Skip to main content
Official casework recordDismissedCurrent release

Appeal 6000750

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

permission in principle for one dwelling.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The proposal is for permission in principle. The Planning Practice Guidance (PPG) advises that this is an alternative way of obtaining planning permission for housing-led development. The permission in principle consent route has 2 stages: the first stage (permission in principle stage) establishes whether a site is suitable in principle and the second stage (‘technical details consent’) is when the detailed development proposals are assessed. This appeal relates to the first of these 2 stages.

    The scope of the considerations for permission in principle is limited to location, land use and the amount of development permitted, as set out in the PPG. All other matters are considered as part of a subsequent [name] application if permission in principle is granted. I have determined the appeal accordingly and considered the illustrative site plan and section plan as indicative only.

  3. Section 04

    [name]

    The main issues are whether the site is suitable for residential development, having regard to its location, land use, and the amount of development, with particular regard to: • the effect on the River Wye Special Area of Conservation (SAC) and, • the character and appearance of the surrounding area.

  4. Section 05

    [name]

    Article 5B(1) of the Town and Country (Permission in Principle) Order 2017 (as amended) provides that permission in principle cannot be given for habitats development. This is defined in Article 5B(5) of the Order as development which is likely to have a significant effect on a European site1 either alone or in combination with other plans and projects and is not directly connected with or necessary for the management of the site. If a proposed permission in principle development is likely to have a significant effect on a qualifying European site without any mitigating measures in place, an Appropriate Assessment (AA) must be undertaken by the competent authority to establish whether the development would adversely affect the integrity of the protected site.

    Even if the appeal site is over 20km from the [name], it is within the catchment area for the [name], which is part of the [name]. The SAC is identified under the Habitats Regulations as being of international importance for its aquatic flora and fauna. There are a number of qualifying species in the SAC, which include white clawed crayfish, sea lamprey, brook lamprey, river lamprey, alis shad, twaite shad, Atlantic salmon, bullhead and otter. Additionally, qualifying habitats of the SAC include transition mires and quaking bogs and water course of plain to montane levels with Ranunculion fluitantis and Callitricho-Batrachion vegetation (rivers with floating vegetation often dominated by water-crowfoot).

    The present condition status of the [name] is unfavourable-declining, with the [name] component of [name] catchment in an unfavourable condition due to phosphates. In such areas any additional development that would result in a net increase in population served by a wastewater system, would require suitable mitigation measures to avoid further nutrient pollution. Consequently, the proposed dwelling would have likely significant effects on the integrity of the [name] due to nutrient pollution. Therefore, I must undertake an AA in accordance with Regulation 63 of the Habitats Regulations.

    To mitigate the effects of the proposed development on the SAC, the appellant proposes either a [name] package treatment plant to treat water discharge before discharging to the [name] sewer, or a suitable package treatment plant to retain all water discharge on-site that would meet relevant compliant standards. Additionally, aligned with the approach accepted by the Council when planning permission was granted for the 2 dwellings on the wider site (Council ref 214123), if deemed necessary, the appellant would purchase phosphate credits from the Council towards the [name] scheme.

    While the 2 dwellings were granted planning permission subject to conditions, including to restrict the occupation of the dwellings until the Tarrington integrated wetland scheme could provide effective mitigation for the effects of that development on the [name], the PPG sets out that it is not possible to impose conditions on a permission in principle. Therefore, I have considered the appeal proposal based on its own merits.

    The evidence provided does not include substantive drainage design details to demonstrate that the proposed development would not cause nutrient pollution, harmful to the integrity of the SAC. Also, I have no substantive evidence that phosphate credits can and have been purchased in respect of the proposed development, to ensure such appropriate SAC mitigation measures would be secured for the proposed dwelling. 1 As defined by Regulation 8 of the Conservation of Species and Habitats Regulations 2017 (as amended) (the Habitat Regulations)

    [name] set out there is capacity within the sewage network; to accommodate the foul drainage from the proposed dwelling and the appeal site is not within an area identified to be at high risk of flooding. Also, it is proposed that water butts would intercept water from downpipes, permeable hardstanding used for parking areas and the internal water facilities of the new dwelling would be fitted with efficiency measures. However, despite such matters and that the proposal is for one dwelling, based on the evidence provided and that there is no mechanism is in place to secure the SAC mitigation measures, I cannot be certain the proposed development would not have an adverse effect on the integrity of the [name]. In such circumstances, I must dismiss the appeal on the basis it does not comply with Article 5B(1) of the Habitats Regulations.

    For the same reasons, the proposal would not accord with Policies SS6, LD2 and SD4 of the Herefordshire Local Plan Core Strategy (October 2015) which, amongst other matters, require development proposals to conserve and enhance environmental assets, including the biodiversity of sites and species of European importance.

  5. Section 06

    Character and appearance

    In view of my findings above, that the appeal must be dismissed having regard to the Habitats Regulations, it is not necessary for me to go on to consider the effect of the proposal on the character and appearance of the surrounding area or any

  6. Section 07

    Planning Balance and Conclusion

    I have found that the proposal would constitute habitats development which is exempted from permission in principle under Article 5B(1) of the Order. Consequently, permission in principle cannot be granted.

    It is undisputed that the Council cannot demonstrate a 5 year supply of housing land, stated to be just over 3 years, and there would be other social and economic benefits from the construction and occupation of the new dwelling. However, Footnote 7 of the National Planning Policy Framework provides a strong reason for refusing the proposed development. Consequently, the presumption in favour of sustainable development set out in paragraph 11d) ii does not apply.

    In conclusion, for the reasons given above, the proposal conflicts with the development plan and the material considerations, including the protection afforded by Footnote 7 of the Framework, do not indicate that the appeal should be decided other than in accordance with it.

    Accordingly, the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4986No official casework-database value to compare
    Extracted decision date · page 1
    18 December 2025Matches the official casework database
    Extracted site visit dates
    26 November 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000750
Application reference
251961
Lead case reference
Not recorded
Planning authority
Herefordshire Council
Planning authority code
E06000019

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,000 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
18 September 2025
Valid date
18 September 2025
Start date
24 September 2025
Planning authority decision date
8 August 2025
Appeal decision date
18 December 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
81871
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29