Appeal 6000482
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the change of use of land for storage purposes (Use Class B8) including new access and gates.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The Council has amended the description of development from that seen on the application form which did not include the new access and gates. I have therefore adopted the revised description of the development from the decision notice in the heading above.
The application form states that the development was undertaken in January 2024. I observed during my visit that the access, gates, timber building, and change of use have already primarily been undertaken, in accordance with the plans before me. I have therefore considered the appeal on the basis that the development has commenced.
Section 04
[name]
The main issues are: • whether the development is in a suitable location with respect to local planning policy; • the effect of the proposed development on the character and appearance of the area; and • whether the development is subject to the [name] requirements.
Section 05
Reasons
The appeal site is a triangular area of land that previously formed part of a larger agricultural field located at the junction of the A456 and [site address] . The site is severed from the adjoining agricultural land and ‘ [site address] ’ dwelling, by a fence. The site comprises a modest area of gravel adjacent to the new access and gate, a small timber building along with a utilised skip and used palettes of hard landscaping materials. At the time of my visit, not all the appeal site was being used for storage.
Section 06
Suitability of the location
Policy SP2 of the Wyre Forest District Local Plan 2016-2036 (2022) (LP) identifies both [address] and Rock as rural settlements. The appeal site is some distance outside of the Rock settlement boundary. The nearest settlement is [address], albeit that the site is also outside of its settlement boundary. The development is therefore considered to be within the open countryside.
Policy SP2 also sets out that development beyond settlement boundaries is strictly controlled and is limited to a few exceptions including employment development in rural areas and buildings for agriculture and forestry under Policy DM10 of the LP.
The use of the land for storage relates to the appellants business operations concerning the construction of garden rooms and falls within Use Class B8 of the Town and Country Planning (Use Classes Order) 1987 (as amended). The National Planning Policy Framework (the Framework) recognises in paragraph 89 that sites meeting local business needs in rural areas may have to be found adjacent to or beyond existing settlements.
However, no evidence is before me that identifies why the storage activity must be located at the other end of the field to the appellant’s residential curtilage. The evidence also does not demonstrate that the storage use relates to or supports rural employment for agricultural purposes, rural regeneration of existing employment sites, farm diversification, or the redevelopment of previously developed land. Consequently, the development does not meet the exceptions site criteria under LP Policy SP2 and is not supported under LP Policy DM10.
For the above reasons, the proposal is not located in an appropriate location with respect to the Council’s spatial planning policy. Accordingly, the development conflicts with Policies SP2 and DM10 of the LP, the requirements of which have been outlined above.
Section 07
Character and appearance
The appeal site forms part of a wider area of agricultural land located on either side of [site address] . The land provides a visual and spatial gap between the A456, and the small cluster of rural dwellings located on [site address] . Due to the agricultural and open nature of the land, the rural nature of the surroundings and its visual and spatial roles, the site makes an important contribution to the character and appearance of the area.
LP Policy SP22 identifies the requirement for new development to protect and where possible enhance the unique character of the landscape, referring to the Worcestershire County Council Landscape Character Assessment (LCA).
The site is located within the ‘Forest and Smallholdings and Dwellings’ character area. The area is identified as densely settled and is characterised by strings of wayside cottages and associated smallholdings which are nestled within a matrix of pastoral fields and narrow interlocking lanes, defined by dense hedges and hedgerow trees. The description goes on to identify that human activity has resulted in a unified, palpably domestic character. However, the appeal site, adjacent farmland and small cluster of dwellings do not exhibit the densely settled characteristics of the character area as the surroundings are rural and agrarian.
Due to the minimal storage that is currently taking place on site and the existing hedge along the road boundaries, the use, at present, has a limited adverse effect on the erosion of the visual and spatial gap. The topography of the A456 and the appeal site, restrict public views of the site when passing and no residential properties directly overlook the site. However, the site is visible from dwellings on the opposite side of [site address] and the storage, gravel area, shed and skip already on the site can be seen from the new access gate on [site address] .
