Skip to main content
Official casework recordAllowedCurrent release

Appeal 6001795

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

1 x No. new dwelling.

  1. Section 02

    Decision

    The appeal is allowed and permission in principle is granted for 1 x No. new dwelling at Marbrick, [address], Garstang, Preston [postcode] in accordance with the terms of the application, Ref 25/00496/PIP.

  2. Section 03

    Applications for costs

    An application for costs has been made by [name] (the appellant), against Wyre Council. This application is the subject of a separate application.

  3. Section 04

    Preliminary Matters

    The proposal is for permission in principle. Planning Practice Guidance (PPG) advises that this is an alternative way of obtaining planning permission for housing-led development. The permission in principle route has two stages: the first ‘permission in principle’ stage establishes whether a site is suitable in-principle. The second ‘technical details consent’ stage is when the detailed development proposals are assessed. This appeal relates to the first of these two stages.

    The scope of the considerations for permission in principle are limited to location, land use and the amount of development permitted. All other matters are considered as part of the subsequent technical details consent application after permission in principle is granted.

    An applicant can apply for a range of dwellings by expressing a minimum and maximum net number of dwellings as part of the application. In this instance, permission in principle is sought for one dwelling.

    As part of the appeal process the appellant has provided an indicative layout drawing and an indicative permitted development outbuilding example. I have considered whether accepting the additional information would cause procedural unfairness to interested parties. Due to the indicative nature of the plans, I am satisfied that they do not evolve the scheme. The Council has also had the opportunity to comment on them as part of the appeal process. I have therefore had regard to them and treated them as indicative only.

    The site visit was arranged as an ‘access required site visit,’ although I was not able to proceed on that basis. However, I was able to consider the main issues based on seeing the site and its surrounding context from public areas and hence my visit was carried out unaccompanied.

  4. Section 05

    Main Issue

    The main issue is whether the site is suitable for residential development, having regard to its location, the proposed land use and the amount of development.

  5. Section 06

    Reasons

    The appeal site is in a residential area of mixed character. [address] is a narrow cul-de-sac with a relatively enclosed and somewhat constrained character, formed by a row of modest bungalows on one side and a continuous line of tall timber fencing on the other. The fencing defines the rear boundaries of a uniform terrace of dwellings that front [address]. To the north beyond the appeal site are the consistent rows of two-storey dwellings on [address], together with the intervening space separating those properties from the similarly regimented houses fronting Garstang bypass Road.

    The appeal site is enclosed on all sides by close-board fencing, and at its rear is a summerhouse style structure. It contributes to the character of the area, as it provides a sense of space above fence level, between the uniform rows of two-storey dwellings, and the bungalows on [address]. The site is most obviously associated with [address], due to the extent of the boundary that aligns with the cul-de-sac turning head. In this street the bungalows are the dominant building type, rather than the dwellings on [address], which are set far back behind their fencing.

    The development would be for one dwelling, and the indicative proposals suggest a true bungalow with two off road car parking spaces. A bungalow would be a development of a lesser height and massing than the uniform rows of two-storey dwellings on [address] and [address]. Given this, and the visual association of the site with [address], a development that does not adhere to the building lines and massing of those two storey dwellings, would not amount to the disruption of the visual continuity of the streetscape.

    It is acknowledged that the site is somewhat constrained in size. However, the existing bungalows on [address] are also modest in scale, and the site is set back behind the turning head. There is therefore potential to retain the character and appearance of this street and respect the character of the dwellings within it, with a dwelling of suitable size and scale.

    The rear windows of [address] and those of [address], which serve their main living accommodation, are orientated obliquely from the appeal site. Their gardens are divided from the site by way of close-boarded fencing. The indicative layout plan, also indicates that it is feasible to set the dwelling away from these boundaries, given my conclusion that a dwelling does not need to adhere to the building line. Moreover, it would be feasible to orientate a modest single storey dwelling in a manner that would not overlook the front facing windows of the directly facing properties on [address].

    The scale and positioning of the proposed dwelling in relation to provision of acceptable living conditions for future occupiers would be a matter for the technical details consent. In figurative terms the garden is likely to be small, however the indicative drawing indicates that the site is capable of providing a functional space for sitting out and hanging washing. It also has the potential for enclosure by fencing to provide privacy.

    The Council’s stance is that gardens should typically be 10.5 metres and they have also referred me to SPG41. However, there is little within this guidance or the Council’s arguments, to persuade me that a dwelling would not be served by a sufficiently private or usable garden space. For example, in the form of a minimum size requirement for the outside space.

    There is no dispute between the main parties that the site is suitable for residential development with regards to land use and location. Given the residential context of the wider area and the site’s position within the settlement boundary, I have no reason to disagree.

    Therefore, I conclude that the site is suitable for residential development, having regard to its location, the proposed land use and the amount of development. As such, the development accords with the relevant provisions of Policy CDMP3 of the Wyre Local Plan2. Amongst other things the policy requires development to respect or enhance the character of an area and not have an unacceptably adverse impact on living conditions of nearby and future occupants. Moreover, development of the site is capable of complying with the relevant provisions of section 12 of the National Planning Policy Framework.

  6. Section 07

    Other Matters

    I note the interested party concerns in relation to the suitability of [address] for additional traffic, taking account of access required for emergency vehicles, refuse collection and postal deliveries. However, this does not form part of the Council’s reason for refusal, and I note that the Highway Authority has no objections to permission in principle for a single dwelling. In addition, whether or not [address] is adopted is a private matter between parties.

    The limited information provided with the appeal application is commensurate with the nature of the permission in principle stage process. The highway aspects are more appropriately determined as part of the technical details consent stage, and there can be no guarantee that just because the permission in principle has been granted, that the technical details consent will follow. At the technical details consent stage, it would be open to the decision-maker to consider specific details of the scheme including means of access, parking and other highways considerations. It takes approval of both stages for a planning permission to be secured. 1 Supplementary Planning Guidance 4, Spacing Guidance for [name] (1998). 2 Wyre Council, Wyre Local Plan (2011-2031) (incorporating partial update of 2022), (January 2023)

  7. Section 08

    Conclusion

    The PPG makes it clear that it is not possible for conditions to be attached to a grant of permission in principle, whose terms may only include site location, land use and amount of development. Therefore, I have not imposed any conditions. Where permission in principle is granted by application, such as this, the default duration of that permission is three years, and there is no justification to vary this period in this case.

    For the above reasons, the proposal accords with the development plan, when read as a whole. Material considerations do not indicate that a decision should be taken other than in accordance with the development plan. I therefore conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Costs Decision

    Extracted inspector · page 1
    Inspector attribution ID 5239No official casework-database value to compare
    Extracted decision date · page 1
    2 February 2026Matches the official casework database
    Extracted site visit dates
    20 January 2026 (page 1)
  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5239No official casework-database value to compare
    Extracted decision date · page 1
    2 February 2026Matches the official casework database
    Extracted site visit dates
    20 January 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001795
Application reference
25/00496/PIP
Lead case reference
Not recorded
Planning authority
Wyre Borough Council
Planning authority code
E07000128

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Minor Dwellings
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Outline
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
258 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
18 November 2025
Valid date
18 November 2025
Start date
19 November 2025
Planning authority decision date
11 July 2025
Appeal decision date
2 February 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Yes
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
83700
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29