Skip to main content
Official casework recordDismissedCurrent release

Appeal 6000233

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described on the application form as, “The proposal consist on a hip- to-gable roof conversion, dormer window to the rear of the property and a skylight towards the front of property”.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the area.

  3. Section 04

    Reasons

    The appeal site comprises [site address] (No 41), a 2-storey semi-detached dwelling situated within a row of 2-storey semi-detached dwellings in a predominantly residential area. Whilst a small number of exceptions to the established design aesthetic exist, including [address], much of [address] in the vicinity of the site consists of semi-detached dwellings of a similar design, with hipped roofs.

    The proposed rear dormer would span across the full width of No 41’s rear elevation. Its maximum height would be equal to that of No 41’s roof ridge. With a depth of approximately 3 metres, it would be considerable in size and scale when compared with No 41 as existing. As such, it would not be secondary in scale to the main roof, contrary to the guidance given in paragraph i.67 of the SPD1. Due to its size and scale, it would not harmonise well with No 41’s existing appearance. It would appear when seen from the rear gardens of nearby dwellings as an overly-dominant and bulky feature upon No 41’s rear elevation. Its bulk would be accentuated by the proposed use of full-height clear glazed windows, which is not a common feature on the site’s side of [address].

    I observed that [address], which has previously been extended with (amongst other alterations) a gable end, and [address], which has been significantly extended by way of (amongst other alterations) a 2-storey side extension, both appear imbalanced in comparison with the other half of their 1 Urban Design Guide Supplementary Planning Document (adopted 2023) respective semi-detached pairs. Hence, these examples do not represent desirable precedents.

    In a similar vein, the hip-to-gable element of the proposed loft conversion would result in No 41 appearing noticeably imbalanced in comparison with the other half of the semi-detached pair of which it forms a part, which has not been extended in this way. The new gable end would also combine with the remainder of the side elevation to create a largely blank and featureless façade, thereby undermining No 41’s presently attractive contribution to the street scene. The proposed use of matching tiles and render would not adequately mitigate these negative effects. Harm to the character and appearance of the area would result.

    Whilst it is recognised that the potential exists for nearby dwellings to extend through the use of permitted development rights, this appeal must be determined on the basis of the currently-prevailing circumstances. This is not a matter which alters my findings on this main issue.

    I therefore find that the proposed development would have an unacceptable and harmful effect on the character and appearance of the area. It would conflict with part i. of Policy DH1 of the Royal Greenwich Local Plan: [name] with [name] (adopted 2014) (Local Plan) which provides that, amongst other things, to achieve a high quality of design, all developments are expected to provide a positive relationship between the proposed and existing urban context by taking account of the scale, height, bulk and massing of the adjacent townscape, and with part iii. of Policy DH(a) of the Local Plan which provides that, amongst other things, all new roof extensions should be designed to respect the scale and character of the host building, the street scene and the surrounding area.

    The proposed development would also conflict with part 11) of Policy D3 of the London Plan (published 2021), which provides that development proposals should respond to the existing character of a place by identifying the special and valued features and characteristics that are unique to the locality and respect, enhance and utilise the heritage assets and architectural features that contribute towards the local character.

  4. Section 05

    Other Matters

    The proposed development could result in benefits to the Council in relation to Council tax. The Planning Practice Guidance however makes it clear that it would not be appropriate to make a decision based on the potential for a development to raise money for a local authority or other government body2. This is a neutral matter, which does not weigh in favour of the proposed development.

  5. Section 06

    [name] and Planning Balance

    Reference has been made to the potential exercise of permitted development rights under Class B of Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), which could potentially include the formation of a hip-to-gable roof extension with a rear dormer. I have no reason to doubt that this right would be exercised in the event that this appeal is dismissed. 2 Paragraph 21b-[phone]

    The appellant has stated that the proposed dormer would not qualify as permitted development due to its scale. A dormer of a lesser scale constructed via Class B would likely appear less imposing upon the rear elevation of No 41. No plans or drawings have been provided to substantiate the appellant’s assertion that visual fragmentation would result from a smaller or stepped dormer addition to the rear of No 41. As it has not been demonstrated that the exercise of Class B would result in a more harmful development than that proposed, this matter merits little weight in favour of the proposed development.

    The proposed development would provide additional living space at No 41, which would accord with contemporary expectations, to the benefit of the current and future occupiers of No 41. As this would mainly comprise a private benefit, it merits little weight in favour of the proposed development.

    The proposed development would make an effective use of land, and would provide economic benefits to the local area by, amongst other things, providing work for construction professionals. Whilst these matters are supported by the National Planning Policy Framework (the Framework), it has not been demonstrated that the totality of these benefits in this case would be significant. In combination, these matters merit little weight in favour of the proposed development.

    The proposed development would not contribute towards the creation of high quality places, which the Framework emphasises is fundamental to what the planning and development process should achieve. As a matter of planning judgement I therefore find that the collective benefits of the proposed development, which would be minimal in planning terms, would not be sufficient to outweigh the harm identified on the main issue above. The relevant material considerations do not indicate that the appeal should be decided otherwise than in accordance with the development plan.

  6. Section 07

    Conclusion

    For the reasons given above, having considered the development plan as a whole, the approach in the Framework, and all other relevant material considerations, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 368No official casework-database value to compare
    Extracted decision date · page 1
    30 September 2025Matches the official casework database
    Extracted site visit dates
    18 September 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000233
Application reference
25/0252/HD
Lead case reference
Not recorded
Planning authority
Royal Borough of Greenwich
Planning authority code
E09000011

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
222 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
29 April 2025
Valid date
29 April 2025
Start date
14 May 2025
Planning authority decision date
20 March 2025
Appeal decision date
30 September 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
77160
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21