Skip to main content
Official casework recordDismissedCurrent release

Appeal 6000593

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘Demolition of existing detached garage and erection of a new 2-bedroom single storey dwellinghouse with accommodation in the roofspace to adjoin no. [site address] with the inclusion of a hip-end roof extension to the existing dwelling at no. [site address] , along with associated external works including car parking, refuse and cycle storage and landscaping for the new dwelling.’

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are the effect of the proposed development: • on the character and appearance of the area; and • on the living conditions of the neighbouring occupiers to the east, with regard to outlook and the provision of natural light.

  3. Section 04

    Character and appearance

    The appeal site relates to a single storey semi-detached dwelling on [address]. The pair of semi-detached properties are situated on a bend in the road and occupy a Z-shaped footprint. Both properties are set back from the highway and have lawned frontages which are bounded by low brick walls. This layout is replicated on another bend in the road, and at the two junctions where [address] meets [address]. The layout creates a sense of symmetry and contributes to a sense of spaciousness in the area, particularly at the corner junctions and bends in the road.

    The proposed development would result in the demolition of an existing garage and the creation of an additional single storey dwelling (with accommodation in the roof), attached onto the host property. The additional dwelling would be of considerable width, infilling most of the space between the side elevation of the host property and the side boundary of the site. The introduction of the additional dwelling would harm the sense of symmetry and character of the existing semi-detached pair.

    Additionally, the reduced gap between the proposed property and the side boundary of the site would reduce the sense of spaciousness at the site, resulting in a cramped appearance. The proposed development would also substantially reduce the width of the plot and the size of the rear garden of the host property. The resultant plot would not be reflective of surrounding development on the corner plots, which typically occupy spacious sites.

    The scheme would also result in additional hardstanding to the front of the host property to accommodate parking spaces. Whilst this may be acceptable in isolation and could potentially be achieved under permitted development rights, coupled with the additional dwelling it would further emphasise the increased built form on the site.

    I acknowledge that some surrounding plots are narrower than the existing plots at 27 and [address] and often have reduced gaps between the side elevation of properties and the site boundaries. There is also some variation in the design of surrounding development, including both detached and semi- detached dwellings. However, these properties are not read within the same context as corner plots in the area. As outlined, the corner plots have a largely replicated layout that differs from the other properties along [address] and [address]. In any case, the resultant plot at the host property would be narrower than the majority of surrounding plots within the area.

    I acknowledge that some of the properties situated on the bend in the road and at the corner junctions benefit from extensions, which may somewhat disrupt the sense of symmetry. However, their scale and form is not so substantial to result in the pair of dwellings losing their original form. Additionally, an extension is not directly comparable to an independent property sat within its own plot.

    The host property benefits from a lawful development certificate for a hip to gable roof extension (Ref: 24/04043/PLUD). This is however of a substantially smaller scale than the proposed development and largely maintains the gap between the side of the dwelling and the side boundary. It is therefore not directly comparable to the proposed development. The appellant also suggests that a similar sized extension would likely be approved and further options for a side extension could be possible under permitted development. I however have limited information regarding this before me. In any case, an extension is again not directly comparable to an independent property sat within its own plot. I have afforded this consideration limited weight in favour of the appeal.

    I do not agree that the proposed development would be largely screened from view by adjacent houses and their gardens. It would front onto the highway and would be readily visible from the street scene directly in front of it. Whilst some design features and the proposed materials would reflect surrounding development, this would not overcome the harm outlined above in relation to the character of the existing pair of properties, the reduced sense of spaciousness and the reduced plot size at the host property. I am also not satisfied that a planning condition to ensure additional landscaping could overcome this harm. Whilst planning policy broadly promotes an efficient use of land, it also seeks to ensure that development positively contributes to the character and appearance of an area.

    Overall, for the reasons outlined above, the scheme would substantially harm the character and appearance of the surrounding area. It would therefore fail to accord with Policies 6 and 37 of the London Borough of Bromley Local Plan (2019) (BLP) and Policy D3 of The London Plan (2021) (LP). Collectively, amongst other matters, these policies seek to ensure high quality design that positively contributes to the character and appearance of the area.

  4. Section 05

    Living conditions of neighbouring occupiers

    The Council has specifically drawn my attention to the effect of the proposed development on the occupiers of [address] (No.29) and [address] (No.34). I have considered the effect on these properties below.

  5. Section 06

    Outlook

    The front building line of the proposed dwelling would sit broadly in line with the side boundary of No. 29 (between No.29 and No.34). Given this, the rear garden area and rear windows of No.29 would face the parking area of the proposed dwelling. Whilst the proposed dwelling would be visible from the garden area and rear windows, the outlook would not be dominated or materially harmed by it.

    The proposed dwelling would however sit adjacent to the rear boundary of No. 34. As a result of the reduced separation distance between the boundary and the proposed dwelling, coupled with its height and bulk, the dwelling would dominate the outlook from the garden area of No.34. This would affect the occupier’s enjoyment of their outdoor amenity space, harming their living conditions. The proposed dwelling would also dominate the outlook from the rear windows of No.34, however the evidence before me does not indicate what these windows serve. I am therefore unable to conclude if the effect on the outlook from these windows would result in material harm to the living conditions of occupiers.

