Skip to main content
Official casework recordAllowedCurrent release

Appeal 6000655

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

No verified development description has been extracted from an official decision PDF yet.

  1. Section 02

    Decision

    The appeal is allowed and prior approval is granted under the provisions of Article 3(1) and Schedule 2, Part 3, Class A, [name].4 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for erection of single-storey rear extension with a depth of 6.00 metres, highest point of 3.00 metres and height at the eaves of 3.00 metres at [site address] , Havering [postcode] in accordance with the terms of the application Ref Y0205.25, dated 21 July 2025, and the details submitted with it including plan nos. ZAAVIA/14EA/101 Issue A, ZAAVIA/14EA/103 Issue A and ZAAVIA/14EA/105 Issue A, pursuant to Article 3(1) and Schedule 2, Part 1, Class A, paragraph A.4(2), and subject to the following additional condition:

    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification), no window or other opening shall be formed in the flank wall of the rear extension hereby permitted facing No [address].

  2. Section 03

    Preliminary Matters

    My above decision refers to the application form description rather than that in the decision notice, as that is what the appellant applied for. It accurately describes the proposal and is also not substantively different to the decision notice description.

    Under Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended (“the GPDO”), planning permission is granted for the enlargement of a dwellinghouse subject to limitations and conditions. Where an application is made for a determination as to whether prior approval is required for development which exceeds the limits in paragraph A.1(f) but is allowed by paragraph A.1(g) to Part 1, paragraph A.4(3) provides that the local planning authority may refuse the application where it considers that the proposed development does not comply with the conditions, limitations or restrictions applicable to such permitted development.

    Following the submission of this appeal, the Council consulted adjoining occupiers to the appeal site (No 14) by written notice, and has provided a copy of such written notice. Based on this, I am satisfied that the consultation requirements set out under paragraph A.4(5) have been substantively met. No neighbouring representations have been received in response to this consultation.

  3. Section 04

    Main Issue

    Given the above, the main issue is whether the proposed development would be granted planning permission by Article 3, Schedule 2, Part 1, Class A of the GPDO.

  4. Section 05

    Reasons

    The Council specifically refused prior approval because it deemed the proposed development to not comply with limitation A.1(j)(iii) under Schedule 2, Part 1, Class A of the GPDO. This sets out that development is not permitted under Class A if the enlarged part of the dwellinghouse would extend beyond a wall forming a side elevation of the original dwellinghouse and would have a width greater than half the width of the original dwellinghouse. In relation to a building, the GPDO defines “original” as, amongst other things, a building existing on 1st July 1948, as existing on that date; or if built on or after 1st July 1948, as so built.

    No 14 comprises a two-storey end-terraced dwelling facing [address]. It contains a continuous rear elevation wall of pebbledash. An area of pebbledash appears to be of different texture than that on the rest of this rear elevation. However, there is no substantive evidence before me that the original rear elevation of No 14, as defined above, is not what currently exists. Even if there was a previous protrusion beyond the existing rear wall and forming part of the original dwellinghouse, its extent and composition is not borne out in the evidence before me.

    Therefore, based on the submitted evidence and my site visit observations, as a matter of fact and degree I conclude that the proposed extension would not project beyond a wall forming a side elevation of the original dwellinghouse.

  5. Section 06

    Conditions

    Any planning permission granted under Article 3(1) and Schedule 2, Part 1, Class A is subject to the conditions in section A.3. In addition, my formal decision above includes reference to the approved plans. I consider it necessary to impose a further condition (No 1) to restrict the formation of windows on the side wall of the approved extension facing the adjoining No 16, in the interests of living conditions. The Council also suggested a condition preventing the extended roof being used as a balcony or similar amenity area. However, as this would require additional planning permission from the Council in any event, this is unnecessary.

  6. Section 07

    Conclusion

    For the above reasons, the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4438No official casework-database value to compare
    Extracted decision date · page 1
    22 December 2025Matches the official casework database
    Extracted site visit dates
    9 December 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000655
Application reference
Y0205.25
Lead case reference
Not recorded
Planning authority
London Borough of Havering
Planning authority code
E09000016

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
26 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
5 September 2025
Valid date
5 September 2025
Start date
17 September 2025
Planning authority decision date
1 August 2025
Appeal decision date
22 December 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
82075
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21