Skip to main content
Official casework recordAllowedCurrent release

Appeal 6000232

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘installing a 20m pole supporting 6no. antennas, the installation of 2no. equipment cabinets and 1no. meter cabinet, and ancillary works thereto.’

  1. Section 02

    Decision

    The appeal is allowed and prior approval is granted under the provisions of Article 3(1) and Schedule 2, Part 16, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for a 20m pole supporting 6no. antennas, the installation of 2no. equipment cabinets and 1no. meter cabinet, and ancillary works thereto at The [site address] in accordance with the terms of the application, Ref: 24/3658/PNT and the details submitted with it, including [name] 100 A, 200 A, 201 A, 300 A, 301 A; and the details of the external materials and colours specified on page 16 of the appellant’s ‘[name] document prepared by Cornerstone and Waldons.

  2. Section 03

    Preliminary Matters

    The provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (the GPDO), under Article 3(1) and Schedule 2, Part 16, Class A, [name].3(4) require the local planning authority to assess the proposed development solely on the basis of its siting and appearance, taking into account any representations received. My determination of this appeal has been made on the same basis.

    The principle of development is established by the GPDO and the provisions of Schedule 2, Part 16, Class A of the GPDO do not require regard to be had to the development plan. However, I have had regard to the policies of the Council’s Barnet Local Plan 2021-2036 (2025) (BLP) and the National Planning Policy Framework (the Framework) only in so far as they are a material consideration relevant to matters of siting and appearance.

    The Council has recently adopted the BLP. As a result, the BLP now forms part of the development plan. It has replaced Barnet’s Local Plan ([name]) Development Plan Document (CS) and Barnet’s Local Plan (Development Management Policies) Development Plan Document (DMP), which are cited in the reason for refusal. The Council has advised in its Statement of Case at paragraph 5.20 which BLP policies are now relevant. The appellant has had the opportunity to comment on the relevant policies of the BLP during the appeal process.

  3. Section 04

    Main Issue

    The main issue is the effect of the siting and appearance of the proposed development on the character and appearance of the area, including the [name] (MOL) and if any harm would occur, whether this is outweighed by the need for the installation to be sited as proposed, taking into account any suitable alternatives.

  4. Section 05

    Reasons

    The appeal site is situated on a parcel of land in [site address] (the club). The club is accessed off Southover. The club comprises a club house, children’s play park, playing fields and tennis courts. Overall, the club is open in nature, providing relief to the more built-up suburban area surrounding the site. The openness of the site contributes positively to the character and appearance of the area.

    The proposed pole would be taller than other structures in the immediate surrounding area. However, it would be set against a backdrop of dense tree coverage which would provide some screening, particularly when the trees are in full leaf.

    The evidence before me indicates that the tallest tree in proximity to the appeal site is 13m in height. The proposed pole would be 20m. As such, a significant proportion of the pole would be viewed against the trees. Furthermore, the evidence outlines how the pole would be a dark green shade, therefore somewhat blending into the trees. The upper part of the pole would protrude above nearby trees and so would be visible against the sky. The appellant’s evidence outlines how the antenna needs to be sufficiently elevated to clear the tree line. Nonetheless, the upper part would be a light grey shade, assimilating with the backdrop of the cloudy sky. Furthermore, the light grey shade would also not be a prominent feature against the backdrop of the sky on a clear day.

    The top part would be viewed alongside wider views of high fencing at the tennis courts beyond the appeal site, reducing any visual impact. Given the above factors, the proposed pole with antenna would not be an unduly prominent feature within the landscape.

    Given the proposal’s location, on the periphery of a playing field and significantly set back from the road, views from Southover would be extremely limited. Furthermore, the entrance to the club, off Southover, benefits from dense vegetation and tree coverage, further minimising any views from Southover. Due to significant separation distances, views from the residential properties along Northiam and [name] would be limited. Furthermore, the views from these areas would be against the backdrop of dense tree coverage. Views from [address] would also be limited given the intervening dense tree coverage.

    Although there would be medium to short term views from within the club grounds, as outlined previously I do not consider that the pole would be an unduly prominent feature. The club would continue to provide relief to its more built-up surroundings, notwithstanding the introduction of the proposed development, and would remain a largely open feature that positively contributes to the character and appearance of the area.

    The number of associated ground-based cabinets would not be excessive and would be modest in scale. Their tight knit siting, functional design and appearance, together with their green finishes would ensure they would not be prominent features and would integrate well into their surroundings. I therefore find the siting and appearance of the proposed cabinets and equipment to be acceptable. It is noteworthy that the Council found similarly, outlining how naturally they would have a limited impact.

    The Council raise concerns regarding the effect of the proposed development on MOL. Policy G3 of the London Plan (2021) (LP) affords MOL the same protection as Green Belt. However, as this is an appeal against prior approval, the principle of development is not for consideration and the question of whether the proposal represents inappropriate development in the MOL does not arise. I also do not consider that the scheme would result in urban sprawl. Although it is situated on playing fields, the playing fields are in a residential area.

