Appeal 6001832
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a 1st floor side and part rear extensions.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the host building and surrounding area.
Section 05
Reasons for the Recommendation
The host dwelling is a semi-detached property situated on a predominantly residential street characterised by pairs of semi-detached houses set back behind front gardens, many of which have been converted to parking areas. The spacing between the pairs of dwellings, combined with the generous setbacks, creates a pleasant and open street scene. There is clear evidence of development along the road, primarily to the rear, including at the host property, which has already benefited from several additions.
At ground-floor level, the existing side projections at both the host property and the neighbouring dwelling (No. 2) currently preserve a sense of separation between the two houses at first floor level. The proposed extension would substantially erode this visual gap. Even though the buildings would not physically connect, the reduced spacing would create the impression of a continuous frontage, shifting the appearance from the established open, semi-detached rhythm of the street toward something more akin to a terraced form.
The host property has been extended several times previously, including a ground-floor side and rear extension, a first-floor rear extension, and a hip-to-gable conversion with a rear dormer. These cumulative alterations have noticeably increased the scale and massing of the dwelling. Introducing further built form Appeal Planning Officer 6001832 would intensify this effect, resulting in a property that appears disproportionately enlarged and overdeveloped.
The neighbouring property, as mentioned by the appellant, features a two-storey side extension however this property sits in a materially different context. As the end property in the row, positioned beside an access lane, it benefits from a more open setting that reduces the visual impact of additional built form. The property has also not been subject to a dormer window or a hip-to-gable extension, meaning it is materially different to the host dwelling of the proposed development. Therefore, the neighbouring example cannot reasonably be used as a direct comparison for the proposed development. Additionally, Policy DMHD1 of the Hillingdon Local Plan: [name] - Development Management Policies (Adopted
(HLP: [name] - DMP) makes it clear that where hip to gable roof extensions exist two storey side extensions will not be supported.
The proposed development would cause harm to the character and appearance of the surrounding area. Therefore, the proposed development would conflict with Policies DMHD1 and DMHB 11 of the HLP: [name] – DMP as well as Policy D3 of the London Plan (Adopted 2021). These policies, amongst other things, collectively seek to ensure new development respects the design of the original dwelling, maintains visual separation between dwellings and protect established street patterns. It would also not comply with paragraph 135 of the National Planning Policy Framework which seeks to ensure that developments that are sympathetic to local character.
Section 06
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 07
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5024No official casework-database value to compare
- Extracted decision date · page 1
- 13 May 2026Matches the official casework database
- Extracted site visit dates
- 10 February 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6001832
- Application reference
- 1142/APP/2025/1826
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hillingdon
- Planning authority code
- E09000017
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 303 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 19 November 2025
- Valid date
- 19 November 2025
- Start date
- 11 December 2025
- Planning authority decision date
- 28 August 2025
- Appeal decision date
- 13 May 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 88704
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21