Appeal 6001303
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a loft conversion with rear and side pitched roof dormers, demolition of conservatory and existing side and rear extension rendered to match existing property with roof to be replaced with a flat roof.
Section 02
Decision
The appeal is dismissed
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
Since the original decision the Council have adopted the Charnwood Local Plan (2026). This replaces the Charnwood Local Plan Core Strategy (2015) and the saved policies from the Borough of Charnwood Local Plan (2004) such that the policies of those plans cited on the decision notice are no longer part of the development plan and have no weight. I have therefore considered the relevant policies within the Charnwood Local Plan (2026). Both main parties have had the opportunity to comment on the new local plan.
The Council’s concerns are focussed on the proposed side dormer. I have defined the main issue on that basis.
Section 05
Main Issue
The main issue is the effect of the proposed side dormer on the character and appearance of the host dwelling and the surrounding area.
Section 06
Reasons for the Recommendation
The appeal site comprises a two-storey detached dwelling with a main hipped roof and a smaller gable above a bay window feature. There is some variation to the roof scape along [address], albeit most of the dwellings have hipped or gable roof forms. However, the roof slopes are generally plain and unaltered. Furthermore, where there are dormer windows, these are mostly small and have a discreet presence in the street scene. The appeal property’s hipped roof with gable feature is in keeping with the surrounding roof scape and as such, it contributes positively to the character and appearance of the area.
The Council’s Design Supplementary Planning Document (2020) (SPD) advises that unless there are existing dormers in the area, new dormers are likely to be out of character with its surroundings. If dormers are used, they should be as small as possible. They should match the window style and roof pitch of the existing property. They should also be kept as low as possible and should be kept to those areas which are most difficult to see.
Due to the excessive scale and mass of the proposed side dormer, it would appear as a large and bulky addition to the roof of the appeal property. Its roof pitch would fail to match the pitch of the main hipped roof, and the window would not reflect the style of the window at the floor below. The bulky scale and incongruous design would be amplified by the dormer window’s elevated siting on the side of the property where it would be highly prominent. Consequently, the side dormer would be harmful to the character and appearance of the host dwelling and the surrounding area.
I observed the side dormer window at [address] (No 65) on my site visit. However, the plans for this, as well as the circumstances in which it was constructed are not before me in order for me to give it significant weight. From my own observations and bearing in mind I viewed the dormer window from street level; it does not appear as wide and bulky as the appeal dormer. Furthermore, it is of a different design, and its window appears to be more in keeping with the first-floor window below. It therefore appears to be well integrated in its own host dwelling, more so than the appeal proposal. Accordingly, the dormer window at No 65 does not justify the appeal.
Therefore, I conclude that the proposed side dormer would be harmful to the character and appearance of the host dwelling and the surrounding area. It would be contrary to Policy DS4 of the Charnwood Local Plan (2026) which requires, amongst other things, that new developments make a positive contribution including by respecting and enhancing the character of the area, having regard to scale and massing.
It would also conflict with the SPD, as well as the National Planning Policy Framework, which seek high quality design which makes a positive contribution to the area and that dormer windows should be as small as possible and in areas which are most difficult to see.
Section 07
Other Matters
The appellant states that with some minor alterations, it would comply with ‘Class B of Part 1, Schedule 2 of the GPDO 2015 (as amended)’ and would fall under permitted development. However, there are no plans of such a development or a lawful development certificate for such a development before me. Therefore, I am unable to make a direct comparison between the appeal and any permitted development fallback position. The appellant also states that it would need to be set back up the roof slope slightly, which suggests that it would be less harmful than the appeal. As such, this matter does not lead me to a different conclusion on the appeal overall.
I also recognise that the appellant is frustrated with the lack of communication and engagement by the Council as well as the absence of an opportunity to provide amendments. However, these are not reasons to allow the appeal, and my recommendation is based on the planning merits of the proposal.
Section 08
Conclusion and Recommendation
The proposed development would be contrary to the development plan as a whole and there are no other material considerations which would outweigh this conflict. Therefore, I recommend that the appeal is dismissed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 145No official casework-database value to compare
- Extracted decision date · page 1
- 9 April 2026Matches the official casework database
- Extracted site visit dates
- 6 January 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6001303
- Application reference
- P/25/1615/2
- Lead case reference
- Not recorded
- Planning authority
- Charnwood Borough Council
- Planning authority code
- E07000130
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 610 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 27 October 2025
- Valid date
- 27 October 2025
- Start date
- 29 October 2025
- Planning authority decision date
- 24 September 2025
- Appeal decision date
- 9 April 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 87157
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21