Appeal 6000037
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
part single, part two storey rear extension with 2no. roof lanterns and 2no. rooflights. (Amended plans and proposals.)
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The application was made in the name of [name] and the agent is identified as [name]. Subsequently, [name] has confirmed that [name] is acting on behalf of them and the appeal proceeds on this basis.
The description of the development on the application form is: ‘Proposed single storey 5m rear extension; Proposed part 3m 1st floor extension. - [name]: Full width rear dormer and 2 velux windows to the front elevation.’ The appellant advises that the description was changed during the application process because the local planning authority (‘LPA’) requested some changes to be made because the proposed alterations to the roof were considered permitted development and an amendment was made to the first floor roof of the proposed extension (‘amended proposal’). The LPA determined the appeal on the basis of the amended proposal and my Decision reflects this.
During my visit, I observed that the roof alterations in the form of the rear dormer had been considerably advanced. Therefore, my assessment of the appeal includes this.
Section 04
Main Issue
The main issue is the effect of the proposal on the appeal property and character and appearance of the area.
Section 05
Reasons
The appeal site comprises a two storey, semi-detached dwelling and associated amenity space. The surrounding area is predominantly residential in character and comprises two-storey, semi-detached dwellings, most of which have single storey rear extensions, and some which of have rear dormers. Appeal Decision: 6000037
In addition, the appellant has referred me to examples of other rear extensions in the area, which incorporate first floor elements. Therefore, and whilst the LPA has suggested that other larger ground floor and first floor extensions were allowed under different circumstances, these still inform the character and appearance of the area.
The proposal is for a part single and part two-storey rear extension. The single storey part of the proposed extension, would be about 5m deep, which exceeds the 3.5m depth for rear extensions to semi-detached houses, as set out in the Supplementary Planning Document: Residential Design Guidance October 2016 (‘[name]). However, the [name] is guidance and does state that on widely spaced semi-detached or detached houses, there may be more scope for larger rear extensions.
In this case the adjoining property at [address], already incorporates a single storey extension and the proposed single storey extension would not significantly project beyond the rear of this existing extension. The dwelling on the other side ([address]) is separated by the width of an existing access. As such, because of this widely spaced arrangement relative to this property and the existing extension at [address], the single storey part of the proposed extension, despite its depth would not result in any significant sense of enclosure, loss of outlook and light for neighbouring properties.
Similarly, the two-storey part of the proposed extension, because of its separation from neighbouring properties and limited depth, the proposed two-storey element, would not result in any unacceptable impact on neighbours.
In the context of the surrounding area, the existing property which incorporates a dormer and retains a sizeable garden, the proposed extension would not be unduly bulky or prominent.
Nevertheless, the first floor part of the proposed extension incorporates a gabled roof form and although on the amended proposal this is shown projecting off the original roof slope of the appeal property, if this appeal succeeds it is more than likely that this would extend off the ‘as built’ roof form, which now incorporates a rear dormer. In particular, the gabled roof of the proposed first floor extension would be attached to and would obscure part of the dormer. This uncharacteristic arrangement reflects poor design and would harm the appearance of the appeal property and detracts from the character and appearance of the area, where in general first floor rear extensions remain separate from dormers.
I am aware that the appellant has amended the design of the roof of the first floor part of the extension based on the LPAs advice and an alternative design exists for this as shown on the original drawings submitted with the application. Even so, and for the reasons already given, I have determined the appeal on the basis of the amended proposal.
Accordingly, I find conflict with Policy DM01 of the Development Management Policies Development Plan Document (September 2012) and Policy CS5 of the Local Plan Core Strategy (September 2012) and Policy D3 of the London Plan (2021). Together, these policies require proposals to be of high quality that preserve or enhance local character. Appeal Decision: 6000037
Section 06
Conclusion
For the above reasons, I conclude that the appeal should be dismissed
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 196No official casework-database value to compare
- Extracted decision date · page 1
- 2 April 2025Matches the official casework database
- Extracted site visit dates
- 25 February 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6000037
- Application reference
- 24/3039/HSE
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Barnet
- Planning authority code
- E09000003
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- No Application Type Assocaited
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 45 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 3 December 2024
- Valid date
- 20 December 2024
- Start date
- 20 December 2024
- Planning authority decision date
- 30 September 2024
- Appeal decision date
- 2 April 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 67376
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21