Skip to main content
Official casework recordAllowedCurrent release

Appeal 6001063

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

construction of single storey rear extension to provide ground floor bedroom / shower room for disabled occupier.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for construction of single storey rear extension to provide ground floor bedroom / shower room for disabled occupier at [site address] in accordance with the terms of the application, Ref 25/01696/FULL6, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing nos 3MC/02WD & 3MC/04.

    The external materials of the extension hereby permitted shall match those used in the existing dwelling.

  2. Section 03

    Appeal Procedure and [name]

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the proposal. The main issues for which are a) whether it would be inappropriate development in the Green Belt; b) its effect on openness of the Green Belt; and c) if the scheme would be inappropriate development, whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.

  3. Section 04

    Inappropriate Development

    The appeal site comprises a modest two storey detached dwelling on a modern housing estate close to [site address] Airfield. It is bordered by other similar scaled buildings, and the immediate area is mostly built up save for some public open space to the north, opposite the estate road.

    Policy G2 of the London Plan (LP) explains that the Green Belt should be protected from inappropriate development. This is reflected by Policy 49 of the Bromley Local Plan 2019 (BLP). They both set out, as per the Framework, that it should not be permitted unless very special circumstances exist.

    The Framework does not set out what is meant by disproportionate for its purposes, although Policy 51 of the BLP, which deals explicitly with extensions to dwellings and follows on from 49’s position on inappropriate development, stipulates that the net increase in floor area over that of the original dwelling should be no more than 10%. The fact this is referred to as being ascertained by an external measurement indicates that floor area for its purposes is land take and not floor space which can occur over multiple storeys. The original building has been extended, at ground floor, to the rear. The Council estimate the total increase, taking into account the previous extension and the one proposed as part of the appeal scheme, to be in the region of 20%. The appellant sets out a higher figure but refers to floor space.

    Taking the lower increase, it would exceed Policy 51’s limits by more than a marginal degree. Despite the contextually small extension of the dwelling over the ground floor adjacent the previous as it is shown on the proposed plans, I can draw no further conclusion than, for the purposes of the development plan and the Framework taken together, the appeal scheme would represent disproportionate additions over and above the size of the original building. It would thus be inappropriate development in the Green Belt.

  4. Section 05

    Openness

    One of the essential characteristics of the Green Belt is its openness which, it has been established, has a visual and spatial aspect. The latter can be taken to mean the absence of built form. Given the modest size of the dwelling and the small size of the extended part into an existing rear patio area within a densely developed and built up housing estate, the effect upon the visual aspect would be very limited. Nevertheless, there is currently no built form where the appeal scheme would be, and the proposal would therefore unavoidably reduce the spatial aspect of the Green Belt’s openness. Whilst the degree of harm to the openness would be very limited, it would nonetheless be so. This would therefore be in further conflict with the position of the Framework and the aims of the aforementioned policies.

  5. Section 06

    [name]

    The Public Sector Equality Duty (PSED) contained in Section 149 of the Equality Act 2010 sets out the need to eliminate unlawful discrimination, harassment and victimisation, and to advance equality of opportunity and foster good relations between people who share a protected characteristic and people who do not share it. Disability is a protected characteristic to which the PSED applies.

    The appeal is supported by compellingly specific detail as to why the extension is required for a disabled occupant, and why the care needs of the individual relate specifically to the type, layout and size of the space proposed. The robustness of the justification is emphasised by demonstrating why the additional bedroom needs to be positioned next to an adjoining bathroom and how the space would allow both appropriate facilities for the family member’s needs and allow other family members to have space of their own for their own growth and need. Importantly, the submissions explain why the space, as well as having to be where it is, can’t be provided elsewhere, in another form or the existing configuration of the property.

    One could argue that exploration could be made as to a larger building to accommodate the family’s needs elsewhere, but the level of detail set out in the appellant’s evidence strikes me as a reasonable demonstration that the family is well settled, and this would not be feasible. Given the contextually modest size of the proposed extension, I am comfortable that the development would be limited to the space that would be required for their personal circumstances and nothing more.

  6. Section 07

    Conditions

    Other than the standard time limit condition, it is necessary to ensure that the development is carried out in accordance with the approved plans for certainty. In the interests of the character and appearance of the area, a condition relating to materials to match that of the existing dwelling is also necessary.

  7. Section 08

    Conclusion and Recommendation

    There would be harm to the Green Belt by virtue of the appeal scheme being inappropriate development and unacceptably reducing openness. As per the Framework, these would be worthy of substantial weight. For the reasons I have set out above, I would ascribe greater weight to the specific evidenced need for the extension, in the context of its own size and setting. Such that very special circumstances exist. The proposed development would therefore comply with Policies 49 of the BLP and Policy G2 of the LP, the aims of which I have set out above. Material considerations, nor the technical conflict with Policy 51, would indicate otherwise. I therefore recommend that the appeal should be allowed.

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s report and on that basis the appeal is allowed, and planning permission granted, subject to the above mentioned conditions.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1895No official casework-database value to compare
    Extracted decision date · page 1
    28 January 2026Matches the official casework database
    Extracted site visit dates
    6 January 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001063
Application reference
25/01696/FULL6
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
350 m²
Number of residences
Not recorded
Site in Green Belt
Yes
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
13 October 2025
Valid date
13 October 2025
Start date
16 October 2025
Planning authority decision date
9 October 2025
Appeal decision date
28 January 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
83447
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21