Appeal 6001509

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

demolition of modern extension to stables, metal fire escape and construction of single storey rear extension, internal alterations, insertion of dormer in rear roof plane and external alterations without complying with a condition attached to planning permission [name]/23/002028/FUL, dated 28 September 2023.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is whether the proposed reworded condition meets the six tests set out in paragraph 57 of the National Planning Policy Framework 2024 (the Framework).

  3. Section 04

    Reasons

    [site address] is a [name] listed building used as a public house with restaurant and hotel letting rooms. It occupies a prominent position to the west of the B2138 within the village of Fittleworth and the Fittleworth Conservation Area, as well as being located within the South Downs National Park.

    The main public house building is a 2-storey structure fronting the street. Behind it are two curtilage-listed single storey buildings, referred to as the Barn and the Stables, which are accessed via the rear courtyard.

    Planning permission [name]/23/002028/FUL (the original approval) granted permission for alterations and extensions to the main public house building, including a rear extension to increase the kitchen area, internal alterations to the bar, and changes to the letting rooms and staff living accommodation.

    It also granted permission for works to the rear courtyard barn and stable block buildings, including the removal and replacement of their roofs. The condition the subject of this appeal sought to ensure that appropriate tiles are used for these roofing works.

    At the time of approval, the Council envisaged that this would comprise re-using the existing tiles wherever possible, and that the details of any tiles needed to make up any shortfall would need to be approved by the council prior to the start of the roof re-tiling works.

    The development the subject of the original approval was completed in September

    This has included the re-tiling of the barn and stable roofs without using any of the roof tiles which were in place on these buildings at the time of the determination of the original application.

    The appellant states that having carefully removed and inspected the existing roof tiles, most of them were found to be unsuitable or incapable of beneficial re-use. As such, the appellant considers that this would have made their re-use both impractical and of no aesthetic benefit.

    The appellant’s stated reason for the change of wording of condition 13 is to allow all tiles to be replaced with new high quality handmade tiles, subject to the Council’s agreement. The appellant considers that this comprises a more sensible and flexible re-wording of the condition to facilitate agreement of acceptable tile materials by the Council.

    The application which is the subject of this appeal did not specifically seek approval of the details of the proposed roofing materials and the Council’s reason for refusal does not refer to their acceptability or otherwise. It is on this basis that I have determined this appeal.

    I have borne in mind the statutory duties contained in sections 16, 66 and 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990, as well as the purposes of a national park designation. However, in this case, there is no requirement as part of my determination of this appeal for me to consider the merits or otherwise of the existing roofing tiles.

    The appellant suggests the following wording: ‘Where possible the reclaimed tiles from the roof of the barn and stable shall be reused. A sample of the roof tile required to make up any shortfall shall be submitted to and approved by the Local Planning Authority prior to re-tiling commencing. In the event that insufficient original tiles are capable of beneficial re-use, all tiles will be replaced with hand-made tiles. Samples of the hand-made roof tiles shall be submitted to and approved by the Local Planning Authority prior to re-tiling commencing. Once approved the works shall be carried out in strict accordance with the approved details’.

    Paragraph 57 of the Framework states that conditions should be kept to a minimum and only imposed where they are necessary, relevant to planning and to the development to be permitted, enforceable, precise and reasonable in all other respects.

    The Planning Practice Guidance (the Guidance) refers to these as the ‘six tests’, and states that each of them needs to be satisfied for each condition that a planning authority (or, by extension, an Inspector) intends to apply. The Guidance also advises that any proposed condition which fails to meet one of these tests should not be used, even if an applicant suggests it.

    Neither main party has disputed that the originally worded condition meets these tests, and based on the evidence before me, I have no reason to disagree.

    The appellant’s proposed wording of the condition is not substantially different to that of the original wording. Both conditions allow for the possibility that reclaimed tiles from the barn and stable roofs could not be used, and for the details of any proposed alternative tile to make up the shortfall to be submitted to and approved by the Council prior to the start of the re-tiling of the roofs.

    However, the proposed condition goes further to state that if there are insufficient original tiles capable of beneficial re-use then all tiles will be replaced with hand-made roof tiles.

    I find that, since the original condition does not preclude the re-tiling of the roofs without using any of the original tiles, the proposed wording merely introduces an additional requirement that the tiles used should be hand-made.

    Since the original wording of the condition gives the Council control over whether to accept the details of any alternative tiling to that which was originally present on the buildings, I find that it is not necessary to amend the condition to stipulate that the tiles should be hand-made. In the eventuality that this is what the Council considers to be most appropriate, the original condition would allow for this.

    Accordingly, I find that, having regard to the requirements of the condition and the reasons for its imposition, the appellant’s proposed revision is not necessary.

    The Council’s view is that the proposed condition would not meet the tests of enforceability, precision and reasonableness as set out in paragraph 57 of the Framework because the works have already taken place and none of the original tiles remain on the roofs of the barn and stable buildings.

    The appellant’s proposed wording requires the proposed alternative tiles be approved prior to re-tiling commencing. Given that the re-roofing works have subsequently taken place since the grant of the original permission this would no longer be appropriate, and an alternative timescale would be required. The appellant’s view is that this matter could be dealt with by the removal of this part of the revised condition.

    However, conditions that require the approval of details must specify when the information should be submitted to the planning authority, otherwise, the condition will be unenforceable. In retrospective cases, such conditions must be adapted to set a timetable for action, and a ‘sanction’ for non-compliance to be enforceable.

    With all the above in mind, I find that it is not necessary to replace the existing condition with that proposed by the appellant. I also find that the proposed wording would not meet the paragraph 57 test of enforceability.

  4. Section 05

    Conclusion

    For the above reasons, I therefore conclude that the condition should be retained as originally worded and that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 625No official casework-database value to compare
    Extracted decision date · page 1
    28 January 2026Matches the official casework database
    Extracted site visit dates
    6 January 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001509
Application reference
SDNP/25/00433/CND
Lead case reference
Not recorded
Planning authority
South Downs
Planning authority code
E26000010

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Removal or Variation of Conditions
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
200 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Yes
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
6 November 2025
Valid date
6 November 2025
Start date
10 November 2025
Planning authority decision date
12 May 2025
Appeal decision date
28 January 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
83452
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21