Skip to main content
Official casework recordDismissedCurrent release

Appeal 6001820

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

Application for [name] for the proposed conversion of a barn to a dwelling (Class Q).

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Preliminary Matters

    The Town and Country Planning (General Permitted Development) England (Amendment) Order 2024 came into force on 21 May 2024. Transitional arrangements set out in Article 10 of the amending Order applied to applications submitted until the end of 20 May 2025. This appeal relates to the permitted development right as it stood prior to May 2024 and I have determined the appeal on this basis.

    Under Article 3(1) and Schedule 2, Part 3, Class Q of the GPDO planning permission is granted for (a) change of use of a building and any land within its curtilage from a use as an agricultural building to a use falling within use class C3 (dwellinghouses) together with (b) building operations reasonably necessary to convert the building, subject to limitations and conditions.

    [name].1(i) indicates that development is not permitted by Class Q(b) if it would consist of building operations other than the installation or replacement of windows, doors, roofs, or exterior walls, or water, drainage, electricity, gas or other services, to the extent reasonably necessary for the building to function as a dwellinghouse.

    The Council consider that the building operations would go beyond what could reasonably be considered a conversion, and so would not comply with the limitations of Class Q.1(i).

    Based on the submissions of the main parties, there is no reason for me to believe that the other criteria of Class Q are not satisfied. Consequently, there is no need to give them further consideration in this decision.

  3. Section 04

    Main Issue

    In light of the Preliminary Matters above, the main issue is whether the required building operations are to the extent reasonably necessary to carry out the conversion of the building to comply with [name].1(i) of the GPDO.

  4. Section 05

    Reasons

    [name] is generally clad to both sides and rear via a single layer of corrugated sheeting with a corrugated mono-pitch sheeted roof. The front elevation is open and exposed. It is supported by a timber structure mainly comprising circular columns supporting the roof. The floor to the barn comprises compacted earth.

    The GPDO states at paragraph Q.1(i) that development under Class Q(b) is not permitted if it would consist of building operations other than the installation or replacement of windows, doors, roofs or exterior walls, or water, drainage, electricity, gas or other services to the extent reasonably necessary for the building to function as a dwelling house.

    Paragraph 105 of the Planning Practice Guidance (PPG) advises that the right under Class Q assumes that the agricultural building is capable of functioning as a dwelling. However, the PPG is clear that it is not the intention of the permitted development rights to allow rebuilding work that would go beyond what is reasonably necessary for the conversion of the building to a residential use. Accordingly, it is only where the existing building is already suitable for conversion to residential use that the building would be considered to benefit from the permitted development rights.

    Neither the GPDO nor the PPG define the term ‘reasonably necessary’. Consequently, this is a matter of planning judgement based on fact and degree of an individual case. My attention has though been drawn to the Hibbitt judgement 1 which relates to the difference between conversions and rebuilding dealt with under Class Q. This is important because if a development does not amount to a conversion it would fail to be development permitted under Class Q.

    The Hibbitt case suggested that an agricultural building may be so skeletal and minimalist, with only a modest amount of help from the original building, that the works needed to alter it to be used as a dwelling would be of such a magnitude that it would be tantamount to a new build or rebuild as opposed to a conversion. Furthermore, Hibbitt reinforces that it is a matter of planning judgement as to whether the level of works involved would still constitute a conversion.

    A ‘[name] (the Report) and Addendum (Addendum) have been provided by the appellant. The Report and Addendum have been prepared by a structural engineer and involved a visual inspection of the building’s structural elements and fabric. They have generally found the existing structural timbers to be in good structural condition, suitable for conversion, with only minor defects.

    However, and whilst I give significant weight to the Report and Addendum being prepared by a professional structural engineer, they were based upon a visual inspection only, with no unexposed elements of the building being inspected, and no inspection of foundations despite concluding their likely fixing with an unknown 1 Hibbitt and another v Secretary of State for Communities and Local Government (1) and Rushcliffe Borough Council (2) [2016] EWHC 2853 (Admin). cement mix. As such no specific details of the existing foundations have been provided, nor have any structural calculations for the proposed development been prepared demonstrating that the existing structure can support any additional loads from works associated with the new dwelling.

