Appeal 6001375
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
retrospective planning application for the retention of a retractable roof cover on demountable structure built at the rear garden- patio area.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
During my site visit, I observed a development which appeared to be the same as that shown on the application plans. I have therefore determined the appeal on the basis that planning permission is sought to retain the development that has been constructed.
Section 05
Main Issue
The main issue is the effect of the development on the living conditions of occupants of surrounding residential properties with regard to noise and disturbance.
Section 06
Reasons for the Recommendation
The appeal building is a commercial building situated in the middle of a terrace of other commercial units. To the rear of the terrace are rear yards serving each unit. Beyond this are residential properties and gardens situated on [address].
The front of the site forms part of an active street-scene where there is likely to be noticeable levels of noise at most times, however the rear of the appeal site is markedly different. It is significantly quieter and provides a welcome relief from the busy street at the front. The appeal structure results in increased commercial activity to the rear of the site. Due to the enclosed nature of the structure, allowing it to be used year-round, the development has significantly intensified the use of the land. This has resulted in additional noise and disturbance for occupants of surrounding residential properties, particularly at night-time when occupants may expect a quieter noise environment. Due to the retractable nature of the structure’s roof, the music facilities present, as well as its lightweight construction, and in the absence of any noise surveys I cannot be certain of the sound insulation qualities of the structure. In the absence of any substantive evidence to the contrary, taking into account the existing ambiance and levels of background noise I observed at the rear of the site, the development results in unacceptable levels of noise and disturbance.
I note the appellant’s comments citing the presence of other noise generators in the vicinity of the appeal site in the form of a haulage company and the trainline. However, whilst I observed on my site visit that the trainline resulted in a noticeable degree of noise, due to its intervening distance and in the absence of further details of the operating hours of the haulage business, I am not persuaded that there are sufficient similarities to the noise created by the appeal scheme before me.
The appellant has suggested limiting the hours of the structure to be in use between 11:00 – 21:30. [name] acknowledge that this would control any noise levels late at night or early in the morning this would not mitigate the noise created during the hours of operation which I consider to be unacceptable due to the appeal site’s residential backdrop.
I also acknowledge the previous arrangement to the rear of the appeal site evidenced by the appellant of the presence of tables and chairs historically, which the appellant suggests results in greater noise and disturbance than the appeal development. Whilst removable structures within the same planning unit may be outside the remit of planning control, I am not persuaded that in this instance it would justify the harm I have identified. Based on the submitted evidence, the appeal scheme appears to show a greater intensity of use within a permanent structure, that allows for all-weather and all-year use. The two entities are therefore quite different, and it does not lead me to conclude in favour of the appeal.
I therefore conclude that the development results in harm to the living conditions of the occupants of surrounding residential properties with regard to noise and disturbance. The development therefore fails to accord with Policies 37, 96 and 98 of the Bromley Local Plan (2019) which seek amongst other things for there to be no harm or loss of amenity to nearby residents through noise, disturbance and unneighbourly opening hours.
Section 07
Other Matters
I acknowledge the biodiversity improvements accompanying the development highlighted by the appellant. However, this does not alleviate or outweigh the harm I have identified in regard to the main issue. I note the appellant has referred to the lack of objections to the appeal scheme; however, an absence of objections is a neutral factor in the planning balance. I also note the appellant has highlighted that the scheme provides accessibility for all customers, however I am not persuaded that this was not the case with the previous arrangement nor does it outweigh the harm I have identified.
Section 08
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 145No official casework-database value to compare
- Extracted decision date · page 1
- 5 May 2026Matches the official casework database
- Extracted site visit dates
- 3 March 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6001375
- Application reference
- 25/02020/FULL1
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Bromley
- Planning authority code
- E09000006
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor retail and services
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 178 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 30 October 2025
- Valid date
- 30 October 2025
- Start date
- 5 November 2025
- Planning authority decision date
- 8 August 2025
- Appeal decision date
- 5 May 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 88241
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29