Appeal 6000065
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
alterations to the roof with construction of a hip to gable loft conversion including a 400mm roof ridge raise and front slope roof lights.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
On 12 December 2024 the Government published its revised National Planning Policy Framework. Its content relative to the main issue of the appeal is largely unchanged. It has not therefore been necessary to give the parties opportunity to comment on the revisions.
Section 04
Main Issue
The effect on the character and appearance of the existing dwelling and the area.
Section 05
Reasons
The appeal building is a mid-19th century dwelling that faces out over an area of similarly aged development, which includes dwellings that are paired and those that are arranged in terraces. The dwellings in the area are not entirely consistent; some are taller, and some have gabled roof forms; however, hips are a feature of the area, and where low pitched like at the appeal property they have an elegant appearance and contribute to the character and appearance of the area.
To the rear the appeal site has quite a different setting, with an area of mid-20th century residential development with dwellings arranged as single plain blocks.
The rear of the appeal dwelling is visible from [address] to the side, and [address] to the rear. Although both are incidental views, the view of the back of the dwelling with its traditional form, that is seen amongst other similarly aged dwellings, is one that contributes to the character and appearance of the area.
The dwelling is semi-detached. A strong sense of symmetry is provided by the parts of the semi-detached pair that are centred on the prominent central chimney and front facing parapet. To either side of this the dwellings have a single road fronting bay, with a matching bay window arrangement and shallow hipped roof. Beyond this to the southwest the appeal dwelling extends further. Although this appears to be part of the original dwelling, it has a secondary form, derived from its set back wall and roof. This gives it the appearance of an extension to the primary block that is centred on the main chimney breast.
The proposal would see the roof to this part of the dwelling extended up and out so that it forms a full gable to the side. This would make it more dominant, which would harm the existing arrangement whereby this wing has a subsidiary relationship to the part that it sits alongside. Raising the ridge height would also mean that the ridge would no longer be neatly centred on the chimney. The effect would be a modest erosion of the character and appearance of the existing dwelling, and the neat and carefully considered design of the pair of dwellings with their primary and secondary elements.
At the rear the change would be much more noticeable. The rear roof would be entirely obscured by a prominent and assertive rearward extension. This would dominate the rear aspect of the dwelling and obscure the elegant form of its original low-slung roof. Although public views of the rear of the building are largely limited to those identified above, where glimpsed it would draw the eye owing to its scale, and its incompatibility with the traditional design language of the existing dwelling. It would appear entirely out of place when viewed amongst the traditional forms of the adjacent 19th century dwellings.
In summary, the proposal would harm the character and appearance of the existing dwelling and the wider area. It would not accord with Policies 6 and 37 of the London Borough of Bromley Local Plan 2019, which seek to ensure that development proposals are designed to a high standard, respect or complement the host dwelling, are attractive, and contribute positively to the streetscene.
Section 06
Conclusion
For the reasons above, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 77No official casework-database value to compare
- Extracted decision date · page 1
- 31 March 2025Matches the official casework database
- Extracted site visit dates
- 18 March 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6000065
- Application reference
- DC/24/03504/FULL6
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Bromley
- Planning authority code
- E09000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- No Application Type Assocaited
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 600 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 31 December 2024
- Valid date
- 31 December 2024
- Start date
- 8 January 2025
- Planning authority decision date
- 28 November 2024
- Appeal decision date
- 31 March 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 67217
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21