Skip to main content
Official casework recordDismissedCurrent release

Appeal 6001060

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

dormer extension to rear roof slope in conjunction with formation of habitable rooms in roof space.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are the effect of the proposed development on a) the character and appearance of the building and wider area; and b) the efficiency of the existing solar panels at No.[address].

  3. Section 04

    Character and Appearance

    The appeal property is an existing two storey semi-detached dwelling. It is set back from the road and positioned within a well sized plot. This is broadly reflective of other houses in the area. The dwelling has been subject to some previous extensions. Some other properties in the vicinity have also been subject to extensions, including rear roof dormers. These works individually and collectively have not caused harm to the prevailing spacious residential character of the area.

    The proposal is principally for a large rear roof dormer which would extend across much of the width and depth of the existing roof. Notwithstanding the use of matching materials, on its own the dormer would appear as a projection of the roof itself rather than as a more discrete extension that emerges from it.

    The dwelling already has two, two-storey rear projections that extend out from the main roof. Thus, the proposal would not only have the appearance of overwhelming the existing roof but also of straddling these existing projections.

    Consequently, the dormer would be an obtrusive and dominating addition that would give the resulting dwelling an appearance that was both top-heavy and out of proportion with the rest of the building. This would harm both the appearance of the property and be out of keeping with the more modest scale of buildings and extensions in the vicinity and which contribute to the overall character of the area.

    The impact of the dormer on the character and appearance of the wider area would be modest due to its positioning. However, it would still be visible to neighbouring properties and from between houses on [address]. As such, the level of wider visibility and impact is a further reason to reject the poor design.

    The proposal includes rooflights to the front roof slope. The Council has not objected to this aspect of the scheme, and I see no reason to disagree.

    Nonetheless, I find that the proposal, specifically the proposed rear dormer, would harm the character and appearance of the host building and the wider area. As such, there would be conflict with Policy CS19 of the Gravesham Local Plan Core Strategy 2014 (LPCS) which, amongst other things, requires development to be visually attractive and take into account a site’s context and the local character. The proposal would also be contrary to the Supplementary Planning Document ‘[name]/[name] 2021 which requires roof extensions to complement the character of the existing property. Efficiency of the existing solar panels at No.13

    The Council has referred to the judgement in McLennan, R (on the application of) v Medway Council & Anor [2019] EWHC 1738 (Admin). This outlines that the contribution of domestic solar panels to the reduction in reliance on non-renewable energy is in the public interest and is therefore a material planning consideration.

    The appeal proposal would be positioned almost immediately to the south of the roof of No.13, which contains solar panels on its rear slope. At my site visit I noted that even in December at around midday, the low winter sun caused a shadow from the existing two-storey rear extensions to fall across some of these panels.

    Given the size and scale of the proposed dormer, it appears to me that the proposal could potentially have an effect upon the efficiency of the neighbour’s solar panels. The appellant suggests that any effect would be negligible. However, without any evidence, such as a shadow movement study of the existing situation and proposed development, I cannot be certain of these claims and the scale of any effects, or otherwise, of the appeal proposal upon the efficiency of the solar panels.

    Thus, the proposal would conflict with Policy CS18 of the LPCS insofar as it seeks to reduce the overall carbon footprint in the Borough. It would also conflict with paragraph 163 of the National Planning Policy Framework which, amongst other things, sets out that the need to mitigate and adapt to climate change should also be considered in assessing planning applications.

  4. Section 05

    Conclusion

    The proposal would cause harms which would conflict with the development plan taken as a whole. There are no material considerations that indicate the decision should be made other than in accordance with the development plan. Therefore, for the reasons given, I conclude that the appeal should not succeed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 272No official casework-database value to compare
    Extracted decision date · page 1
    16 December 2025Matches the official casework database
    Extracted site visit dates
    2 December 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001060
Application reference
20250648
Lead case reference
Not recorded
Planning authority
Gravesham Borough Council
Planning authority code
E07000109

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
400 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
13 October 2025
Valid date
13 October 2025
Start date
14 October 2025
Planning authority decision date
21 August 2025
Appeal decision date
16 December 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
81672
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21