Appeal 6001557
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
new bungalow.
Section 02
Decision
The appeal is dismissed, and planning permission for new bungalow is refused.
Section 03
Preliminary Matters and [name]
The appeal results from the Council’s failure to determine the application within the prescribed period. There is no formal decision on the application, as jurisdiction over that was taken away when the appeal was lodged. However, I note the assessment and conclusions submitted by the Council during the appeal process, which sets out the refusal reasons it would have used had it determined the application. Accordingly, the main issues for the appeal are:
Whether a safe and suitable vehicular access would be provided,
Whether the proposed development would be capable of complying with the general condition of planning permission set out at paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 (as amended) in respect of
Section 04
[name] (BNG),
The effect of the proposal upon protected species, and
The effect of the proposal upon existing trees, with regard to their ecological and landscape values.
Section 05
Access
The proposal would utilise an existing private access from [address] that is adjacent to a bridge. At my visit I saw that visibility in an easterly direction is very poor for a number of reasons; these include the level of the road, which drops considerably to the east beyond the bridge, the angle of the access lane relative to the road and its very steep gradient at its eastern side, and the brick wall that forms the side of the bridge where it is above the level of the carriageway and close to the carriageway edge.
The Council has concerns about the existing access, which it suggests is significantly substandard. In response, the appellant emphasises the established use of the lane and the access for 4 existing dwellings. Although the access exists, no case is made to demonstrate that a safe and suitable vehicular access could be achieved for the proposed dwelling by providing details of visibility splays. It is in any case apparent from the site visit that without significant and costly reconstruction work, it does not appear to be possible to improve visibility in an easterly direction. The existing layout is unsafe for drivers who are exiting the lane due to the very limited visibility in an easterly direction and for those travelling on [address] who have very limited visibility of vehicles emerging from the lane when approaching from the east.
I accept that the existing access has been used for many years to serve the existing dwellings and in the time that the appellant has lived at the site no accidents are recalled. Furthermore, the vehicle movements associated with a single dwelling would be relatively low. However, increasing the number of dwellings that utilise this access from 4 to 5 would constitute a significant change. Assuming the households all have similar levels of car use this would represent a 25% increase in vehicle movements for an access that is significantly substandard for the reasons given.
Whilst the [name] (LHDG) states that a private drive can serve up to 5 dwellings, it provides several requirements that do not appear to be satisfied by the proposal. These include a requirement for a minimum width of 5 metres to allow for refuse vehicles for private drives that are over 25 metres.
I accept that it is sometimes possible to develop alternative solutions to address these matters, such as addressing the risk that would arise from the difficulty of accessing the dwelling in the event of a fire by enhancing fire protection through the installation of a sprinkler system. However, this does not address the basic and fundamental inadequacy of the existing access, at the point where the lane connects to [address]. The proposal would result in its increased use, which would harm highway safety.
In summary, the submissions do not demonstrate that a safe and suitable vehicular access would serve the proposed dwelling. The proposal would be contrary to Policy IF4 of the North West Leicestershire Local Plan 2021 (LP), Paragraphs 115 and 116 of the National Planning Policy Framework (Framework) and the LHDG, which together seek to ensure that development proposals incorporate safe and suitable access, and that development is refused on highways grounds if there would be an unacceptable impact on highway safety.
Section 06
BNG
The submitted [name] Report1 states that it is not possible to deliver the necessary 10% BNG within the site. It recommends exploring off-site habitat compensation options, such as purchasing the biodiversity units from a third-party habitat bank. There is nothing before me to demonstrate that this has been considered further. 1 [name] P2750_01
Additionally, the Planning Practice Guidance refers to the potential need for a planning obligation to secure either significant onsite habitat enhancements or offsite gains for the development. This also has not been addressed.
On this basis it is not possible for me to ascertain whether the proposed development would be capable of complying with the general condition of planning permission set out at paragraph 13 of Schedule 7A of the Town and Country Planning Act 1990 (as amended) in respect of BNG. It would therefore not accord with Policy En1 of the LP or Paragraph 187 of the Framework, insofar as they seek to ensure that development proposals provide net gain for biodiversity.
