Skip to main content
Official casework recordDismissedCurrent release

Appeal 6001771

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the change of use of land from Gypsy pony trotting ring and agricultural land to Gypsy and Traveller site for ten pitches.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Applications for costs

    An application for costs is made by [name], [name] against North Somerset Council. That application is the subject of a separate decision.

  3. Section 04

    [name]

    The main issues are: • The effect of the development on highway safety, and • The acceptability of the development with regard to flood risk.

  4. Section 05

    [name]

    The proposed development would be accessed directly off the A370 road. I observed this to be a busy section of highway which accommodated a high volume of traffic. In addition, the point of access is located along a section of road that is subject to a fifty miles per hour (mph) speed limit.

    [name] am conscious that the access point already serves a development comprising of gypsy traveller pitches, the proposed scheme would result in a significant number of new pitches and there would be an increase in vehicle movements associated with these. The scheme includes no assessment of the existing traffic movements that are associated with the access point, or the number of movements that would be added by the proposed development. However, in my view the addition of 10 new pitches could result in a substantial number of additional traffic movements.

    [name] note that there has been no objection from the highway authority, and that the report to the planning committee recommended that the access arrangements were acceptable, I consider that there is a lack of information to show that the access arrangements associated with the development would be safe.

    I observed that at various other accesses along this stretch of road there were dedicated turning lanes within the highway, which enabled vehicles to be clear from the running flow of traffic whilst waiting to cross the flow of traffic from the opposite direction. There would be no such facility to accommodate vehicles turning right into the access to the proposed development. Given the position within a 50-mph speed limit, together with the high volume of traffic that uses this road, there is significant potential for waiting vehicles to cause obstruction to the highway with obvious risks to highway safety.

    My view in this respect is reinforced by a previous appeal decision1 at this location, where an Inspector considered the acceptability of the access to accommodate a development consisting of storage containers. In that case, there was a lack of information showing that the number of traffic movements would be acceptable, as well as that a turning lane could be accommodated. [name] note the differing nature of the proposals in these cases, this nonetheless demonstrates that there has been concern over the number of traffic movements and the positioning of stationary vehicles, waiting to manoeuvre, within the highway.

    My attention is drawn to an extant planning permission at the site for a pony trotting ring and it is contended that this use could attract additional traffic movements in any event. However, there is no meaningful comparison to show that the traffic that would be generated by this authorised use would be comparable to that generated by the development now proposed. Furthermore, there is no detail on the frequency of the use of the trotting ring to form a basis for comparison. Therefore, this matter does little to persuade me that the access arrangements would be safe.

    When considering the specific appeal proposal, there is no substantive information before me to show that there would not be a detriment to highway safety, along a busy and fast-moving section of highway, as a result of the development.

    Therefore, there is insufficient information to show that the development would not conflict with policy CS10 of the [name] (adopted January 2017 (the [name]) and policy DM24 of the [name] and Policies Plan (adopted July 2016). Together, and amongst other things, these policies seek to ensure that development improves the transport network and does not prejudice highway safety.

    Paragraph 170 of the National Planning Policy Framework (the Framework) states that inappropriate development in areas at risk of flooding should be avoided by directing development away from areas at highest risk (whether existing or future). Where development is necessary in such areas, the development should be made safe for its lifetime without increasing flood risk elsewhere. Policy CS3 of the [name] states that development within flood zones 2 and 3 will only be permitted 1 APP/D0121/W/17/3179037 where it has been demonstrated that it complies with the sequential (ST) and exceptions (ET) tests as set out in the Framework.

    The site lies within flood zone 3a as defined by the Environment Agency flood maps, which is an area that is at a high probability of flooding. The development comprises gypsy traveller pitches which would accommodate mobile homes and as such the development falls within the highly vulnerable flood risk classification.

    In respect of the ST, the appellant has produced their own ST which is limited only to the area of the existing gypsy traveller site adjacent to the appeal site. This is an overly restrictive approach and given the district wide shortage of gypsy traveller pitches, the ST should cover the area of the entire district. That being said, the council accepts that sites at a lower risk of flooding, which are available for gypsy traveller pitches, are extremely limited across the district. It also accepts as a matter of common ground that there are no sequentially preferable sites that are available at the present time. There is nothing before me that would lead me to disagree with this position. As such, despite the limited scope of the appellant’s ST, the ST is nonetheless passed in this case.

