarding existing ground levels, including that a natural depression in the rear garden would be capable of providing compensatory flood storage, are unsupported by measured data, surveyed levels, or any volumetric

  5. Section 06

    assessment.

    From the evidence before me, I am provided with no reliable indication that the curtilage could accommodate the displaced volume of water identified by the FRA. In the absence of quantified modelling or other substantive evidence demonstrating that floodwater could be safely stored on site, the proposal fails to demonstrate that it would satisfy the development plan requirements for managing the displacement of floodwaters and providing suitable compensatory flood storage.

    The appellant contends that outstanding matters could be resolved through the imposition of conditions requiring the submission of further details. However, the information before me provides insufficient reliable evidence that the site could accommodate the necessary compensatory flood storage in principle, nor that any necessary engineering solution would be deliverable within the physical constraints of the plot. In these circumstances, the absence of detail prevents me from confidently concluding that an acceptable solution is realistically achievable. A condition cannot be used to defer consideration of a matter that goes to the principle of whether the development can be made safe without increasing flood risk elsewhere, nor is it appropriate where there remains a risk that the required mitigation may ultimately be undeliverable.

    Accordingly, I conclude that the proposed development fails to demonstrate that it would not result in the displacement of flood waters, and it has not been demonstrated that suitable compensatory flood storage could be provided on site. The development would therefore have an unacceptable impact in terms of flood risk, and would conflict with [name] DM9 and DM10, CS Policy CS1, and LP Policy SI 12, the aims of which have previously been set out. It would also conflict with the relevant provisions of the Framework, which have similar aims.

  6. Section 07

    Conclusion

    For the reasons given above, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4240No official casework-database value to compare
    Extracted decision date · page 1
    31 March 2026Matches the official casework database
    Extracted site visit dates
    19 February 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3375487
Application reference
PL/1044/25
Lead case reference
Not recorded
Planning authority
London Borough of Harrow
Planning authority code
E09000015

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
5 November 2025
Valid date
14 November 2025
Start date
14 November 2025
Planning authority decision date
15 August 2025
Appeal decision date
31 March 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
86802
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21