Appeal 6001620
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of timber decking (retrospective).
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
This appeal relates to a timber decking platform at [site address] , positioned to the rear of this property and projecting riverward of the existing flood defence wall along the [name]. A similar structure has been installed at the neighbouring property [address], which is the subject of a separate appeal.
The development subject to this appeal has already been carried out. A number of drawings and technical documents were submitted with the application, including plans showing the position, extent and construction of the decking. For the avoidance of doubt, I have determined the appeal on the basis of the submitted drawings, flood risk assessment (‘FRA’) and the additional flood‐risk information submitted at appeal stage.
Section 04
Main Issue
The main issue is whether the development is acceptable having regard to flood risk.
Section 05
Reasons
The appeal site lies within [name] 3b, the functional floodplain of the [name]. A concrete flood‐defence wall runs along the riverbank, and the decking is fixed directly over this structure.
The National Planning Policy Framework (‘the Framework’) requires development to be steered away from areas of highest flood risk. Where development is proposed in such locations, it must be demonstrated that it would be safe for its lifetime and would not increase flood risk elsewhere.
The Planning Practice Guidance (‘PPG’) explains that even small‐scale development can generate significant flood‐risk impacts where it affects a watercourse, the functional floodplain or flood‐defence infrastructure, or where it may impede access to such assets or contribute cumulatively to increased risk. It also emphasises that the functional floodplain must remain unobstructed so that water can flow and be stored during flood events. Development in [name] 3b therefore requires a proportionate, site‐specific Flood Risk Assessment (‘FRA’), and one has been submitted.
The appellant contends that the decking should be regarded as water‐compatible development. However, in practice it functions as private residential amenity space and operates as an extension of the domestic garden. Although it projects over the flood wall, its purpose remains wholly private and domestic, bearing limited resemblance to the open, water‐related recreational activities envisaged within the water‐compatible category. The Environment Agency’s classification of the proposal as “more vulnerable” is consistent with Annex 3 of the Framework, which identifies residential uses within that vulnerability class. Development of this nature is therefore not appropriate within [name] 3b, where national policy restricts new development to water‐compatible uses and essential flood‐risk management infrastructure.
Even if the decking were considered water‐compatible, it must still be shown that it would remain safe during flooding and would not impede flows, reduce floodplain storage or increase flood risk elsewhere.
The appellant relies on estimated levels and modelling from 2015 rather than the updated 2024 dataset. The EA disputes the accuracy of these assumptions and considers that the decking may not sit above the relevant design flood level. Without surveyed levels and modelling aligned with current data, I cannot be satisfied that the structure meets the required tests.
Behaviour‐based mitigation, such as avoiding use during flood alerts, does not address the physical presence of the structure within the channel. National policy requires demonstration of no increase in flood risk, not simply reduced exposure to it.
The decking lies riverward of the flood wall, within the active channel. Its supporting piles introduce a physical obstruction. [name] 3b, even small structures can influence flow conveyance, turbulence and debris movement, and the PPG confirms that development affecting a watercourse or flood‐defence asset can generate significant flood‐risk impacts.
The fact that the deck soffit sits above typical river levels is not determinative. [name] 3b is defined by design flood events, and EA evidence indicates that the pile shafts would be located within the active flow zone during flooding. Without reliable level data and up‐to‐date modelling, it cannot be demonstrated that the structure would avoid impeding flows or reducing floodplain storage.
Although the decking is slatted, debris accumulation and temporary blockage remain plausible during high‐energy flood events. Such effects can alter flow paths, raise local water levels or redirect hydraulic energy towards the flood‐defence wall. In the absence of hydraulic analysis addressing these risks, the potential for increased flood risk elsewhere cannot be ruled out.
The PPG encourages a pragmatic approach to minor development, but only where it does not affect a watercourse, floodplain or flood‐defence infrastructure. Here, the decking is located within the river channel itself and attached to a flood‐defence wall. In such circumstances, the PPG’s pragmatic approach does not override the strict policy requirements for development in [name] 3b.
For the above reasons, it has not been satisfactorily shown that the development is acceptable with regard to flood risk. As such, this fails to satisfy Policy LP12 of the Wandsworth Local Plan (Adopted 2023) (‘LP’), as it introduces built form within the functional floodplain without demonstrating that it would remain safe during flooding, avoid impeding flows, or ensure that flood risk would not be increased elsewhere. In addition, by being fixed directly to the flood defence wall, the decking does not accord with LP Policy LP59, which seeks to safeguard and maintain flood defence infrastructure.
Section 06
Other matters
I observed other similar platforms along this stretch of the river, and it is argued that refusing permission in this case would be inconsistent. However, there is no evidence that those structures were granted planning permission or assessed against current flood‐risk policy. As such, their presence does not justify permitting development that would otherwise be unacceptable.
Section 07
Conclusion
For the above reasons, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 196No official casework-database value to compare
- Extracted decision date · page 1
- 14 April 2026Matches the official casework database
- Extracted site visit dates
- 17 February 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6001620
- Application reference
- 2025/2867
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Wandsworth
- Planning authority code
- E09000032
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 155 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 11 November 2025
- Valid date
- 11 November 2025
- Start date
- 12 November 2025
- Planning authority decision date
- 16 October 2025
- Appeal decision date
- 14 April 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 87344
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29