Appeal 6001282
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of upto 9No dwellings.
Section 02
Decision
The appeal is dismissed.
Section 03
Procedural Matters
The permission in principle (PiP) route provides an alternative means of obtaining planning permission for housing-led development. It comprises two stages. The first stage, relevant to this appeal, establishes whether a site is suitable in principle for the proposed land use and amount of development. The second stage, technical details consent (TDC), considers the detailed design, layout, mitigation and all other reserved matters.
The scope of PiP is therefore intentionally limited. At this stage, the decision must be confined to location, land use and amount. Conditions cannot be imposed, and detailed mitigation measures fall to be secured, where necessary, at the TDC stage.
Article 5B of the Town and Country Planning (Permission in Principle) Order 2017 (the Order) prevents the grant of PiP for development that constitutes “habitats development”. This includes development likely to have a significant effect on a European site, unless directly connected with its management. The competent authority must therefore consider whether the proposal is likely to have such an effect, and whether sufficient information exists to rule out adverse effects on site integrity.
The Shadow Habitats Regulations Assessment (sHRA) was submitted by the appellant for the first time at appeal. I have considered whether accepting this evidence would give rise to procedural unfairness. The document is proportionate, self-contained and does not rely on seasonal survey work or information that could not reasonably be verified by the Council. The Council has had a full opportunity to comment on the assessment during the appeal process, and no prejudice to its position has been identified. I have therefore taken into account the content of the sHRA when reaching my decision.
Section 04
Main Issue
The main issue is whether sufficient information exists at the permission in principle stage to conclude that the proposal would not adversely affect the integrity of the Bath and Bradford on Avon Bat Special Area of Conservation (SAC), having regard to the Conservation of Habitats and Species Regulations 2017 (the Habitats Regulations).
Section 05
Reasons
The site lies within the [name] of the [name] (TWBMS), an area recognised as contributing to the ecological functioning of the Bath and Bradford on [name]. The SAC is designated for greater horseshoe, lesser horseshoe and Bechstein’s bats, and its conservation objectives require the maintenance and restoration of habitats essential to these species. Development within this zone therefore carries a heightened risk of undermining the SAC’s ecological integrity.
Regulation 63 of the Habitats Regulations imposes a strict legal test: permission may not be granted unless the competent authority can be certain that the proposal would not adversely affect the integrity of the SAC. This precautionary requirement is absolute. Where any uncertainty remains, permission must be refused.
The sHRA, prepared by a suitably qualified ecologist, identifies impact pathways relevant to the SAC’s qualifying species. While it records the absence of roosting features on the site, this does not remove the need for certainty regarding other potential effects. The identification of any credible pathway is sufficient to engage Regulation 63 and prevents the competent authority from concluding that the proposal falls outside the scope of habitats development.
The site does not contain strategic commuting corridors, but the absence of such features does not eliminate the identified risk. The retained vegetation along the northern and western boundaries, although not part of a known commuting route, remains susceptible to functional disturbance, and its presence contributes to the overall uncertainty regarding the site’s ecological role.
The foraging habitat present, although limited in extent and value, nonetheless forms part of the ecological baseline. Its partial suitability for lesser horseshoe bats means that its loss or alteration cannot be dismissed as ecologically irrelevant. The fragmented and peripheral nature of the habitat does not remove the need for certainty that its disturbance would not undermine the SAC’s conservation objectives.
The TWBMS sets out measures necessary to avoid adverse effects on the SAC, including lighting controls and strategic habitat contributions. None of these measures can be secured at the PiP stage. Because the proposal relies on mitigation that cannot lawfully be securing at this stage, the competent authority is left without the means to ensure that adverse effects would be avoided.
The sHRA identifies potential light spill affecting approximately 146 metres of retained vegetation. This constitutes a clear effect pathway to which the qualifying species are sensitive. In the absence of secured mitigation, the competent authority cannot exclude the possibility of adverse effects. The existence of this unresolved pathway means that the proposal fails the Regulation 63 test.
The Council’s reference to the absence of a financial contribution under the TWBMS further highlights the legal barrier. Where a proposal depends on a strategic habitat contribution to avoid adverse effects, and where such a contribution cannot be secured at PiP, the competent authority is legally prevented from concluding that the proposal would not harm the SAC.
Following Appropriate Assessment, I conclude that the appellant’s contention that the proposal is not likely to have a significant effect is dependent on mitigation that is not secure at this stage. Regardless of the housing supply situation and any benefits that may result from the development, it is, therefore, habitats development within the meaning of Article 5B of the Order. PiP cannot, therefore, be granted.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4831No official casework-database value to compare
- Extracted decision date · page 1
- 6 March 2026Matches the official casework database
- Extracted site visit dates
- 6 February 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6001282
- Application reference
- PL/2025/04448
- Lead case reference
- Not recorded
- Planning authority
- Wiltshire Council
- Planning authority code
- E06000054
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 4,000 m²
- Number of residences
- 9
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 24 October 2025
- Valid date
- 30 October 2025
- Start date
- 30 October 2025
- Planning authority decision date
- 18 September 2025
- Appeal decision date
- 6 March 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 85501
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29