Skip to main content
Official casework recordAllowedCurrent release

Appeal 6000798

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described on the application form as, “Single storey front porch with WC”.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for construction of a single storey front porch with WC at [site address] , Slough, [postcode] in accordance with the terms of the application, [name]/20820/000, and subject to the following

  2. Section 03

    conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Location And Block Plan Proposed ([name]. [name]-101), Floor Plans And Elevations ([name]. [name]-201).

    The external materials of the development hereby permitted shall match those used in the existing dwelling.

    The development hereby permitted shall be carried out in accordance with the measures specified in section 4 ([name]) of the submitted Flood Risk Assessment. The measures implemented shall be retained thereafter.

  3. Section 04

    [name]

    A revised description of development was agreed in writing by the Council and the appellant, and the application was determined on that basis. This has been reflected in the formal decision, above.

  4. Section 05

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the area.

  5. Section 06

    Reasons

    The appeal site comprises [site address] (No 8), a 2-storey end-of-terrace dwelling situated at the end of a run of similarly-designed modestly-sized properties, in a predominantly residential area. No 8 benefits from an existing porch. The proposed development seeks to demolish this porch, and to construct a single-storey front porch with WC in its place. Policy EX1 of the SPD1 provides that front extensions shall be single storey and normally restricted to front porches only. As a single-storey front porch, the proposed development would reflect these characteristics.

    Policy EX2 of the SPD provides that, amongst other things, front extensions should have a maximum depth of 1.5 metres for terraced houses. Paragraph 1.2.7 of the SPD makes clear that each planning application will be judged on its own individual merits. In this case, the proposed development would exceed this depth, but only by a marginal amount. Its depth would be similar to the existing porch and it would not protrude excessively from No 8’s front elevation. Its mono-pitched roof would be suitably positioned below No 8’s upper-floor windows. Much of No 8’s front elevation would remain visible in the street scene. As such, even though its footprint would be greater than the existing porch, its scale and massing would be proportionate with No 8. Furthermore, its materials would match those existing, thereby ensuring that the appearance of No 8 would be respected.

    Moreover, its scale and massing would be broadly comparable with the existing porch at 4 Shortfern (No 4), located a short distance from the site. Another porch is present at 5 Shortfern, which whilst smaller than the porch at No 4, due to its height and depth is a noticeable feature in the street scene. Although the Council has raised concerns relating to the planning history of these existing porches, they are established features in the street scene. I also observed numerous front porches of a considerable size and scale on [address], many of which are visible from Shortfern near the site. Hence, the proposed development would respect the character of the street scene and the design and appearance of the original house, as required by paragraph 3.2 of the SPD.

    I therefore find that the proposed development would have an acceptable effect on the character and appearance of the area. It would comply with Core Policy 8 of the Core Strategy2 and with Policies H15, EN1, and EN2 of the Slough Local Plan (adopted 2004) which collectively provide that, amongst other things, all development in the Borough shall be of a high quality design.

  6. Section 07

    Conditions

    I have considered the need for conditions against the advice on conditions set out in the National Planning Policy Framework (the Framework) and the Planning Practice Guidance (PPG).

    Conditions are necessary, in the interests of clarity and enforceability, setting out the timescale for the commencement of development (condition 1) and the approved plans (condition 2), respectively. A condition is necessary controlling external materials to ensure that the proposed development would have an acceptable appearance (condition 3). A condition is necessary requiring that the proposed development is carried out in accordance with the proposed mitigation measures detailed in the submitted Flood Risk Assessment, to ensure that the proposed development does not increase flood risk elsewhere (condition 4).

    As this appeal relates to a householder application, the biodiversity gain condition is not applicable. 1 Slough Local Development Framework Residential Extensions Guidelines Supplementary Planning Document (adopted 2010) 2 Slough Local Development Framework Core Strategy 2006 – 2026 Development Plan Document (adopted 2008)

  7. Section 08

    Conclusion

    For the reasons given above, having considered the development plan as a whole, the approach in the Framework, and all other relevant material considerations, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 368No official casework-database value to compare
    Extracted decision date · page 1
    4 November 2025Matches the official casework database
    Extracted site visit dates
    30 October 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6000798
Application reference
P/20820/000
Lead case reference
Not recorded
Planning authority
Slough Borough Council
Planning authority code
E06000039

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
241 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
23 September 2025
Valid date
23 September 2025
Start date
23 September 2025
Planning authority decision date
10 July 2025
Appeal decision date
4 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
79076
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21