Appeal 6000750
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
permission in principle for one dwelling.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The proposal is for permission in principle. The Planning Practice Guidance (PPG) advises that this is an alternative way of obtaining planning permission for housing-led development. The permission in principle consent route has 2 stages: the first stage (permission in principle stage) establishes whether a site is suitable in principle and the second stage (‘technical details consent’) is when the detailed development proposals are assessed. This appeal relates to the first of these 2 stages.
The scope of the considerations for permission in principle is limited to location, land use and the amount of development permitted, as set out in the PPG. All other matters are considered as part of a subsequent [name] application if permission in principle is granted. I have determined the appeal accordingly and considered the illustrative site plan and section plan as indicative only.
Section 04
[name]
The main issues are whether the site is suitable for residential development, having regard to its location, land use, and the amount of development, with particular regard to: • the effect on the River Wye Special Area of Conservation (SAC) and, • the character and appearance of the surrounding area.
Section 05
[name]
Article 5B(1) of the Town and Country (Permission in Principle) Order 2017 (as amended) provides that permission in principle cannot be given for habitats development. This is defined in Article 5B(5) of the Order as development which is likely to have a significant effect on a European site1 either alone or in combination with other plans and projects and is not directly connected with or necessary for the management of the site. If a proposed permission in principle development is likely to have a significant effect on a qualifying European site without any mitigating measures in place, an Appropriate Assessment (AA) must be undertaken by the competent authority to establish whether the development would adversely affect the integrity of the protected site.
Even if the appeal site is over 20km from the [name], it is within the catchment area for the [name], which is part of the [name]. The SAC is identified under the Habitats Regulations as being of international importance for its aquatic flora and fauna. There are a number of qualifying species in the SAC, which include white clawed crayfish, sea lamprey, brook lamprey, river lamprey, alis shad, twaite shad, Atlantic salmon, bullhead and otter. Additionally, qualifying habitats of the SAC include transition mires and quaking bogs and water course of plain to montane levels with Ranunculion fluitantis and Callitricho-Batrachion vegetation (rivers with floating vegetation often dominated by water-crowfoot).
The present condition status of the [name] is unfavourable-declining, with the [name] component of [name] catchment in an unfavourable condition due to phosphates. In such areas any additional development that would result in a net increase in population served by a wastewater system, would require suitable mitigation measures to avoid further nutrient pollution. Consequently, the proposed dwelling would have likely significant effects on the integrity of the [name] due to nutrient pollution. Therefore, I must undertake an AA in accordance with Regulation 63 of the Habitats Regulations.
To mitigate the effects of the proposed development on the SAC, the appellant proposes either a [name] package treatment plant to treat water discharge before discharging to the [name] sewer, or a suitable package treatment plant to retain all water discharge on-site that would meet relevant compliant standards. Additionally, aligned with the approach accepted by the Council when planning permission was granted for the 2 dwellings on the wider site (Council ref 214123), if deemed necessary, the appellant would purchase phosphate credits from the Council towards the [name] scheme.
While the 2 dwellings were granted planning permission subject to conditions, including to restrict the occupation of the dwellings until the Tarrington integrated wetland scheme could provide effective mitigation for the effects of that development on the [name], the PPG sets out that it is not possible to impose conditions on a permission in principle. Therefore, I have considered the appeal proposal based on its own merits.
The evidence provided does not include substantive drainage design details to demonstrate that the proposed development would not cause nutrient pollution, harmful to the integrity of the SAC. Also, I have no substantive evidence that phosphate credits can and have been purchased in respect of the proposed development, to ensure such appropriate SAC mitigation measures would be secured for the proposed dwelling. 1 As defined by Regulation 8 of the Conservation of Species and Habitats Regulations 2017 (as amended) (the Habitat Regulations)
[name] set out there is capacity within the sewage network; to accommodate the foul drainage from the proposed dwelling and the appeal site is not within an area identified to be at high risk of flooding. Also, it is proposed that water butts would intercept water from downpipes, permeable hardstanding used for parking areas and the internal water facilities of the new dwelling would be fitted with efficiency measures. However, despite such matters and that the proposal is for one dwelling, based on the evidence provided and that there is no mechanism is in place to secure the SAC mitigation measures, I cannot be certain the proposed development would not have an adverse effect on the integrity of the [name]. In such circumstances, I must dismiss the appeal on the basis it does not comply with Article 5B(1) of the Habitats Regulations.
For the same reasons, the proposal would not accord with Policies SS6, LD2 and SD4 of the Herefordshire Local Plan Core Strategy (October 2015) which, amongst other matters, require development proposals to conserve and enhance environmental assets, including the biodiversity of sites and species of European importance.
Section 06
Character and appearance
In view of my findings above, that the appeal must be dismissed having regard to the Habitats Regulations, it is not necessary for me to go on to consider the effect of the proposal on the character and appearance of the surrounding area or any
Section 07
Planning Balance and Conclusion
I have found that the proposal would constitute habitats development which is exempted from permission in principle under Article 5B(1) of the Order. Consequently, permission in principle cannot be granted.
It is undisputed that the Council cannot demonstrate a 5 year supply of housing land, stated to be just over 3 years, and there would be other social and economic benefits from the construction and occupation of the new dwelling. However, Footnote 7 of the National Planning Policy Framework provides a strong reason for refusing the proposed development. Consequently, the presumption in favour of sustainable development set out in paragraph 11d) ii does not apply.
In conclusion, for the reasons given above, the proposal conflicts with the development plan and the material considerations, including the protection afforded by Footnote 7 of the Framework, do not indicate that the appeal should be decided other than in accordance with it.
Accordingly, the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4986No official casework-database value to compare
- Extracted decision date · page 1
- 18 December 2025Matches the official casework database
- Extracted site visit dates
- 26 November 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6000750
- Application reference
- 251961
- Lead case reference
- Not recorded
- Planning authority
- Herefordshire Council
- Planning authority code
- E06000019
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 1,000 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 18 September 2025
- Valid date
- 18 September 2025
- Start date
- 24 September 2025
- Planning authority decision date
- 8 August 2025
- Appeal decision date
- 18 December 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 81871
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29