  6. Section 07

    Provision of natural light

    Given the separation distances and the positioning of the proposed dwelling, which does not completely surround either No. 29 and No.34, it would not result in material harm to the provision of daylight at No.29 and No.34.

    Regarding sunlight, any loss of sunlight to the rear garden and rear windows of No.34 would be limited to the later afternoon/evening time. Given the orientation of the site and the path of the sun, it would be largely unaffected throughout the morning and part of the afternoon time. Furthermore, the roof slope facing No.34 would further reduce any impact. Given this, any loss of sunlight would be minimal and would not result in material harm to the living conditions of occupiers of No. 34.

    Any loss of sunlight to No.29 would also be limited to the later afternoon/evening time and would be further reduced by the positioning of the proposed dwelling to the north of the side boundary of No.29. Overall, I do not consider than any loss of sunlight to No.29 would result in material harm to the living conditions of the occupiers.

    To conclude on the main issue, the scheme would not result in unacceptable harm to the living conditions of neighbouring occupiers at No.29 and No.[address] of the provision of natural light. It would also not result in unacceptable harm to the outlook of neighbouring residents at No.29. It would however result in a loss of outlook from the rear garden of No.34, resulting in unacceptable harm to the living conditions of occupiers. Therefore, as a whole, the scheme would be contrary to Policy 37 of the BLP and Policy D3 of the LP. Collectively, amongst other things, these policies seek to ensure the amenity of neighbouring occupiers.

  7. Section 08

    Other Matters

    The site is not located within a conservation area, and the property is not a listed building. The proposed dwelling may meet the London space standards and not result in any overlooking to neighbouring properties. These matters are however neutral considerations and would not weigh in favour of, nor against the appeal.

  8. Section 09

    Planning Balance

    The appellant outlines how the Council has a five-year housing land supply of 2.96 years. The Council outline in its appeal statement how an appeal decision from October 2024 concluded that it had a supply of 2.4 years. For the purposes of this appeal, I have therefore used the lower figure of 2.4 years as a worst-case scenario. This is a significant shortfall that would potentially affect young people trying to buy properties, employment and social mobility. In these circumstances paragraph 11d) of the Framework is engaged.

    There is some dispute between the main parties regarding the number of housing completions in the Council area. The appellant alleges that in 2023/2024 168 houses were completed in Bromley, whereas the Council alleges that there were 33,801 completions in the same year. The appellant also outlines how in 2020/2021 17% of units were on larger sites and according to the Council’s July 2024 Housing delivery action plan, delivery rates are 52%. Nonetheless, it is clear that the Council cannot demonstrate a five-year housing land supply. I have proceeded on this basis.

    There is nothing before me to suggest that there are any policies in the Framework that protect areas or assets of particular importance that provide a strong reason for refusing the development under paragraph 11d)(i). Therefore, the balance in paragraph 11d(ii) applies such that planning permission should be granted unless any adverse impacts of doing so would significantly and demonstrably outweigh the benefits when assessed against the policies in the Framework taken as a whole.

    There is dispute between the main parties as to whether the site is a brownfield site. It is not within my remit to formally determine any lawful use of land. Nonetheless, for the purposes of considering the public benefits of the scheme, I have treated the scheme as making use of brownfield land.

    The scheme would make a small but important contribution to the housing land supply, providing a dwelling on a small site, in an accessible location close to schools, open spaces and shops. The dwelling may be suitable as a starter home or for those wishing to downsize. The appellant also suggests that it would be delivered quickly. It would comply with Part M4(2) building regulations and ensure some social and economic benefits throughout its construction and lifetime, however given the scale of the development, these would be relatively limited. It would also incorporate some landscaping which would likely contribute to ecology and biodiversity.

    Overall, the small scale of the development means that I afford the provision of new housing, along with the other benefits listed above, moderate weight in favour of the proposed development.

    Accordingly, I find that the adverse impacts arising from the development in terms its effect on the character and appearance of the area, and the living conditions of the neighbouring occupiers at No. 34 with regard to outlook significantly and demonstrably outweigh the moderate weight attributed to the benefits when assessed against the policies in the Framework taken as a whole. The presumption in favour of sustainable development does not apply in these circumstances.

    Whilst planning decisions should give substantial weight to the value of using suitable brownfield land within settlements for homes, I consider that substantial harm would be caused, for the reasons set out above.

  9. Section 10

    Conclusion

    The proposal would conflict with the development plan as a whole and there are no other considerations, including the provisions of the Framework, which outweigh this finding. Therefore, for the reasons given above, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4471No official casework-database value to compare
    Extracted decision date · page 1
    20 November 2025Matches the official casework database
    Extracted site visit dates
    12 November 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000593
Application reference
25/01462/FULL1
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
558 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
27 August 2025
Valid date
27 August 2025
Start date
1 September 2025
Planning authority decision date
25 July 2025
Appeal decision date
20 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
80088
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29