Appeal 6000457

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

construction and operation of a micro energy storage facility.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The effect of the proposal upon the character and appearance of the area, and the significance of the grade II listed building known as [name] Inn1.

  3. Section 04

    Reasons

    The appeal site is an undeveloped grass verge located in a rural area. It is alongside a small settlement that is to one side of a road junction. Apart from the Inn to the north all other development in the area is on the east side of the road, which is the opposite side to the appeal site. Although the land on the other side of the road is developed, the undeveloped appeal site is seen as part of the open agricultural land to the west and is only separated from it by a low post and rail fence.

    Section 66(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 (LBCA) require the decision maker to have special regard to the desirability of preserving a listed building or its setting or any features of special architectural or historic interest which it possesses.

    The listed Inn is to the north of the site. It dates from the 17th century, and the list description suggests it was probably built as a farmhouse. As well as its vernacular appearance, historic fabric and plan form, its significance is also derived from its undeveloped setting. This has been retained to a high degree to three sides of the building, and across a long stretch of the adjacent road the rural setting of the building can be experienced and understood. Although the land opposite the Inn is developed, the land to its rear and either side is not. The way that the building faces out from this mature and undeveloped rural landscape points to its likely 1 [name]: 1097351 agricultural origins and is an important characteristic of its setting that contributes to its significance.

    The proposed unit would sit in an isolated position on the highway verge. It would not be close to any existing structure or landscape feature that could help to mitigate its visual impact. It would be sizeable. It would have the appearance of an isolated piece of industrial infrastructure that would be unrelated to anything around it and would appear entirely out of place with the undeveloped rural backdrop. The modest slope of the verge towards the field means that it would be sited slightly lower than the road, however the level difference is very small and not enough for this to reduce its visual impact.

    Other structures such as the broadband cabinet and substation are on the other side of the road. They are not prominent to view as they are tucked in amongst mature vegetation. In contrast, not only would the proposed structure be isolated and prominent, it would also appear oversized in the context of the modest extent of development nearby that it would be seen to serve.

    To the rear of the Inn there is a sizeable car park that includes various structures such as a storage container. This area is well related to the rear of the Inn and is not prominent to view from its front elevation, or in views from the north or south along the main road. Thus, the existence of this parking area and its associated structures has had limited impact on the rural setting of the Inn. It is a developed area that is unrelated to the appeal site and does not lessen the impact of the

  4. Section 05

    appeal proposal.

    Additional drawings submitted at appeal suggest a timber fenced enclosure as an alternative to the mesh originally proposed. The fence panels would be high at nearly 2.5 metres and would fail to lessen the structure’s bulky appearance.

    Landscaping is also suggested to mitigate the proposal’s impact. The submission refers to planting on the east and south elevations. It is not clear what form this could take or what would be possible given that the proposal would be erected on a highway verge. I cannot therefore be confident that a landscaping scheme would be sufficient to address the proposal’s impact.

    The proposal would have a considerable adverse impact on the character and appearance of the area for the reasons given. It would also significantly erode the undeveloped agricultural setting of the building and thus harm its significance.

    In terms of the National Planning Policy Framework (Framework) the harm to the significance of the listed building would be less than substantial. The extent of harm would be of a medium level as it would erode an important aspect of the listed building’s setting that contributes to its significance. The harm would be of considerable importance and weight. Paragraph 215 of the Framework establishes that any harm should be weighed against the public benefits of the proposal.

    The submissions set out that the structure would serve to import electricity from the local network when demand is low or when renewable output is high. It would also export to the local network when necessary, to allow for network flexibility and reliability. It would aid the transition to net zero by 2050. It is therefore met with support from a range of national policy documents. Framework paragraph 168 states that significant weight should be given to the benefits associated with all forms of renewable and low carbon energy, which applies to the appeal proposal on the basis that it is for an element of associated infrastructure. To support the transition to net zero, it is recognised that a significant amount of new infrastructure is needed.

    The appellant advises that it is difficult to find suitable sites. A site must be close to a substation and close to electricity demand and it is hard to find willing landlords as rental that can be offered is limited. Although the site may be appropriate from a technical perspective, its suitability is however highly questionable given my findings above. Furthermore, there is nothing before me to explain why the structure needs to be sited here or in this area, how it relates to infrastructure in the area, or what other sites have been discounted and why.

    Paragraph 212 of the Framework states that great weight should be given to the conservation of a heritage asset. The matters raised in the preceding paragraph lessen the weight that I should give to the benefits of the proposal, and as a result I find that they are not sufficient to outweigh the level of harm identified.

    In summary, the proposal would harm the character and appearance of the area and the significance of the listed building. In reaching this decision I have had regard to the requirements of the LBCA. The proposal would fail to accord with Policies S1, S2 and EN5 of the Teignbridge Local Plan 2013-2033 and Policies CC7, EN17, GP1, GP3 and DW2 of the Emerging Teignbridge Local Plan 2020-

    Together these seek to ensure that development proposals integrate with local character and avoid harm to heritage assets, including those proposals that are for energy storage.

  5. Section 06

    Conclusion

    The proposal is contrary to the development plan and there are no material considerations, including the provisions of the Framework, that outweigh this finding. Therefore, for the reasons given, the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 77No official casework-database value to compare
    Extracted decision date · page 1
    7 November 2025Matches the official casework database
    Extracted site visit dates
    29 October 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000457
Application reference
25/00815/FUL
Lead case reference
Not recorded
Planning authority
Teignbridge District Council
Planning authority code
E07000045

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
268 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
31 July 2025
Valid date
31 July 2025
Start date
20 August 2025
Planning authority decision date
7 July 2025
Appeal decision date
7 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
79307
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29