Skip to main content
Official casework recordAllowedCurrent release

Appeal 6000676

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

up to 6 dwellings (minimum 5 maximum 6).

  1. Section 02

    Decision

    The appeal is allowed and permission in principle is granted for up to 6 dwellings (minimum 5 maximum 6) at [site address] in accordance with the terms of the application, Ref PA25/04117, and the plans submitted with it.

  2. Section 03

    Preliminary Matters

    The proposal is for permission in principle. The Planning Practice Guidance (the PPG) advises that this is an alternative way of obtaining planning permission for housing-led development. The permission in principle consent route has two stages: the first stage (or permission in principle stage) establishes whether a site is suitable in-principle, and the second (technical details consent stage), is when the detailed development proposals are assessed. This appeal relates to the first of these two stages.

    The scope of the considerations for permission in principle is limited to location, land use and the amount of development permitted1. All other matters are considered as part of a subsequent technical details consent application if permission in principle is granted. I have determined the appeal accordingly.

    An applicant can apply for permission in principle for a range of dwellings by expressing a minimum and maximum number of dwellings as part of the application. In this instance, permission has been sought for a minimum of five and a maximum of six dwellings.

  3. Section 04

    Main Issue

    The main issue is whether the site is suitable for five or six dwellings, having regard to its location, the proposed land use, and the amount of development.

  4. Section 05

    Reasons

    Policy 2 of the Cornwall Local Plan Strategic Policies 2010 – 2030 (adopted 2016) (the Local Plan) sets out the spatial strategy for development. It seeks to maintain 1 The PPG Paragraph: 012 [name]: 58-[phone] the dispersed development pattern of Cornwall, providing homes and jobs based on the role and function of each place. Based on this strategy, Policy 3 defines how development will be accommodated, with growth focussed on identified main towns. However, it also supports housing growth within or adjoining smaller settlements through rounding off; development of previously developed land (PDL); infill; or rural exception sites. It is not contested that Longdowns is a settlement. Although the Mabe Neighbourhood Development Plan 2022 -2030 (the Neighbourhood Plan) does not designate a settlement boundary for Longdowns, Policy 1 supports residential development outside the settlement boundary of [name] where it accords with Policy 3 or 7 of the Local Plan.

    The major part of Longdowns lies to the north of the A394, but the filling station and the houses around the junction with [address] also form part of the settlement. The appeal site, however, lies beyond the western extent of the dwellings on either side of [address], and borders open countryside to the north and south. Whilst there is a scatter of buildings further to the west, these do not border the appeal site and are clearly detached from the village. The site is not, therefore, within the settlement. It is, though, adjacent to the existing built-up area, and outline planning permission2 was granted in February 2024 for six dwellings, at least three of which would be affordable, as a Rural Exception Site.

    The appeal scheme is not promoted as a Rural Exception Site, and it is accepted by the appellant that the proposal does not constitute infill or rounding off as defined by the Local Plan. Furthermore, it is not contended that the site comprises PDL. Consequently, the proposal is not supported by Policy 3 of the Local Plan or, therefore, Policy 14 of the Neighbourhood Plan.

    Paragraph 2.33 of the Local Plan says that land outside the physical boundaries of existing settlements is defined as open countryside. In the absence of support from Policy 3, Policy 7 says that the development of new homes in the open countryside will only be permitted where there are special circumstances, none of which apply in this case. Consequently, the location for the proposal would conflict with the spatial strategy set out in Policies 2, 3 and 7 of the Local Plan, and Policy 14 of the Neighbourhood Plan.

    The site is a scrubby piece of land, largely enclosed by an overgrown roadside boundary wall, and by tall conifers to the south and west. It is, therefore, visually divided from the surrounding open countryside. Its eastern boundary abuts the settlement edge, and is more open. On this side, the gable end of the garage, and various outbuildings, at 3 [name] are readily visible close to the site. It is, therefore, strongly influenced by built development, and in combination with its enclosed nature, this means the site does not make a significant contribution to the wider landscape setting of the village.