Section 07
[name]
The proposal would result in the loss of trees at the site. There is nothing before me to demonstrate that the trees have been assessed for their suitability to support roosting bats.
Regulation 9(3) of the Conservation of Habitats and Species Regulations 2017 (as amended) (The Regulations) requires a competent authority to have regard to the requirements of the associated Directive so far as it may be affected by the exercise of its functions. This includes any proposal that might lead to the deterioration or destruction of the breeding sites and resting places of [name] (EPS) under Article 12(1). This includes bats and the places that they roost.
Paragraph 99 of the 2005 Circular2 states that it is essential that the presence or otherwise of protected species, and the extent that they may be affected by the proposed development, is established before the planning permission is granted, otherwise all relevant material considerations may not have been addressed in making the decision. The need to ensure ecological surveys are carried out should therefore only be left to coverage under planning conditions in exceptional circumstances, with the result that the surveys are carried out after planning permission has been granted. There are no exceptional circumstances in this case.
In summary, the information before me relating to the potential for the proposal to impact upon EPS is insufficient. I cannot therefore be confident that the proposal would satisfy the requirements of Policy En1 of the LP, the 2005 Circular and The Regulations insofar as they seek to ensure that development proposals do not harm protected species.
Section 08
Trees
The submitted Tree Survey3 suggests that two trees at the appeal site are category A trees. Information before me relating to tree impacts is limited. It would appear to be the case that these trees would either need to be felled or that they would be severely compromised if retained, with likely future pressure for their felling because of their proximity to the dwelling. There is nothing to show how they have been accounted for in the design of the proposal. 2 Office of the [name] 06/2005: Government Circular: Biodiversity and Geological Conservation – [name] and their impact within The Planning System 3 Tree Survey for [site address] Coalville 21st January 2025
The trees are sizeable. The oak is recorded as semi-mature and the hornbeam as early-mature, and both have the potential for significant further growth. They are visible in the wider area that includes the adjacent bowling green and public open space, and thus contribute to the area’s character and appearance. As a result, their loss would cause some visual harm. In addition, there would be an ecological impact arising from the loss of the trees, owing to their habitat value.
In summary, the proposal would have a harmful impact on existing trees. It would thus not accord with Policy En1 of the LP insofar as it seeks to ensure that new development retains existing ecological features.
Section 09
Other Matters
The proposal would deliver a dwelling. In the context of the Government’s objective to significantly boost the supply of homes this is a matter that weighs in favour of the proposal. There would also be a modest economic benefit from the construction work and from future occupants as they make use of existing services and facilities. The proposal would however be contrary to the development plan for the reasons given, and the benefits identified are insufficient to outweigh this position.
The Council had previously considered a similar proposal at the site, which was withdrawn before it made its decision. The appellant was invited by the Council to resubmit the proposal in a different form, with the advice given that planning matters will need to be satisfied. Some of the issues that the Council has raised in respect of the appeal proposal were not raised previously. I appreciate that this is frustrating for the appellant. It is however important that I determine the proposal before me on its own merits. The Council’s position in respect of the appeal proposal was set out clearly in its statement, and the appellant had opportunity to respond to these in his final comments. Following my assessment of the proposal I have reached clear findings on all the main issues, and I am not convinced that the lack of previous comments on some of these matters, including the proposal’s impact on highway safety, should cause me to reach an alternative view.
Section 10
Conclusion
For the reasons given, the appeal should be dismissed and the application refused.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 77No official casework-database value to compare
- Extracted decision date · page 1
- 16 February 2026Matches the official casework database
- Extracted site visit dates
- 14 January 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6001557
- Application reference
- 25/00485/FUL
- Lead case reference
- Not recorded
- Planning authority
- North West Leicestershire District Council
- Planning authority code
- E07000134
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- not_received
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 211 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 10 November 2025
- Valid date
- 10 November 2025
- Start date
- 17 November 2025
- Planning authority decision date
- 22 May 2025
- Appeal decision date
- 16 February 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 84448
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29