The site’s use as storage, and the timber shed fail to exhibit high-quality design that would enable these elements to integrate with its surroundings or reinforce local distinctiveness sought by [name] SP20 and DM24. The storage would therefore be incongruous with the pastoral fields of the area, in conflict with the aim of new development to strengthen and enhance its landscape character. The lack of intrinsic habitat value or absence of protected species on site is noted but this is a neutral factor in the planning balance.
The appeal site is larger than the current area being used for storage and is severed entirely from the appellants residential accommodation. Given the site can be accessed independently and is larger than is currently utilised, a planning permission for storage on the site would provide the ability for a significant intensification of the activity to that currently observed.
The Framework identifies that consideration should be given to whether otherwise unacceptable development could be made acceptable through the use of conditions. Conditions could be imposed to overcome possible visual effects of the storage use, including the height of any materials stored and the type of material stored to be inert only. However, their imposition would not materially ameliorate the identified harm to the character and appearance of the site. Furthermore, whilst offered by the appellant, a condition restricting the proposal to the appellant’s personal use only, would not address the harm to the character of the area and it is rarely appropriate to restrict development for personal use.
Accordingly, for the above reasons, the development conflicts with [name] SP20, SP22 and DM24, the requirements of which have been outlined above.
Section 08
[name]
[name] (BNG) is required under a statutory framework introduced by Schedule 7A of the Town and Country Planning Act 1990 (as inserted by Schedule 14 of the Environment Act 2021). Under the statutory framework for BNG, subject to some exceptions, every grant of planning permission is deemed to have been granted subject to the condition that the biodiversity gain objective is met. One of the exemptions from BNG is where the development is retrospective. The Council’s Officer Report acknowledges that the development has already taken place and that the application is the result of an enforcement complaint.
Despite this, the Council refused planning permission on the basis that the required 10% BNG would not be met and that the proposal was not exempt. The Council confirmed in an email on 22 May 2025 that it had incorrectly refused planning permission due to the BNG exemption. It has however continued to pursue the second reason for refusal on the basis that the change of use undertaken extends beyond the red line boundary. Whilst on site, I observed that the use was already occurring however this was of a limited nature when compared to the red line site boundary. As such, from my observations the change of use had not extended beyond the red line boundary established within the application.
Notwithstanding the issue of BNG, the Council’s evidence goes on to conclude that the proposed ecological enhancements, which appear to have not yet been delivered on site, would deliver measurable net gains in biodiversity and therefore accords with Policy SP23 of the LP.
Given the above, the submitted plans and my site observations, I am satisfied that the development has commenced and due to the retrospective nature of the proposal it is therefore exempt from the BNG requirements. As such, reason for refusal 2 has been met.
Section 09
Other Matters
Both parties have drawn my attention to an enforcement notice related to the use of the appeal site. However, this has had no material bearing on my consideration of the proposal which has been assessed on its own merits based on the specific evidence before me.
Section 10
Conclusion
Notwithstanding my conclusions in respect of BNG, the proposal would conflict with the development plan and the Framework with regards to the suitability of the location as well as character and appearance. The proposal would therefore conflict with the development plan when read as a whole in respect of spatial planning policy as well as design, local distinctiveness, and landscape quality. There are no material considerations that indicate the appeal should be determined other than in accordance with the development plan.
For the reasons given above the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4715No official casework-database value to compare
- Extracted decision date · page 1
- 6 March 2026Matches the official casework database
- Extracted site visit dates
- 3 February 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6000482
- Application reference
- 25/0018/FUL
- Lead case reference
- Not recorded
- Planning authority
- Wyre Forest District Council
- Planning authority code
- E07000239
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Change of use
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 700 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 6 August 2025
- Valid date
- 7 August 2025
- Start date
- 14 August 2025
- Planning authority decision date
- 21 May 2025
- Appeal decision date
- 6 March 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 85498
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29