    Nevertheless, there is currently a distinct built edge to the village marked by the western boundaries of 3 [name] on one side of the road and [address] on the other. Beyond these buildings the character of the area abruptly turns to a narrow countryside lane, with vegetation on both sides. The buildings further to the west are hidden by the curve of the road, so the landscape is almost entirely rural. The provision of five or six dwellings on the site, with the inevitable breach of the roadside boundary for access, would, therefore be a visually 2 Local planning authority reference: PA23/06137 intrusive extension of built development into the countryside, which would be harmful to its character. This harm to the wider countryside setting of the village would be limited, due to the enclosed nature of the site and the existing urban influence on its eastern side. However, this limited harm would place the proposal in conflict with Policies 12 and 23 of the Local Plan, and Policy C1 of the Climate Emergency Development Plan Document (February 2023) (the DPD), which seek to maintain and enhance Cornwall’s distinctive natural environment.

  5. Section 06

    Planning Balance

    The proposal would conflict with the spatial strategy of the development plan and with its policies that seek to protect the natural environment. There are no policies that positively support development of the appeal site, so the proposal would conflict with the development plan as a whole. However, it is not disputed that the Council cannot currently demonstrate a five-year supply of deliverable housing sites. In these circumstances, the approach to decision-making set out at Paragraph 11d) of the Framework applies.

    Paragraph 232 of the Framework says that due weight should be given to existing development plan policies according to their degree of consistency with the Framework. The spatial strategy set out in Policies 2, 3, and 7 of the Local Plan is consistent with the Framework’s aims to direct development to locations where there is a genuine choice of transport modes, and to maintain the vitality of rural communities. However, it is not delivering a sufficient supply of homes in accordance with the other aims of the Framework. Consequently, I can only afford moderate weight to the conflict with the development plan policies that govern the spatial location of housing.

    Policies 12 and 23 of the Local Plan, and Policy C1 of the DPD are generally consistent with the Framework’s aims to conserve and enhance the natural environment. The proposal would result in limited harm to the rural setting of Longdowns. I am mindful, however, that meeting the shortfall in housing provision is unlikely to be achieved without some visual impacts. In this case, the site does not lie within a protected landscape, and I am also mindful that outline planning permission already exists for residential development on the site. Consequently, I give limited weight to the conflict with Policies 12, 23 and C1.

    Set against the harm that I have identified, there would be benefits associated with the development. It would support the Framework’s objective of significantly boosting the supply of homes as set out at paragraph 61. I recognise that the inclusion of at least three affordable dwellings is likely to have been a significant factor in favour of the existing outline permission, and that the appeal scheme does not include such provision. Nevertheless, in view of the current shortfall in housing land supply, the benefit of an additional five or six houses still carries significant weight. In apportioning this weight, I note that the Council’s Interim Policy Position Statement (April 2025) advises that many sites which would formerly only have been accepted as [name] will now be dealt with under general housing policies.

    There would also be economic benefits associated with the development, through the creation of jobs during the construction phase. Thereafter, residents would contribute to the local economy through ongoing spending and support for local services. The limited scale of the development means that these benefits carry modest weight.

    Overall, when assessed against the policies in the Framework, taken as a whole, the adverse impacts of the proposal do not significantly and demonstrably outweigh the benefits. Therefore, despite the conflict with the development plan, material considerations indicate that permission in principle should be granted.

  6. Section 07

    Conditions

    The PPG makes it clear that it is not possible for conditions to be attached to a grant of permission in principle, whose terms may only include the site location, the type and amount of development.

  7. Section 08

    Conclusion

    For the reasons given above, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 377No official casework-database value to compare
    Extracted decision date · page 1
    15 January 2026Matches the official casework database
    Extracted site visit dates
    2 December 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000676
Application reference
PA25/04117
Lead case reference
Not recorded
Planning authority
Cornwall Council
Planning authority code
E06000052

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Outline
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
2,100 m²
Number of residences
6
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
9 September 2025
Valid date
9 September 2025
Start date
18 September 2025
Planning authority decision date
28 July 2025
Appeal decision date
15 January 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
82805
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29