    This then leads on to consideration of the ET. The Planning Practice Guidance outlines that for the ET to be passed it needs to demonstrate that: • development that has to be in a flood risk area will provide wider sustainability benefits to the community that outweigh flood risk; and • the development will be safe for its lifetime taking account of the vulnerability of its users, without increasing flood risk elsewhere, and, where possible, will reduce flood risk overall.

    The chief public benefit of the proposed development would be the contribution towards the provision of gypsy traveller accommodation, where there is already an acknowledged shortfall in provision. The Council’s Committee Report outlines that the most recent Gypsy and Traveller Accommodation Assessment was completed in June 2022, and this identified a need for 114 gypsy traveller pitches up to 2042. There has been some progress in providing pitches, but this has been small in comparison to the need. Furthermore, there are no present allocations for sites within the current development plan. On this basis, there is undisputedly a significant unmet need for sites and thus the contribution that the scheme would make would be a significant benefit.

    The main part of the appeal site that would accommodate the residential units has been the subject of historic land raising and as a consequence would lie above the flood level in the defended 1 in 200-year (including an allowance for climate change) scenario. There would be some risk to the main part of the site after 2118, in the undefended scenario, but this would result from flood defences being breached or overtopped. However, given the distance of the site from the coast and the time inundation would take, there would be warning of such an event, and measures could be put in place to address this, reducing the risk substantially.

    In my view therefore, the wider sustainability benefits of the development would outweigh the overall flood risk, and given the levels of the site, distance from the coast and that measures could be secured by planning condition, the development would be safe. There is no suggestion that the development would increase flood risk elsewhere. Accordingly, the ET is also passed in this case. The development would therefore accord with the provisions of the Framework and the development plan policies as outlined above.

  5. Section 06

    Planning Balance

    The Council is unable to demonstrate a five-year supply of deliverable pitches and thus the provisions of paragraph 11(d) of the Framework are engaged.

    [name] have found that the scheme would be acceptable in terms of flood risk matters, I have found that there is insufficient information before me to enable me to conclude that the development would not be harmful to highway safety at this location. I have had regard to the benefits of the scheme, most notably the contribution towards the provision of gypsy traveller pitches where there is an acknowledged shortfall, as set out above, together with the social benefits that this would deliver.

    In this case, I find that the potential harm to highway safety, along what is a busy and well used highway, significantly and demonstrably outweighs the benefits. Thus, the balance falls against the proposal and the appeal should not be determined other than in accordance with the development plan.

    The development would provide accommodation for gypsy travellers, who share the protected characteristic of race for the purposes of the Public Sector Equality Duty under s149 of the Equality Act 2010. This sets out the requirement to have due regard to the need to eliminate discrimination and advance equality of opportunity between persons who share a relevant protected characteristic and persons who do not. The harm that I have identified would outweigh the benefits in terms of advancing equality.

  6. Section 07

    Conclusion

    For the reasons given above, and having regard to all matters raised, I conclude that the proposal would conflict with the development plan as a whole and there are no material considerations that indicate a decision should be taken otherwise than in accordance with it.

    Therefore, the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 192No official casework-database value to compare
    Extracted decision date · page 1
    3 June 2026Matches the official casework database
    Extracted site visit dates
    14 April 2026 (page 1)
  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 192No official casework-database value to compare
    Extracted decision date · page 1
    3 June 2026Matches the official casework database
    Extracted site visit dates
    14 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001771
Application reference
24/P/0143/FUL
Lead case reference
Not recorded
Planning authority
North Somerset Council
Planning authority code
E06000024

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Not Applicable
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
2,000 m²
Number of residences
10
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
17 November 2025
Valid date
17 November 2025
Start date
21 November 2025
Planning authority decision date
23 October 2025
Appeal decision date
3 June 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
89748
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29