Skip to main content
Official casework recordDismissedCurrent release

Appeal 6001186

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

roof alterations to include raising the ridge height, loft conversion with a rear dormer and Juliet balcony and side(s) rooflights. Construction of an external chimney stack to side elevation.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    I have taken the description of development used in the heading above from the Council’s decision notice and submitted appeal form, for reasons of clarity and conciseness. I have however removed the reference to a previously approved application.

    I am aware of a previously approved application at the appeal site (Ref: 25/0029/FULL6). The evidence before me outlines how the appeal differs from that application by virtue of the roof alterations, rear dormer and Juliet balcony, side rooflights and chimney.

    On my site visit, construction was ongoing and much of the house was covered by scaffolding. However, I am satisfied that from the evidence before me that I can clearly see what the appeal property looked like before such works commenced.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed roof extension on the character and appearance of the area.

  4. Section 05

    Reasons

    The appeal site relates to a two-storey detached property on a cul-de-sac known as Brookside. Surrounding development comprises detached dwellings, generally of a similar size and style.

    The site is located within the Knoll Area of Special Residential Character (ASRC). [name] is not specifically referenced in the area description in the London Borough of Bromley Local Plan (BLP), it recognises it as one of the closes off [address]. The description outlines how [address] features typical detached two storey properties within substantial plots, featuring hip roofs with front or side pitched elevations.

    Brookside slopes upwards from its access off [address] to the turning point at the top of Brookside. The ridge heights of the dwellings respond to the topography of the street, and as a result 2 Brookside (No.2) sits at a lower elevation than the appeal property, whilst 4 Brookside (No.4) sits at a higher elevation. This creates a strong sense of rhythm and harmony and contributes positively to the character and appearance of the area, including the ASRC.

    The proposed increase to the ridge height would result in it sitting noticeably higher than the roof ridge of No.4, despite the appeal property sitting at a lower level. This would disrupt the pattern of increasing ridge heights as you travel upwards along Brookside, from [address], and would appear out of keeping with surrounding development.

    The proposal would also increase the overall bulk and massing of the roof, utilising a crown roof form and rear dormer, to accommodate additional accommodation. When considered together, the increased ridge height and enlarged roof would appear bulky and overly dominate within the street scene. In particular, the increased ridge height would detract from the sense of rhythm and harmony along the street.

    The 45-degree pitch of the roof, the building line and the spacing between properties would be generally maintained. Proposed materials would also match the existing. Nonetheless, this would not offset the harm identified above. Whilst the site benefits from generous proportions, mature landscaping and off-street parking, the enlarged roof would be readily apparent, appearing visually jarring within the street scene.

    The rear dormer may not be readily visible from the street scene, and the proposed works may also not be readily visible from the wider ASRC. Nonetheless, a lack of visibility does not equate to a lack of harm. Additionally, the proposed dormer must be considered cumulatively alongside the other proposed changes to the roof.

    [name] acknowledge there is some minor variations in form, finish and detailing along Brookside, there is a general consistency in the decreasing ridge heights as you travel along Brookside towards [address]. Additionally, side extensions, porches or different materials are not directly comparable to a substantial roof extension. Whilst the appellant indicates that there are extended roof forms in the area, I have not been directed to any which permit a substantial increase in height.

    Overall, for the reasons set out above, the scheme would result in unacceptable harm to the character and appearance of the area, which includes the [name]. The scheme would therefore be contrary to Policies 6, 37 and 44 of the BLP and Policy D3 of the London Plan. Collectively, amongst other matters, these policies seek to ensure high quality design that respects and positively contributes to the street scene and surrounding area.

  5. Section 06

    Conclusion

    The proposal would conflict with the development plan as a whole and there are no other considerations, including the provisions of the National Planning Policy Framework, which outweigh this finding. Therefore, for the reasons given above, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted decision date · page 1
    23 January 2026Matches the official casework database
    Extracted site visit dates
    13 January 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001186
Application reference
25/03579/HPA
Lead case reference
Not recorded
Planning authority
London Borough of Bromley
Planning authority code
E09000006

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
746 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
20 October 2025
Valid date
20 October 2025
Start date
23 October 2025
Planning authority decision date
12 September 2025
Appeal decision date
23 January 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
83225
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21