Skip to main content
Official casework recordAllowedCurrent release

Appeal 6001630

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

roof conversion into habitable space to serve as additional floor area to [site address] , [site address] , the addition of a rear dormer and the installation of front roof lights.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for conversion of loft space involving a dormer extension at rear, rooflights to front roofslope, rooflight and solar panels to flat dormer roof and removal of a rear chimney at [site address] in accordance with the terms of the application, Ref DM2025/00900, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing nos PLN 01 [name], PLN 02 [name], PLN 03 [name], PLN 04 Works Section A-A Existing, PLN 05 [name], PLN 06 [name], PLN 07 [name], PLN 08 [name], PLN 09 [name], PLN 10 Works Section A-A Proposed and PLN 11 [name] – Block Plan.

    The external materials of the extension hereby permitted shall match those used in the existing building.

    The development hereby permitted shall be carried out in accordance with the provisions of the approved [name] prepared by [name].

    Construction works shall take place only between 0800 and 1800 on Monday to Friday, 0800 to 1300 hours on Saturday and shall not take place at any time on Sundays or on Bank or Public Holidays.

  2. Section 03

    [name]

    Notwithstanding the description of development set out above, which is taken from the application form, it is clear from the plans and accompanying details that the development comprises conversion of loft space involving a dormer extension at rear, rooflights to front roofslope, rooflight and solar panels to flat former roof and removal of a rear chimney. The Council dealt with the proposal on this basis and so shall I.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the host building and surrounding area.

  4. Section 05

    Reasons

    The appeal property is a semi-detached building which has been subdivided into 3 flats. The property is located within an area which is residential in character and comprises detached and semi-detached dwellings of varying architectural styles, some of which have been altered and extended.

    The appeal property is located within the [address] / [address] Area of Special Local Character (ASLC). The ASLC is a non-designated heritage asset (NDHA) which predominantly consists of late Victorian, early Edwardian semi-detached properties and inter-war housing set on tree-lined streets. The appeal property largely retains its historic form and character and, as such, it contributes positively to the significance of the NDHA.

    The appeal proposal is a roof conversion and rear dormer extension to provide additional bedroom and bathroom space for the first floor flat. The proposed rear dormer would extend to the existing main ridge height. While it would extend the majority of the width of the existing property, it would be inset from the sides of the roof. I am satisfied that the dormer would be sufficiently inset from the flank elevation of the appeal property that it would appear subservient to the existing building. Accordingly, the proposed dormer would be of a suitable scale and massing and would not appear overly large or dominant. Its windows would have a vertical emphasis and balance visually with the windows on the existing property.

    The use of tiles matching the existing roof materials would ensure that the dormer would be an attractive addition to the existing building, responding to the local character and achieving a high standard of design.

    I acknowledge that the dormer would be contrary to the Council’s Design of Residential Extensions Supplementary Planning Document as it would not be set below the ridge of the existing roof. Nevertheless, this document has the status of guidance rather than policy and, as I have reasoned above, I am satisfied that the proposed development would not detract from the character and appearance of the host building.

    Alterations visible from the front elevation of the appeal property would comprise 4 rooflights to the existing roofslope and solar panels located on the flat roof of the rear dormer. These changes would erode the symmetry between the appeal property and its semi-detached neighbour to some degree. However, I observed on site that the properties differ in their elevational and boundary treatments and, as such, do not appear symmetrical. In this context, the proposed changes, which are limited in scale and relate to the roof level only, would not unduly harm the symmetry of the semi-detached pair.

    I observed on site that there are variety of architectural styles present in the immediate vicinity of the appeal property. In addition, I observed that the roof spaces of a number of nearby properties, including those of broadly similar architectural styles to the appeal property, have been converted. I acknowledge that the nearby roof conversions and dormer extensions may have been undertaken using Permitted Development (PD) rights, over which the Council has limited control. Nevertheless, as a result of these works, rear dormers and rooflights on front roofslopes now form part of the character of the area. From my observations on site, they do not detract from the character and appearance of the NDHA.

    In this regard, the proposed development would not appear incongruous. It would conserve the character and appearance of the NDHA. Therefore, I consider that the proposal would not cause harm to the significance of the NDHA.

    Taking account of the above, I conclude that the proposed development would not have a harmful effect on the character and appearance of the host building and surrounding area. As such, the proposal accords with the relevant provisions of Policies 28 and 30 of the Sutton Local Plan 2016-2031. These policies, among other matters, seek development which respects the local context, responds to local character and heritage assets and conserves and, where practicable, enhances elements which contribute to an ASLC’s particular character or appearance.

  5. Section 06

    Conditions

    To meet legislative requirements, I have imposed a condition to address the period for commencement. Conditions requiring compliance with the submitted plans and [name] are also necessary for reasons of certainty.

    A further condition requiring the materials to match those of the existing building is necessary, in the interests of safeguarding the character and appearance of the area.

    A condition limiting working hours is necessary to protect the living conditions of the occupiers of neighbouring properties during construction.

  6. Section 07

    Conclusion

    For the reasons given above, the proposed development complies with the development plan as a whole. As there are no material considerations which would justify determining the proposal other than in accordance with the development plan, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5480No official casework-database value to compare
    Extracted decision date · page 1
    10 February 2026Matches the official casework database
    Extracted site visit dates
    21 January 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001630
Application reference
DM2025/00900
Lead case reference
Not recorded
Planning authority
London Borough of Sutton
Planning authority code
E09000029

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
467 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
12 November 2025
Valid date
12 November 2025
Start date
27 November 2025
Planning authority decision date
26 August 2025
Appeal decision date
10 February 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
84158
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29