Skip to main content
Official casework recordDismissedCurrent release

Appeal 6000540

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘A new floor will be added to the existing house at [site address] , as part of the planned development. The extension was carefully planned to fit in with the rest of the neighbourhood's style while having as little of an effect as possible on nearby homes.’

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    Class AA of Part 1 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO) defines as permitted development the enlargement of a dwellinghouse by construction of additional storeys, subject to limitations and conditions. There is no dispute that the proposal would accord with the stipulations as set out under sections AA.1 and AA.2(2) of Class AA.

    Section AA.2(3)(a) states the requirement for a developer to apply to the local planning authority for prior approval as to the considerations given in parts (i)-(iv) before beginning development. There is no requirement to determine such applications in accordance with the development plan, although in light of sub-paragraph AA.3(12)(b) I have had regard to the National Planning Policy Framework (the Framework) insofar as it is relevant to the subject matter of the prior approval.

  3. Section 04

    [name]

    Based on the above, the main issues in this appeal are whether prior approval should be granted having regard to the proposed development’s effect on the external appearance of the dwellinghouse and on the amenity of any adjoining premises.

  4. Section 05

    Appearance of the Dwellinghouse

    The appeal site includes a detached ‘chalet’ style two-storey dwelling. [address] is formed of a diverse range of buildings of varying architectural styles, facing materials and scales. Most present as two or three storeys with a consistent front building line and regular gaps between buildings which add some rhythm to the street scene. The proposal seeks to add an additional storey to the host dwelling resulting in an increase in height of around 2.3m.

    The extension would reflect the host building in terms of using matching brick and tiles while also continuing the roof pitch and general arrangement of windows to the principal elevation. The extension would raise the overall height of the building, although in adding an additional storey this is somewhat inevitable. The increase in height is minimal at 2.3m and from my observations on the site visit, the height would resemble most other properties on the same street. While it may protrude above the extension of No.13, it would not appear dominant or uncharacteristic against the main building of that adjoining premises due to the design and scale of the extension.

    Overall, the proposal would not have a harmful impact on the principal elevation of the dwellinghouse or the street scene in accordance with section AA.2(3)(a)(ii) of Schedule 2, Part 1, Class AA of the GPDO. It would also accord with paragraph 135 of the Framework which advises development proposals should be sympathetic to local character and history, including the surrounding built environment.

  5. Section 06

    Amenity

    The appeal site adjoins the premises of No.9 to the southwest, which is a three-storey building evidently comprised of flats. I observed on the site visit that several windows on the side elevation of that building directly face the side of the host dwelling. The extra mass at first floor level of the host building, which would involve straightening the existing lean-to style side section of the host property, and additional storey at second floor level would be visible from these side windows of No.9.

    The smaller windows appeared to be obscured from my vantage point and may serve bathrooms. However, the larger windows were not, and it is unclear as to what rooms they serve. As such, due to the lack of information on this matter I share the concern of the Council that the additional mass of the proposal could harmfully reduce the outlook from the side windows of No.9 for occupiers of these properties, harming the amenity of the adjoining premises as a result.

    I have considered the design approach taken by the appellant with regards to obscure glazing to the rear windows to ensure no loss of privacy to adjacent residents. However, this was not a reason for refusal and would not resolve the concerns relating to a loss of outlook.

    There is further concern regarding loss of light to occupiers of No.9. However, due to the relative positions of both properties, with No.9 to the southwest of the appeal site, and the minimal height increase of the proposal, any loss of light would be unlikely.

    To conclude, the proposal would harm the amenity of occupiers of the adjoining premises of No.9 due to potential overbearing impact and loss of outlook caused by the additional storey extension. This would conflict with section AA.2(3)(a)(i) of Schedule 2, Part 1, Class AA of the GPDO as well as paragraph 135 of the Framework which advises that proposals should ensure a high standard of amenity for existing and future users.

  6. Section 07

    Conclusion

    For the reasons given, the proposal fails to comply with paragraph AA.2(3)(a)(i) of Schedule 2, Part 1, Class AA of the GPDO. As such prior approval cannot be granted for development and the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 550No official casework-database value to compare
    Extracted decision date · page 1
    20 January 2026Matches the official casework database
    Extracted site visit dates
    8 January 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000540
Application reference
25/01121/ASDWEL
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Prior Approval
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
97 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
18 August 2025
Valid date
18 August 2025
Start date
22 August 2025
Planning authority decision date
11 June 2025
Appeal decision date
20 January 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
83008
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21