Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

a two-storey rear extension to provide additional living accommodation.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a two-storey rear extension to provide additional living accommodation at [site address] in accordance with the terms of the application, Ref 25/02429/FUL, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing no’s: PL03 (proposed floor plan), PL04 [name] (proposed elevations), and PL06 [name] (existing and proposed site plans).

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    [name]

    The statement of appeal references the submission of two additional plans at appeal stage. Drawing PL04 [name] (proposed elevations) removes a previously depicted front porch that was included in error and drawing PL06 [name] (existing and proposed site plans) has added a hatched area to denote the proposed development. Given that the front porch was previously only depicted on one of the proposed plans and it is clear from the description of development what the proposal pertains to, I do not believe that any party would be prejudiced by my acceptance of these revised drawings.

  4. Section 05

    Main Issue

    The main issues are: i) whether the proposal would be inappropriate in the Green Belt having regard to the National Planning Policy Framework (the Framework) and any relevant development plan policies; ii) the effect of the proposal on the openness of the Green Belt; and iii) whether any harm by reasons of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to the very special circumstances required to justify the proposal.

  5. Section 06

    Whether or not inappropriate development in the Green Belt

    Policy CP8 of the Bath and North East Somerset Local Plan – [name] (2014) confirms the openness of the Green Belt will be protected from inappropriate development in accordance with national planning policy. In that regard, Paragraph 154 of the Framework outlines that development in the Green Belt should be regarded as inappropriate, save for a number of exceptions. One such exception is 154 c) the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building.

    Policies GB1 of the Council’s Placemaking Plan (2017) and GB3 of the Council’s Core Strategy and Placemaking Plan incorporating the Local Plan Partial Update (2023) are generally consistent with the Framework insofar as they seek proposals that should not prejudice the Green Belt and that extensions will only be permitted where they are not disproportionate.

    The meaning of ‘disproportionate additions’ is not defined within the Framework. The Council’s ‘[name] in the Green Belt – Supplementary Planning Document’ (2008) (SPD) indicates that whether an addition is disproportionate depends on the site, the dwelling and the nature of the proposed extension. I agree, and therefore whilst the SPD indicates that in many circumstances a well-designed extension resulting in a volume increase of about a third of the original dwelling would be more likely to be acceptable, there are also likely to be other considerations in terms of the merits of any particular case. Typically, this may include factors such as footprint, floorspace and site-specific context for example. In the absence of a definitive description in the development plan policies of the Framework, what may be disproportionate is therefore a matter of planning judgement.

    The appeal dwelling has not previously been extended. The Council suggests that the proposal would represent a volume increase of approximately 60%. Whilst that would be more than a third of the volume of the original building, its provision over two floors would limit the extent of the extension’s footprint. This would ensure that the addition would not exceed 50% of the depth of the host dwelling and would sit in line with the recently completed extension to the adjoining semi at 1 Culverhay, squaring off the semi-detached pair. In addition, the roof of the extension would be set down at ridge level. Taking these site-specific factors into account, the extension would not be a disproportionate addition over and above the original size of the building.

    Consequently, the proposal would not be inappropriate development in the Green Belt having regard to the Framework and the relevant development plan policies.

    In meeting the relevant exception at Paragraph 154 c) of the Framework, openness is implicitly taken into account. It is therefore not necessary to consider the second or third main issues.

  6. Section 07

    Conditions

    In addition to the standard time limit condition, it is also necessary to specify the approved drawings which in this case includes the revisions set out under the preliminary matter. These conditions are necessary in the interests of certainty and precision.

  7. Section 08

    Conclusion and Recommendation

    For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be allowed.

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s report and on that basis the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 121No official casework-database value to compare
    Extracted decision date · page 1
    13 May 2026Matches the official casework database
    Extracted site visit dates
    17 March 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001384
Application reference
25/02429/FUL
Lead case reference
Not recorded
Planning authority
Bath and North East Somerset Council
Planning authority code
E06000022

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Householder
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
600 m²
Number of residences
Not recorded
Site in Green Belt
Yes
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
31 October 2025
Valid date
31 October 2025
Start date
5 November 2025
Planning authority decision date
18 August 2025
Appeal decision date
13 May 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
88702
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21