    My attention has been drawn to a recently dismissed appeal (APP/N5090/W/21/3273436). However, the two schemes are not directly comparable. The referenced appeal site was located on a grass verge off Southover, and therefore that mast would have been highly visible from it. Furthermore, the Inspector outlined how adjacent trees would only provide limited screening, being some distance away from the mast. Although that site was located close to the MOL, it was not in it, so it was not a consideration for the Inspector. I have therefore afforded reference to this scheme limited weight in favour of the Council’s position.

    The Council stipulate that no details of the proposed materials have been provided. However, the appellant’s ‘[name] document was submitted with the application and sets out the materials which include galvanised steel. This material would be typical of such a structure and is considered acceptable.

    For the above reasons, I therefore conclude that the siting and appearance of the proposed installation would not result in harm to the character and appearance of the area, including the MOL. Thus, insofar as they are material considerations, the proposal would comply with Policies CDH01, ECC06 and TRC04 of the BLP. Collectively these policies, amongst other things, require development to respect local character and have no significant adverse effect on the space in which they are located. The proposal would also comply with Section 10 of the Framework, as a material consideration, which supports high quality communications infrastructure.

  5. Section 06

    Other Matters

    At paragraph 2.3 of the Council’s Statement of Case, it has also listed other BLP policies, outlining the new policies BLP policies which have replaced the old local plan policies listed in the decision notice. Policies HOU03, ECC05 and CDH04 of the BLP relate to residential conversions and redevelopment or larger homes, [name] and [name] and tall buildings. Whilst there would be no conflict with them, I do not find them to be relevant to the decision.

    The Framework sets out that proposals for a new mast should be supported by the necessary evidence, including evidence that shows the possibility of erecting antennas on an existing building, mast or structure has been explored. The evidence indicates that several alternative sites have been considered and discounted for specified reasons such that there are no suitable, available sites within the target coverage area. There is no substantive evidence that challenges the rationale for discounting the alternatives. As such, the appellant has met the requirements of the Framework in this regard.

    Concerns have been raised about potential effects on health, including that of young children and babies. However, the appellant has provided a certificate to confirm that the proposal has been designed to comply with the guidelines published by the International Commission on [name] (ICNIRP). In these circumstances, the Framework advises that health safeguards are not something which a decision-maker should determine. No sufficiently authoritative evidence has been provided to indicate that the ICNIRP guidelines would not be complied with or that a departure from national policy would be justified.

    Representations have referred to the opportunity of the appellant to use alternative sites to accommodate the appeal proposal. However, whilst I have taken account of these matters, I have found the siting and appearance of the proposed installation to be acceptable in relation to its effect on the character and appearance of the area. Thus, it is not necessary for me to consider the detailed merits of any potential alternative site or the possibility of erecting antennas on an existing building, mast, or other structure.

    Interested parties have also questioned the need for the installation. However, the Framework is clear that advanced, high quality, telecommunications are essential for economic growth. It also sets out that competition between operators should not be prevented, nor should the need for the telecommunications system be questioned.

    With regard to other concerns raised by interested parties, comments made in relation to wellbeing, environmental impacts including wildlife, impacts on highway and pedestrian safety, the history of a local football club and ability of local organisations to recruit do not change my findings in relation to the main issue. There is no compelling evidence before me to justify such matters, and in any case, my considerations are limited to the siting and appearance of the apparatus in accordance with the relevant legislation as set out in the procedural matters above. The effect on property values and private views has also been raised, however as private interests, these are not matters which would justify dismissing this appeal.

    Interested parties have raised concerns that the application is similar to a previously refused application. I have however assessed the appeal on its own merits and outlined my reasoning above. Concerns are also raised regarding the lack of time to respond to notification letters and nearby residents not being informed of the proposal. The evidence before me however indicates that public consultation was carried out accordingly.

  6. Section 07

    Conditions

    The Order does not provide any specific authority for imposing additional conditions beyond the deemed conditions for development by electronic communications code operators contained within it. These specify that the development must be carried out in accordance with the details submitted with the application, begin within 5 years of the date of the approval and be removed as soon as reasonably practicable after it is no longer required for electronic communications purposes and the land restored to its condition before the development took place.

    The Council has suggested conditions relating to a 3 year timescale for implementation and compliance with the submitted plans. However, the timescale for implementation under Class A, Part 16 of the GDPO is 5 years. The condition relating to the submitted plans would duplicate a condition already imposed by the GPDO. I have therefore not imposed the suggested conditions.

  7. Section 08

    Conclusion

    For the reasons given above, I conclude that the appeal should be allowed, and prior approval should be granted.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4471No official casework-database value to compare
    Extracted decision date · page 1
    28 August 2025Matches the official casework database
    Extracted site visit dates
    30 July 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000232
Application reference
24/3658/PNT
Lead case reference
Not recorded
Planning authority
London Borough of Barnet
Planning authority code
E09000003

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Prior Approval
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,000 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
28 April 2025
Valid date
28 April 2025
Start date
8 May 2025
Planning authority decision date
29 October 2024
Appeal decision date
28 August 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
75443
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:28