Skip to main content
Official casework recordAllowedCurrent release

Appeal 6001319

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

installation of an air source heat pump to be installed to the property.

  1. Section 02

    Decision

    The appeal is allowed and the planning permission Ref 25/00869/FULHH for installation of an air source heat pump to be installed to the property at [site address] granted on 12 September 2025 by Melton Borough Council, is varied by deleting conditions 3 and 4 and substituting for them the following condition:

    The level of noise emitted from the hereby approved air source heat pump shall not exceed 42 dB LAeq 1 hour, between 0700am and 2300pm and 40 dB LAeq 5 minutes, at any other time, as measured 1 metre from the nearest window or door of a habitable room in any neighbouring property.

  2. Section 03

    Background and Main Issue

    Planning permission for an air source heat pump was granted subject to 4 conditions. Conditions 3 and 4 set noise levels and restrict when the air source heat pump could be operational. These conditions were attached to protect the living conditions of neighbouring occupiers.

    Paragraph 57 of the National Planning Policy Framework (the Framework) advises that conditions should be kept to a minimum and only imposed where they are necessary, relevant to planning and the development permitted, enforceable, precise, and reasonable in all other aspects.

    The appellant seeks to remove conditions 3 and 4, on substantive grounds. As such, the main issue of the appeal is whether conditions 3 and 4 are necessary and reasonable, with particular regard to the effect of the proposed development on the living conditions of neighbouring occupiers.

  3. Section 04

    Reasons

    Condition 3 specifies that no noise from the proposed air source heat pump shall be audible from the boundaries of the adjacent properties. The Environmental Health Officer has indicated that background sound levels are likely to be very low, and ambient noise is minimal during night-time hours.

    [name] agree with the Environmental Health Officer’s assessment, this alone does not justify requiring the air source heat pump to be inaudible from the property’s boundary. Even when having regard to the tonality and impulsivity of the proposed noise, low levels of noise would not have a materially harmful effect on the living conditions of neighbouring occupiers. The requirement for the air source heat pump to be inaudible from the property’s boundary is too strict. As such, Condition 3 is not reasonable. Condition 4

    Condition 4 states that the air source heat pump shall operate between the hours of 07:00 and 22:00 only. An air source heat pump is used to provide heat and hot water. As a result of Condition 4, occupiers of the appeal property could be without heating or hot water for long periods and during the coldest part of the day. Therefore, restricting the use of the air source heat pump to day-time hours would be unreasonable. In turn, Condition 4 is not reasonable.

  4. Section 05

    Proposed condition

    Notwithstanding the above, the air source heat pump would make noise and would be in proximity to a neighbouring property. Also, background noise levels are likely to be low, especially at night, due to the rural character of the area. Moreover, MCS 20(a) Planning Standard is an industry-recognised standard for assessing noise generated by air source heat pumps. The appellant’s manual sound calculation indicated that the proposed air source heat pump would generate noise in excess of the level recommended within MCS 20(a) Planning Standard.

    However, the appellant contends that a calculation against MCS 20(a) Planning Standard gives the worst case scenario and is conservative. As such, they have completed a Noise Assessment1 using a methodology consistent with [name] 4142:2014+A2:2019 (BS4142). BS4142 provides guidance on assessing industrial sound. The result of the Noise Assessment is that the noise level at the nearest neighbouring window would be 29dB(A). This noise level is below the recommended acceptable noise levels specified within BS4142.

    Accordingly, there is conflicting evidence on whether the proposed air source heat pump would emit unacceptable levels of noise. Therefore, a condition is necessary to ensure that the living conditions of neighbouring occupiers are preserved.

    The Council indicated 2 proposed conditions that it considered should replace conditions 3 and 4 in the event that I allow the appeal. I have considered these conditions against paragraph 57 of the Framework. 1 ISO 9613-2 Site Specific Noise Map Report

    The Council suggested that the noise levels emitted by the air source heat pump shall not exceed specified noise levels when measured in accordance with BS4142. This is reasonable as it is in accordance with a recognised standard for assessing industrial noise. Furthermore, although the evidence is conflicting, it appears that the proposed air source heat pump could comply with the specified noise levels. It would also provide the Council with precise noise limits against which it could enforce.

    The second part of that proposed condition which is entitled “Fallback for [name]” is not necessary, as the first part of the condition provides sufficient control for the installation of all types of air source heat pumps.

    With regard to the other suggested condition there is no need to attach a new condition specifying a time limit to implement the planning permission, as Condition 1 attached to the original permission still applies.

  5. Section 06

    Conclusion

    [name] 3 nor Condition 4 are reasonable. However, a condition is necessary in order to ensure that the proposed air source heat pump does not emit unacceptable noise levels. Consequently, the appeal should succeed and conditions 3 and 4 should be removed, and a new condition should be imposed. The imposition of the new condition is necessary to ensure that the proposal complies with Policy D1 of Melton Local Plan 2011-2036, October 2018, which indicates that the amenity of neighbours should not be compromised.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5389No official casework-database value to compare
    Extracted decision date · page 1
    17 February 2026Matches the official casework database
    Extracted site visit dates
    22 January 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001319
Application reference
25/00869/FULHH
Lead case reference
Not recorded
Planning authority
Melton Borough Council
Planning authority code
E07000133

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
granted
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
451 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
28 October 2025
Valid date
29 October 2025
Start date
30 October 2025
Planning authority decision date
12 September 2025
Appeal decision date
17 February 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
84516
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29