Appeal 6002062
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of first floor side extension to the house.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
I have amended the description of the development in the banner heading above to that used on the decision notice and the appellant in his appeal statement. This is a more comprehensive description of the proposed development than that given on the application form and ensures that it accurately captures the scope of the proposal.
The appellant has requested that I consider changes which were not before the Council when it took its decision, and has provided rendered imagery1, which they contend are visualisations only and not to scale. These show the hipped roof originally sought to be replaced with a flat roof. I have considered these, taking into account the tests on [name] Ltd2. While the description of development would remain the same and the change in roof design would not lead to the scheme being substantially different, I am mindful that plans are not to scale. Given the width of the proposed side extension in plan, titled [name], is shown to be wider than that shown on drawing 03, and without anything to the contrary, I consider it would be prejudicial to interested parties to accept them. I have therefore assessed the appeal on the basis of plans submitted to, and considered by, the Council.
There are discrepancies on the submitted plans from what I saw on site with regard to [address] (No 30). Plans 01 and 03 show the appeal site (No 28) alongside its immediate neighbours (Nos 26 and 30). No 30 is shown to have only a bay window to the ground and first floors within the front elevation; however, I saw that it also contained a door to the ground floor and an additional window to the first floor. Furthermore, Plan 10 omits to show the windows I saw within the ground-floor flank elevation of No 28 to the reception room. 1 Email to Inspectorate dated 12 February 2026 inc. [name] and B 2 Holborn Studios Ltd v The Council of the London Borough of Hackney [2017] EWHC 2823 (Admin)
There are also discrepancies between the proposed floor plans and elevations. Plan 12 shows a window within the upper floor of the flank elevation; however, there is no window shown on Plan 11. Moreover, Plan 03 is titled [name] when it is a proposed plan. Despite the discrepancies, I am satisfied that I have seen the site context and my determination of the appeal on the basis of the plans listed on the Council would not prejudice any interested parties.
Section 04
Main Issue
The main issue is whether the proposal would affect the living conditions of existing occupants of No 30, with particular regard to outlook.
Section 05
Reasons
No 28 is a semi-detached dwelling set within a predominantly residential area, which has a mix of typologies. I saw that while [address] had a mainly consistent building line, the exception to this was at No 30, where I saw that its front elevation was set behind the main rear elevation of No 28.
The upper flank elevation of No 28 is currently set off from the ground floor flank elevation. I saw that this would provide the occupants of No 30 with a fairly good degree of outlook and openness from the upper habitable room. The ground floor flank elevation of No 28 would, however, be partially visible from within the ground floor of No 30, and would likely restrict, in part, the outlook for the existing occupants at this level. However, its current height and its roof design would more than likely provide a degree of openness above.
I acknowledge that the appellant has gone to some length to address concerns raised by the Council following the previously refused scheme,3 and that the Council has no concerns with regard to the design of the proposal or indeed its relationship with the host property. However, the proposal would extend the flank elevation of No 28 outwards at the upper level closer to No 30, and extend it significantly to its front elevation. Even if the appellant currently owns both No 28 and No 30, this may not always be the case. Given the relationship between the properties, the proposal would result in an imposing flank elevation which would be visually intrusive from the main front habitable rooms of No 28, and would appear as an overbearing feature for its occupants.
The appellant has drawn my attention to the existence of nearby comparable extensions; however, they have not provided any address or the circumstances surrounding their presence. I did see that the adjoining property, No 26, appeared to have been extended to the side. However, even if the principle was accepted in that case, I saw that its relationship with its immediate neighbour was not similar to that between Nos 28 and 30. Its presence is therefore not comparable to the appeal before me.
For the above reasons, I conclude that the proposal would have a harmful effect on the living conditions of occupants within No 28. Conflict would arise with Hounslow's Local Plan 2015-2030 [name], Policies CC2 and SC7, which collectively seek to ensure that development has a positive impact on the amenity of current and future residents, and provide adequate outlook and minimise overbearingness. 3 P/2025/1086
Section 06
Other Matters
The absence of harm with regard to character and appearance of the host dwelling or streetscene are neutral matters in the overall planning balance, as this would be a likely requirement of a well-designed development.
Section 07
Conclusion
For the reasons set out above, and having had regard to all other matters raised, the proposal conflicts with the development plan taken as a whole. There are no other considerations which indicate that the decision should be made other than in accordance with the development plan. I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5113No official casework-database value to compare
- Extracted decision date · page 1
- 4 March 2026Matches the official casework database
- Extracted site visit dates
- 16 February 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6002062
- Application reference
- P/2025/2176
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hounslow
- Planning authority code
- E09000018
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 19 m²
- Number of residences
- Not recorded
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 28 November 2025
- Valid date
- 28 November 2025
- Start date
- 8 December 2025
- Planning authority decision date
- 8 September 2025
- Appeal decision date
- 4 March 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 85345
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21