Skip to main content
Official casework recordDismissedCurrent release

Appeal 6001552

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

for conversion, alteration and extension of former barn building to provide two dwellings (use class C3) with associated car parking and landscaping.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    In the banner heading above, I have removed reference to ‘retrospective planning application’ from the description of development as it is not relevant to the act of development. Works of conversion, alteration and extension of the appeal property have been started but not completed. I observed on my site visit that there are differences between the proposed plans and the first-floor windows which have been installed on the northwest elevation of the rear extension. Accordingly, I have dealt with this appeal based on the proposed plans before me, and on which the Council made its decision.

    A revised version of the National Planning Policy Framework (the Framework) was published for consultation during the course of this appeal. Having regard to its content and the nature of the disputed matters, I am satisfied that no prejudice would arise to either party by proceeding to issue this decision without seeking comments.

    The appeal site is within the Green Belt. The Council has assessed that the proposed extension and alterations would not result in disproportionate additions over and above the size of the original building, and accordingly it does not constitute inappropriate development in the Green Belt. Based on the evidence before me, I have no reason to form a different view.

    An amended Site Plan was submitted during the planning application which demonstrated that sufficient car parking could be accommodated on site. Consequently, the Council has confirmed that the second reason for refusal cited on the Decision Notice has been withdrawn.

  3. Section 04

    Main Issue

    The main issue is the effect of the development on the character and appearance of the host building and the surrounding area.

  4. Section 05

    Reasons

    The appeal property (‘the barn’) is a traditional agricultural barn built of local gritstone with a pitched slate roof, which would have comprised a relatively low linear plan form sited alongside [site address] . It forms part of a small cluster of houses and agricultural buildings to one side of the lane, but the wider surrounding area is rural in character predominantly comprising open farmland with scattered houses, hamlets and farmsteads.

    The ‘[name] Planning Document’ (2018) (SPD) advises that an old building will have features and detailing that cannot easily be rebuilt today, alterations need to be undertaken with care and insensitive changes can easily spoil a building.

    Traditional barns have often been adapted and extended to respond to changing farming practices, and the two-storey extension does not project further from the original rear elevation of the barn than the single-storey lean-to extension it replaces. However, it has been designed with a relatively shallow asymmetric dual-pitched roof with a central valley, which reads as a double rear facing gable. I appreciate the extension allows two first-floor bedrooms to be accommodated, but the dual-pitched roofline appears contrived with the ridgeline awkwardly positioned just above the eaves of the original roof, obscuring part of its simple pitched form.

    Moreover, in conflict with SPD paragraph 5.5, in combination, the width and height results in the extension appearing substantial in size and massing, and it unduly dominates the rear elevation. The gabled design exacerbates this and gives the extension a vertical emphasis, which is at odds with the scale and relatively low linear form of the rear elevation of the host barn.

    The low eaves height means that from the north-east on [site address] , the flank (north-east) elevation of the rear extension appears a proportionate addition to the existing two-storey gable. However, I observed the extension to be highly visible and prominent from the public footpath which runs to the side and rear of the barn. From here, in conflict with paragraph 5.15 of the SPD, and notwithstanding the use of traditional materials, fenestration details and proportions, the rear elevation is no longer clearly recognisable as a former barn. The double gable of the extension appears a distinctly domestic addition which is to the detriment of the surrounding agricultural vernacular, and the rural character and appearance of the area. The proposed timber boundary fencing would not sufficiently screen the rear elevation from these public views, even if the footpath is not well used.

    The mono-pitch roof of the single storey extension to the south-east (front) elevation has low eaves and continues the pitch of the original roof. It has been constructed in reclaimed sandstone, with stone corner quoins. The front extension, including the recessed roof below a first-floor window, is prominent when travelling in either direction along [site address] . Nevertheless, it appears a modest and sympathetic addition to the barn which does not detract from its agricultural vernacular, or the wider rural character of the area.

