Skip to main content
Official casework recordDismissedCurrent release

Appeal 6000050

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

4 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

loft L shaped dormer, raising of the ridge, internal alterations, floor plan redesign and all other associated works at [site address] , Penge, Bromley, London [postcode] . Application Ref: DC/24/02567/FULL6.

  1. Section 02

    Issue – effect on the character and appearance of the area

    While there are nearby examples of properties that have been subject of modest upward extensions, when viewed from the gently sloping [address] (the road), there remains a pleasing general consistency between the height of the road and the individual properties addressing it.

    Although the increase to the ridge height of the dwelling on the appeal site would not be substantial, the property would become materially and obviously taller than both adjacent properties in the terrace. Consequently, and even though the proposed external materials would relate well to the host dwelling, the development would disrupt and harmfully reduce the regularity and sense of uniformity of development within the nearby area.

    Although there are other examples of second-floor, flat-roofed, dormer extensions in the area, the proposed rear extension would be almost as high as the proposed ridge of the host dwelling. It would also project close to the far edge of the existing rear outrigger. As such, and whether or not it would be visible from publicly accessible land, from the rear gardens of both the host dwelling and neighbouring properties, it would appear as a bulky and dominant addition to the rear of the building, and it would be incongruous with other more modest and simple rear outriggers within the same terrace.

    The proposal would unacceptably harm the character and appearance of the area, and in this respect, it would be contrary to the policies cited in the decision notice. Issue – effect on the living conditions of the occupiers of [address] (number 40), with particular regard to light and outlook

    The upward extension to the rear outrigger would be visible through the rear-facing windows in the main part of the house at number 40. However, this part of the development would be set back from the shared boundary between the properties. As such, and notwithstanding the proposed increase in height to this part of the building, the occupiers of number 40 would retain a reasonable outlook over and above their rear garden through their rear-facing windows.

    The separation distance between the proposed rear extension and the windows in number 40 would also be sufficient to prevent any harmful reduction in daylight to this neighbouring house. Furthermore, even in the summer months when the sun is highest in the sky, the evidence indicates that the rear of the house at number 40 is in shade for most of the day. As such, and given that the development would project no further back into the site than the existing rear outrigger, any reduction in sunlight into the house at number 40 would be very small in extent and limited to the early morning only.

    The scheme would not cause harm to the living conditions of the occupiers of number 40 with particular regard to light and outlook. In this respect, it would accord with the policies cited in the decision notice.

  2. Section 03

    Other matter

    Given the size of the scheme, any economic and social benefits that would arise would be small.

  3. Section 04

    Conclusion

    Notwithstanding my findings in respect of the second issue, the scheme would be contrary to the development plan as a whole and nothing outweighs this.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2706No official casework-database value to compare
    Extracted decision date · page 1
    5 June 2025Matches the official casework database
    Extracted site visit dates
    6 May 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000050
Application reference
24/02567/FULL6
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
No Application Type Assocaited
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
35 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
10 December 2024
Valid date
10 December 2024
Start date
19 December 2024
Planning authority decision date
19 September 2024
Appeal decision date
5 June 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
70645
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21