Appeal 6000725
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
for a loft conversion including side and rear dormers.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The proposal is for a loft conversion including a side and rear dormer. The site already has extant permission for a rear dormer and front rooflights (reference APP/24/01216/F). The only element of the appeal proposal in dispute is the proposed side dormer. As did the Council, I find no harm arising from the other proposed works.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the area, with particular regard to the preservation or enhancement of the Ashley Cross Conservation Area (CA).
Section 05
Reasons
The appeal site is located within [name], and fronts [address], which is predominantly residential. I therefore have a statutory duty under section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990 to pay special attention to the desirability of preserving or enhancing its character or appearance. The Framework Section 16 also requires that great weight should be given to the conservation of designated heritage assets.
The Ashley Cross Conservation Area [name] and Management Plan (2012) (CACAMP) characterises the buildings south of the railway embankment as dating from the Victorian era comprising short terraces, detached or semi-detached dwellings. The CACAMP identifies that the area has cohesive qualities, from which it derives its significance. The appeal site is the [site address] of No. [site address] , a red brick semi-detached building with a hipped roof and a gable above the bay window. Its largely unaltered appearance contributes positively to the significance of the area.
The proposal would alter the existing roof through the addition of a side and rear dormer. The side dormer would be particularly visible from within the street scene and would give the appearance of a top-heavy building, eroding its existing balanced appearance. As such, the proposal would result in the introduction of a prominent and discordant feature onto the roof which would be at odds with the otherwise cohesive street scene.
Given that the proposed development would introduce a bulky feature, and that the significance of the CA is derived from its cohesive qualities, the proposal would not preserve or enhance the character or appearance of the CA. The proposal would thus cause less than substantial harm to the significance of the CA as a designated heritage asset, within the upper range of that spectrum of harm to which the Framework paragraph 212 requires that I give great weight.
The Framework paragraph 215 requires less than substantial harm to the significance of the CA to be weighed against the public benefits of the proposal. No public benefits have been put before me. Accordingly, there are no public benefits which would outweigh the great weight to which I give the less than substantial harm to the CA when applying the Framework paragraph 215. The proposal would therefore fail to preserve or enhance the [name]. In this regard it would conflict with Policies PP27 and PP30 of the Poole Local Plan (2018), which seek to ensure that development preserves or enhances Poole’s heritage assets, and respects the surrounding area and adjoining buildings.
Section 06
Conclusion
The proposed development would therefore conflict with the development plan as a whole. With no other material considerations outweighing this conflict, for the reasons given above I conclude that the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4518No official casework-database value to compare
- Extracted decision date · page 1
- 31 December 2025Matches the official casework database
- Extracted site visit dates
- 26 November 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6000725
- Application reference
- P/25/01636/FUL
- Lead case reference
- Not recorded
- Planning authority
- Bournemouth, Christchurch and Poole
- Planning authority code
- E06000058
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 172 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 15 September 2025
- Valid date
- 30 September 2025
- Start date
- 30 September 2025
- Planning authority decision date
- 21 August 2025
- Appeal decision date
- 31 December 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 82258
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29