    However, for the reasons I have given above, I conclude that the two-storey rear extension would cause significant harm to the character and appearance of the host building, and the surrounding area. In addition to the conflict with the SPD, it would conflict with policies S1, EQ3 and EQ6 of the High Peak Local Plan (2016). Together, these seek to ensure high quality, locally distinctive design, require development to contribute positively to an area’s character in terms of scale, height and appearance, and that the reuse of buildings does not have an adverse impact on the character and appearance of the countryside.

  5. Section 06

    Other Matters

    The appellant refers to the absence of objections from the Parish Council or other interested parties, but this does not in itself mean an absence of harm.

  6. Section 07

    Planning Balance and Conclusion

    The delivery of two family-sized dwellings would make a small but valuable contribution to local housing supply, and the development would make effective use of land through the conversion of an otherwise under-utilised building, utilising embodied energy. Moreover, it is acknowledged that a shortage of housing can be a barrier to accessing job opportunities, particularly in rural areas. There would also be a wider economic benefit to the area in terms of job opportunities created during further construction work, through the supply of materials and spend in the local economy. Despite the small scale of the development, I afford these benefits moderate weight.

    No other objections have been raised by the Council in respect of car parking or adverse impacts to neighbouring properties. The proposed dwellings would also meet the minimum gross internal floor area set out in the ‘Technical housing standards – nationally described space standard’ (2015). However, these are neutral matters which do not weigh in favour of the proposal. Similarly, meeting the energy requirements of Building Regulations would be a neutral matter.

    I have no persuasive evidence before me to demonstrate that the proposed development would deliver meaningful enhancements to wildlife habitat, either through soft landscaping or other measures. Moreover, I note that the bat roosting boxes are recommended in the ‘Bat Mitigation Plan’ as ‘mitigation and compensation measures,’ to account for impacts to existing bat roost features.

    LP policies S1, EQ3 and EQ6 with which the development conflicts accord with the Framework. Therefore, the conflict I have found attracts full weight in this case.

    The Council are unable to demonstrate a 5-year housing land supply. Therefore, paragraph 11d)ii of the Framework is engaged, which states that planning permission should be granted unless any adverse impacts would significantly and demonstrably outweigh the benefits, when assessed against the policies in the Framework taken as a whole, including the key policies cited.

    The development would align with the Framework where it seeks to increase the supply of houses, acknowledging that small-scale development can make an important contribution to meeting the housing requirements for an area, often built out relatively quickly. It would further align with the Framework in so far as it would make effective use of land through the development of an under-utilised building, helping to meet identified needs for housing where land supply is constrained. These matters would attract moderate weight in favour of the scheme.

    The proposal would conflict with the Framework where it seeks to achieve well-designed places recognising that good design is a key aspect of sustainable development and is fundamental to what the planning and development process should achieve. The Framework further requires that development that is not well designed should be refused, and decisions should ensure that development adds to the overall quality of an area and are sympathetic to local character. I give this conflict significant weight.

    I therefore find that the adverse impacts of granting planning permission would significantly and demonstrably outweigh the benefits, when assessed against the policies in the Framework taken as a whole. As a result, the presumption in favour of sustainable development does not apply.

    For the reasons given above, the appeal proposal would conflict with the development plan as a whole and there are no material considerations, including policies in the Framework, that indicate a decision should be taken other than in accordance with it. Therefore, I conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5136No official casework-database value to compare
    Extracted decision date · page 1
    11 February 2026Matches the official casework database
    Extracted site visit dates
    22 January 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001552
Application reference
HPK/2025/0266
Lead case reference
Not recorded
Planning authority
High Peak Borough Council
Planning authority code
E07000037

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
800 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
Yes
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
10 November 2025
Valid date
10 November 2025
Start date
14 November 2025
Planning authority decision date
23 October 2025
Appeal decision date
11 February 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
84214
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29