Skip to main content
Official casework recordDismissedCurrent release

Appeal 6001483

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the erection of a two-storey detached new build dwelling.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The application sought outline planning permission, with the matters of access, layout and scale being for determination at this stage.

  3. Section 04

    [name]

    The main issues are: • Whether the location of the development is acceptable with regard to the locational strategy of the development plan and accessibility to services, • The effect of the proposal on the character and appearance of the area, and • The effect of the proposal on biodiversity.

  4. Section 05

    Location

    Policy CSP.4 of the Forest of [name] (the [name]) sets out that development will be expected to take place within existing settlement boundaries, and that areas outside of settlement boundaries will be treated as part of the countryside. Policy CSP.5 further re-enforces that development will be focussed to settlements and urban areas. This approach is also supported by policy AP 1 of the Forest of Dean Council Allocations Plan (the Allocations Plan) which aims to ensure that development is undertaken in a sustainable manner. Given the sites location outside of any settlement boundary, and therefore in the countryside, the proposal conflicts with the requirements of these policies.

    In terms of access to services, the appeal site is located, according to the appellant, approximately 1.5 miles from Wollaston, which is the nearest settlement. There are no public transport services directly serving the site, and the nearest bus stops are a minimum of 1.2 miles distant. The submitted Design and Access statement outlines that these are a 22- and 25-minute walk from the site, using public footpaths. However, I observed that the routes to these bus stops would involve walking or cycling along single-track rural roads, with no lighting or footways present. As such, this would be an unattractive proposition for future residents. Consequently, residents would be highly likely to rely on the use of the private car in order to access services.

    Thus, the location of the development is not acceptable with regard to the locational strategy of the development plan and accessibility to services, and the proposal would conflict with policies CSP.4 and CSP.5, as well as policy AP 1.

  5. Section 06

    Character and appearance

    The appeal site occupies an area of land that currently comprises part of the garden area of the adjacent property. It is located along a narrow, single track rural road, which serves a small number of existing residential properties. These properties are sporadically positioned along this road, and, in some instances, there is substantial spacing between the buildings. This sparse arrangement of properties is an attractive and characteristic feature of the rural locality within which the site sits.

    The proposed development would result in the introduction of new built form into one of the gaps that exists. While it would not result in the closing up of the entire gap, it would nonetheless diminish the open quality of the existing arrangement of dwellings. It would consolidate the built development within the vicinity, eroding the rural character and appearance of the area.

    I have nothing to suggest that the development would impact on any important views. Notwithstanding this, it does not dissuade me that a new dwelling at this location would serve to erode the intermittent positioning of buildings along the road, and thus it would appear as an incongruous and intrusive feature at this location, that would not be ameliorated by the addition of landscaping within any proposed scheme.

    Therefore, the development would be harmful to the character and appearance of the area. The scheme therefore conflicts with policy CSP.1 of the [name], and policies AP.4 and AP.5 of the Allocations Plan. Together, and amongst other things, these seek to ensure that development maintains or enhances the environment, is of a high-quality design, and protects local distinctiveness.

  6. Section 07

    Biodiversity

    The Council highlight that although the nearest component of the Wye Valley and Forest of Dean Bat Site Special Area of Conservation (the SAC) is approximately 4 kilometres (km) from the site, there is evidence of long-distance connections between the SAC and the Woodchester Park Site of Special Scientific Interest greater and lesser horseshoe bat maternity roost in the Cotswolds, to the east. There is also a bat roost within 150 metres, and a further 1.6km distant. Given that bats are a highly mobile species, these roosts are considered to be functionally linked to the SAC. In this context, there is significant potential for development at the site to have an effect on protected species, as well as on the SAC, as a habitat site.

    There is no ecological assessment in respect of the likely effect of the proposed development. As a consequence, in the absence of evidence to the contrary and adopting a precautionary approach, I cannot be satisfied that the proposed development on this site would not have a likely significant effect on protected species or the SAC.

    The appellant has indicated that they would be willing to undertake surveys and requests that a pre-commencement condition be imposed to any permission requiring the submission and approval of appropriate ecological information. However, I am mindful of the guidance of Circular 06/2005 - Biodiversity and Geological Conservation – Statutory obligations and their impact within the planning system (the Circular). The presence of a protected species is a material planning consideration. The Circular clearly outlines that it is essential that the presence or otherwise of protected species, and the extent that they may be affected by the proposed development, is established before planning permission is granted. Otherwise, all relevant considerations may not have been addressed in making the decision.

    In the absence of appropriate ecological information at this stage, I am not able to ascertain that any effect on biodiversity, including a habitat site, would be acceptable. The Circular further advises that the need to ensure that ecological surveys are carried out should only be left to coverage under planning conditions in exceptional circumstances. I am not convinced that any such circumstances exist in this case.

    Therefore, I have insufficient information to be able to be satisfied that the development would not have a harmful effect on biodiversity. Thus, I am unable to find that the proposal would accord with policy CPS1 of the [name], or policies AP.1, AP.7, and AP.8 of the Allocations Plan. Together, and amongst other things, these policies seek to ensure that development respects the natural environment, improves environmental conditions, and safeguards biodiversity.

  7. Section 08

    Planning Balance

    It is common ground that the Council is unable to demonstrate a five-year supply of deliverable housing sites. However, I have found above that I am not able to conclude that the development would not result in harm to a habitat site. There are policies within the Framework therefore that provide a clear reason for refusing permission for the proposed development. In this case, the presumption in favour of sustainable development, as envisaged by paragraph 11 of the National Planning Policy Framework does not apply to the appeal scheme.

    The scheme would conflict with policies within the development plan in respect of the location of the development, the effect on the character and appearance of the area and effect on biodiversity.

    There are however benefits to be balanced against these harms. The scheme is offered as a self-build dwelling which would make a contribution to this form of development and to housing supply in general. There would also be limited economic benefits that would arise both during and post-construction. In addition, the appellant highlights that the dwelling would be designed to include sustainability measures.

    The appellant offers to relinquish an existing planning permission for a holiday let development at the site. However, there is no legal agreement before me that would secure this and as such this has little bearing on my decision. The lack of objection from the parish council or neighbouring occupiers are neutral matters in

  8. Section 09

    the planning balance.

    Considering all matters, the benefits of the scheme are insufficient to outweigh the harm, and consequent conflict with the development plan, which would result from the development.

  9. Section 10

    Conclusion

    The proposal would conflict with the development plan as a whole and there are no other considerations, including the provisions of the Framework, which indicate a decision should be made other than in accordance with the development plan.

    For the reasons given above I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 192No official casework-database value to compare
    Extracted decision date · page 1
    17 March 2026Matches the official casework database
    Extracted site visit dates
    3 February 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001483
Application reference
P0454/25/OUT
Lead case reference
Not recorded
Planning authority
Forest of Dean District Council
Planning authority code
E07000080

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Outline
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
2,485 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
5 November 2025
Valid date
12 November 2025
Start date
13 November 2025
Planning authority decision date
25 June 2025
Appeal decision date
17 March 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
86024
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29