Appeal 6000456
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a new build [address] dwelling.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the area.
Section 05
Reasons for the Recommendation
[site address] (No 1) is located in a predominantly residential area. It is mainly characterised by semi-detached and terraced two-storey dwellings often with generous gaps between, particularly at first floor level. Together with the prevailing hipped roof forms, this provides a notable spaciousness to the development pattern.
No 1 sits at the end of a terrace of four dwellings with a substantial gap between its side elevation and the Eltham Green Fellowship Church. The dwellings within the host terrace are all of similar width and share a consistent roof form which is hipped at either end. Combined with the spacing between windows, symmetry of the porches and the facing material arrangement, this gives the terrace considerable balance. Together, these elements positively contribute to the order and spacious characteristics of the street.
I understand that the width of the proposed dwelling is less than the width of those considered under previous applications that were previously dismissed at appeal (APP/E5330/W/23/3331105 and APP/E5330/W/22/3312861). Even so, the mass of the proposal and its projection from the end of the terrace would substantially reduce openness between the terrace and the church. This denser pattern of development would also appear at odds with the spacious characteristics of the area.
In addition, and notwithstanding the matching facing materials, the dwelling’s narrower width, lower ridgeline, set back front elevation and tighter window arrangement when compared to other dwellings in the row would significantly unbalance the terrace to the further detriment of the street scene. Even though the first floor rear projection would be less visible from the street, this would not overcome the other design and layout issues identified.
The cited examples relate to side extensions to dwellings rather than new dwellings and so are not directly comparable to the appeal. Furthermore, the evidence before me indicates that the permissions at 13 and [address] and [address] were granted over 11 years ago, and prior to the adoption of the current Local Plan or London Plan. In any case, these examples do not justify the site-specific harm identified having regard to the prevailing characteristics of the area and the balance of the host terrace.
I conclude, the proposed development would result in significant harm to the character and appearance of the area. In that regard, it would conflict with Policy D3 of the London Plan (2021) and Policies H5, H(c) and DH1 of the Royal Greenwich Local Plan: [name] with [name] (2014) which requires development to respond to the existing character, to achieve a high quality of housing design and an integrated environment, that infill development will only be favourably considered where the character of the area is maintained with particular regard to the scale, design and density of the development, and that all developments provide a positive relationship between the proposed and existing urban context by taking account of the established layout and spatial character.
Section 06
Other Matters
Whilst the appellant’s Design & [name] sets out that the proposal would result in acceptable development in terms of living conditions, quality of accommodation, noise and disturbance, transportation, trees, refuse and recycling facilities, and accessibility, these are usually expected planning requirements rather than matters which justify the harm identified.
Section 07
Planning Balance, Conclusion and Recommendation
The Council has acknowledged that it cannot demonstrate a five-year housing land supply and that its supply currently stands at 2.38 years. There is no evidence before me to suggest this figure is not accurate.
The provision of a single dwelling would make a very limited but positive contribution to the Council’s housing land shortfall and to the diversity of the local housing stock. It would also result in some limited social and economic benefits associated with the construction and future occupation of the proposed development. In the context of a single dwelling, these matters attract modest weight in favour of the proposal.
However, the proposal would result in significant harm to the character and appearance of the area. In this regard there would also be conflict with the development plan. I find that this is a matter of overriding concern and substantially and demonstrably outweighs the modest benefits of the proposal in this instance.
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 08
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 121No official casework-database value to compare
- Extracted decision date · page 1
- 16 February 2026Matches the official casework database
- Extracted site visit dates
- 18 November 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6000456
- Application reference
- 25/0512/F
- Lead case reference
- Not recorded
- Planning authority
- Royal Borough of Greenwich
- Planning authority code
- E09000011
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 400 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 31 July 2025
- Valid date
- 31 July 2025
- Start date
- 5 August 2025
- Planning authority decision date
- 23 May 2025
- Appeal decision date
- 16 February 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 84438
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29