Skip to main content
Official casework recordDismissedCurrent release

Appeal 6000432

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the demolition of existing dwelling and construction of six dwellings and associated landscaping.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    As part of their case the appellant has submitted a revised access arrangements plan. I am mindful that the appeal process should not be used to evolve a scheme, and it is important that what is considered by the Inspector is essentially what was considered by the Council. I have therefore proceeded to determine the appeal on the basis of the plans as originally submitted.

  3. Section 04

    [name]

    The main issue is the effect of the proposal on highway safety with particular regard to the access.

  4. Section 05

    Reasons

    The appeal site was formerly used as a plant nursery and currently comprises a vacant single storey detached bungalow and garage along with a car parking area and large garden. To the east and north of the site are residential properties which were delivered as part of a [name] (SUE). To the west of the site is a care home and its associated gardens.

    [site address] is an existing vehicular access to the site from [address]. This access is located in proximity to the signalised junction of [address] with [address] and [address] which was installed as part of the SUE development.

    During my site visit I saw frequent vehicle movements in both directions along [address]. On the eastbound side, vehicles stopped by the traffic lights regularly resulted in queues extending past the access to [site address] . Consequently, vehicles turning right into the site from [address] would need to stop in the westbound carriageway and wait for the queue of traffic to clear before being able to enter the site.

    Whilst vehicle speeds may be reduced through the junction, I saw that vehicles travelling west on [address] generally accelerated soon after the junction. Those travelling westbound through the junction are unlikely to be anticipating vehicles slowing to turn right towards the site. Furthermore, given the proximity of [site address] to the junction, drivers would have little opportunity to signal their intention to turn right into the access. There is also limited space available within the westbound carriageway for vehicles to wait to turn right into the site, whilst allowing other vehicles to pass safely. This combination of factors is likely to result in driver confusion and conflict between vehicles, increasing the risk of collisions.

    Furthermore, there is a cycle way marked within the eastbound carriageway of [address]. Signage within the footway near to [site address] also indicates it may be shared by pedestrians and cyclists. Consequently, there is the potential for vehicles waiting on the footway to exit the site to conflict with the movement of pedestrians and cyclists travelling along this part of [address], increasing the risk of vehicles colliding with other users of the highway.

    The appellant has submitted a Stage [address] [name] ([name], 20/05/25) as part of their appeal submission. This recommends a dedicated space within the carriageway for vehicles waiting to turn right into the site and a yellow box or ‘keep clear’ markings in the eastbound carriageway to facilitate vehicles moving into and out of the site. However, there is scant detail before me of these proposed mitigation measures. As such, I cannot be certain that they would enable safe and suitable vehicular access to the site. Furthermore, there is no suggested method by which to secure these measures given they would be required on land outside of the boundary of the appeal site.

    The submitted plans only show a visibility splay to the west of the site. No visibility splay is shown to the east, and the Council contends that visibility in this direction is restricted by the boundary fencing of the adjacent property. However, during my site visit I saw that this fencing is low level and set back from the footway along [address]. I therefore consider that an acceptable visibility splay could be achieved to the east of the site. Details of the visibility splay could be secured by the imposition of an appropriate condition, if the development had been otherwise acceptable.

    I understand that the plant nursery was still in operation and accessed via [site address] , without issue, for some time after the SUE development and the signalised junction on [address] was introduced. It is also suggested that the proposed development would generate fewer vehicle movements than the previous use. However, there is little before me to substantiate these points. As such, this consideration does not alter my conclusion on this matter.

    Reference is made to other access roads in the vicinity of the site and access arrangements in Shrewsbury town centre. However, I have not been provided with details of these. Therefore, I do not know whether they are directly comparable to the appeal proposal, which I have determined on its own merits.

    Taking all of the above into account, I find that it has not been demonstrated that safe and suitable vehicular access to the site can be achieved and the proposal would therefore have a harmful effect on highway safety. As such, it would conflict with Policy CS6 of the Shropshire Local Development Framework: [name] 2011 (the CS), which requires all development to be safe and accessible to all.

  5. Section 06

    Other Matters

    I note the letters of support for the proposal, and I acknowledge that no objections have been received. However, the lack of objection does not equate to a lack of harm.

    I acknowledge the comments with regard to the manner in which the planning application was considered by the Council. However, I have determined the appeal on its planning merits.

  6. Section 07

    Planning Balance

    The appeal proposal conflicts with Policy CS6 of the CS which requires all development to be safe and accessible. Paragraph 232 of the National Planning Policy Framework (the Framework) makes it clear that due weight should be given to existing policies according to their degree of consistency with the Framework. In this respect, paragraph 115 of the Framework expects development proposals to ensure safe and suitable access to the site can be achieved for all users. Therefore, the conflict between the proposal and Policy CS6 should be given significant weight in this appeal.

    The proposal would make an efficient use of land and would contribute to the Council’s housing supply through the delivery of 6 additional dwellings. The Council has not raised objection in terms of the site location, the layout and appearance of the proposal and I have no reason to reach an alternative conclusion. The Framework outlines support for bringing forward small and medium sized sites, acknowledging that they can make an important contribution to meeting the housing requirements of an area. I therefore give the benefits associated with the delivery of 6 residential units moderate weight.

    The Council has confirmed that it cannot currently demonstrate a five-year supply of deliverable housing sites. In these circumstances, footnote 8 of the Framework establishes that paragraph 11d) is engaged.

    Paragraph 11 d) ii) states planning permission should be granted unless ‘any adverse impact of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in this Framework taken as a whole, having particular regard to key policies...’. Paragraph 115 of the framework constitutes a key policy for the proposes of paragraph 11 d) ii).

    The Council has not specified the extent of its shortfall, however, as described above, the benefits of 6 dwellings would be moderate, even taking into account the Framework’s objective of significantly boosting housing land supply. Consequently, the proposal’s failure to demonstrate a safe and secure vehicular access and the associated harm to highway safety would significantly and demonstrably outweigh the benefits when assessed against the policies in the Framework taken as a whole. As a result, the presumption in favour of sustainable development does not apply in this instance.

  7. Section 08

    Conclusion

    For the reasons given above, I conclude that the proposal would conflict with the development plan as a whole and there are no material considerations, including the Framework, that would outweigh that conflict. Therefore, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4682No official casework-database value to compare
    Extracted decision date · page 1
    19 November 2025Matches the official casework database
    Extracted site visit dates
    7 October 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000432
Application reference
24/04581/FUL
Lead case reference
Not recorded
Planning authority
Shropshire County Council
Planning authority code
E06000051

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,480 m²
Number of residences
5
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
25 July 2025
Valid date
30 July 2025
Start date
30 July 2025
Planning authority decision date
30 January 2025
Appeal decision date
19 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
80001
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29