Appeal 6001945
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
alterations to the second floor living accommodation and building roof to facilitate the sub-division of 1 no. existing dwelling (Class C3) into 2 no. dwellings (Class C3). Installation of dropped kerb and formation of additional parking provision. Part retrospective.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal on the character and appearance of the host dwelling and the surrounding area.
Section 04
Reasons
[address] is a 2-storey semi-detached dwelling occupying a corner plot at the junction of [address] and [address]. The site is located in an established residential area which predominantly comprises 2-storey semi-detached dwellings occupying comfortably-sized plots. Most of the neighbouring properties have not been substantially extended or altered. The uniform nature of these dwellings results in a pleasant and ordered character and appearance to the surrounding area.
The proposal is for the sub-division of No 92 to form 2 dwellings, one of which would be formed within an approved 2-storey side extension1. To the rear elevation 2 flat roof dormer windows are proposed: one within the roof slope of the host dwelling and one within the roof slope of the side extension. The proposal differs from an existing extant planning permission2 which did not include a dormer window over the extension.
There would be a minimal separation between the 2 dormer windows and very little of the roof would be visible between the 2 structures. One of the dormer windows would wrap around the side elevation of the extension. Given this, the dormer windows would read as a single, large dormer window spanning most the width of the extended building. Whilst the dormer windows would be set down from 1 application ref P20/18977/F 2 Application ref P25/00750/HH the ridge and set above the eaves of the roof, given their combined width, box-like form, and projection beyond the roof slope of the side extension, they would appear bulky and incongruous and would dominate the roof, appearing as a discordant addition which would harmfully alter the modest appearance of the appeal property, detracting from the character and appearance of the area..
The proposal would result in harm to the character and appearance of the host dwelling and the surrounding area. Conflict therefore arises with those aims of policy CS1 of the South Gloucestershire Local Plan Core Strategy (2013) (CS) and policies PSP38 and PSP39 of the South Gloucestershire Local Plan Policies, Sites and Places Plan (2017) (LP) which seek to ensure that development is of a high standard of design and does not harm the character and amenity of the area.
Section 05
Other Matters
In support of the proposal the appellant references householder permitted development (PD) rights for additions to the roof of a dwellinghouse, which, it is stated, has resulted in box-like dormer windows becoming a commonplace feature across the country. Be that as it may, the character of the surrounding area isn’t one which has been altered by the presence of dormer windows and there is no particular evidence that dormer windows which might be erected in the area under PD rights in the future would be comparable in scale and form to the appeal proposal or that they would have a similarly harmful effect on the character and appearance of the area.
It is suggested that the smaller dormer window could be erected under PD if the subdivision of the property was approved. However, I have not been directed to an extant permission for the subdivision of the property to give substantial credence to. It is not therefore a PD right which could be realistically implemented if this appeal were dismissed. The main parties agree that the proposal goes beyond the scope of PD. It is therefore necessary to consider its compliance with the development plan. In this case, for the reasons set out above I have found conflict with the development plan in relation to the proposal’s effect on the character and appearance of the host dwelling and surrounding area.
It is noted that the appellant has sought to address the concerns raised by the Council in earlier planning applications3 and by the Inspectors in the related appeal decisions4. Nonetheless, for the reasons identified above, I find that the proposal would have a harmful effect on the character and appearance of the host dwelling and the surrounding area.
Section 06
Planning Balance
The Council has confirmed that it is not able to demonstrate a 5-year supply of deliverable housing sites. As the proposal involves the provision of housing, Footnote 8 of the National Planning Policy Framework (the Framework) indicates the most important policies for determining the appeal are deemed to be out of date and paragraph 11. d) ii. of the Framework is engaged. This requires that permission should be granted unless any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in the Framework taken as a whole having particular regard to key policies 3 Application references P24/02187/HH and P24/02826/HH 4 APP/P0119/D/3360066, APP/P0119/C/25/3361438 and APP/P0119/D/25/3361207 for directing development to sustainable locations, making effective use of land, securing well-designed places and providing affordable homes, individually or in combination.
The proposal would make a small contribution towards housing supply on a small site with good access to facilities and public transport. The 2-bedroom dwelling would contribute to the Government’s objective to significantly boost the supply of homes and would help meet an identified local housing need. This weighs in favour of the scheme and, when factoring in the supply shortfall, attracts moderate and meaningful weight as a scheme benefit.
There would also be short-term economic benefits associated with construction, and in the longer term contributions would be made by future occupiers to the local economy. Given the limited scale of the development and noting that most of the development has already been built, I attach limited weight to the development’s positive contributions in these senses.
On the other hand, I have found that the proposal would result in harm to the character and appearance of the host dwelling and surrounding area. Chapter 12 of the Framework sets out that good design is a key aspect of sustainable development. I give significant weight to the conflict with the development plan policies in this area.
Thus, whilst the Framework seeks to significantly boost the supply of housing, the adverse impacts would significantly and demonstrably outweigh the benefits of the delivery of one dwelling, when assessed against the policies in the Framework taken as a whole. Thus, the proposal would not constitute a sustainable form of development in terms of the Framework and does not benefit from the presumption in favour of sustainable development.
Section 07
Conclusion
The proposal would conflict with the development plan and material considerations do not indicate that the decision should be made other than in accordance with the development plan. Therefore, having regard to all other matters raised, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5070No official casework-database value to compare
- Extracted decision date · page 1
- 24 February 2026Matches the official casework database
- Extracted site visit dates
- 17 February 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6001945
- Application reference
- P25/01753/F
- Lead case reference
- Not recorded
- Planning authority
- South Gloucestershire Council
- Planning authority code
- E06000025
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 629 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 25 November 2025
- Valid date
- 25 November 2025
- Start date
- 4 December 2025
- Planning authority decision date
- 1 October 2025
- Appeal decision date
- 24 February 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 84890
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29