    Although the application details the retention and repair of the existing corrugated steel sheets and some cladding that would be permitted under Class Q, the Report and Addendum also state that due to minor degradation to most purlins, slight deflection was noted. Furthermore, due to exposure to rainfall, timber rafters and sheeting rails are identified as degrading resulting in a weakening where connected to joist hangers. To the south elevation, most of the galvanised sheets have been identified as heavily corroded. The Report identifies the need for all significantly degraded timber elements to be replaced with all external walls repaired with the Addendum stating that ‘It is clear that the existing roof and wall coverings would need to be replaced to provide a weatherproof screen to the building.’

    While the existing structure is identified as being sufficient to support the existing roof, the Report and Addendum state that thermal elements can be supported from an isolated structure independent of the existing structural frame with no load increase. This would be supported from a new concrete slab that would also be independent from the existing main column supports. It would also need to comprise a whole new front elevation that would be a fundamental structural element of the conversion.

    Regardless therefore of the structural integrity of the existing building, the proposal generally comprises a new structure that would be built inside the existing building so that the existing building takes no additional load. While the existing building would be retained, it would be in its partial skeletal and minimalist form and would be generally independent from the original building with roof and wall coverings replaced. As such, I find the works would be of such a magnitude that it would not represent a conversion.

    In light of all of the above, from the evidence before me, and given it is necessary to consider the whole of the works involved in totality, I cannot conclude that the existing building is suitable for conversion to residential use. It has not therefore been demonstrated that the proposal is a conversion with the works going beyond the extent of works that are reasonably necessary for the conversion of the building to a residential use.

    I have had regard to an appeal in Longwick2 drawn to my attention by the appellant where the Inspector accepted the construction of an internal timber frame to support insulation. However, I have limited information in relation to the plans and details for this appeal, but from the information before me, I consider that it differs from the current appeal given that a whole new internal shell is proposed rather than internal walling. Furthermore, I must consider the current appeal on its merits.

    I acknowledge that the PPG advises that internal works are not generally development. However, in this case the works would comprise a new structure independent from the existing building including a whole new front/east elevation. Furthermore, while individually, the works for each of the above identified components to the building may be permissible under the terms of paragraph Q.1(i) of the GPDO, having regard to the scale and nature of the proposed works and 2 APP/K0425/W/22/3294482 established case law, I find that the totality of the works would be tantamount to substantial re-build, as opposed to conversion.

    Accordingly, I am unable to conclude that the required building operations are to the extent reasonably necessary to carry out the conversion of the buildings to comply with [name].1(i) of the GPDO. As such, the proposal does not benefit from the permitted development rights under Schedule 2, Part 3, Class Q.

  5. Section 06

    [name]

    To support the appeal scheme, the appellant has referred to a number of other prior notification decisions3 under [name] of the GPDO, whereby the Council have found the extent of building works proposed to adhere to Q.1(i) of the GPDO. However, I do not have the full context of these decisions including the precise conditions of the relevant agricultural buildings for conversion or the full extent of works involved in each case to be sure that they are directly comparable. In any case, the appeal scheme has been determined on its own merits.

    I note the appellant’s suggestion that the Council’s planning officer has not engaged with a structural engineer to assess the ability for the building to be converted. However, the onus is on the appellant to demonstrate that the appeal building is structurally capable of being converted and that it benefits from the permitted development rights established under Class Q.

  6. Section 07

    Conclusion

    For the reasons given above, I find that the proposal is not permitted development under Schedule 2, Part 3, Class Q of the GPDO. The appeal is therefore dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4181No official casework-database value to compare
    Extracted decision date · page 1
    7 April 2026Matches the official casework database
    Extracted site visit dates
    19 March 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6001820
Application reference
PA25/01803
Lead case reference
Not recorded
Planning authority
Cornwall Council
Planning authority code
E06000052

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Prior Approval
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
358 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
19 November 2025
Valid date
19 November 2025
Start date
2 December 2025
Planning authority decision date
23 May 2025
Appeal decision date
7 April 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
87045
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29