Skip to main content
Official casework recordAllowedCurrent release

Appeal 6002224

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

Part change of use of the car park to a [name] business with associated washing and drying equipment, office, canopies over, drainage, lighting and signage.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a part change of use of the car park to a [name] business with associated washing and drying equipment, office, canopies over, drainage, lighting and signage, at [site address] , [site address] , [address], Maidenhead, Windsor and Maidenhead [postcode] , in accordance with the terms of the application reference 25/01140, subject to the conditions in the attached schedule.

  2. Section 03

    [name]

    The main issues are: • whether the proposal would be inappropriate development in the Green Belt having regard to the National Planning Policy Framework and any relevant development plan policies; and • the effect of the proposal on surface water flood risk.

  3. Section 04

    Green Belt

    The appeal site is located at the southwestern edge of the [name] car park. The leisure centre forms part of a wider complex including sporting and leisure facilities and further car parking to the north. Site entry and exit is via the A308 [address] and internal roads.

    The proposal involves the partial change of use of the leisure centre car park (including 24 car parking spaces) to a car valet business ([name] use). This includes the erection of canopied washing and drying areas, a container structure to be used as an office/secure area, and a safety screen which would be sited parallel to the proposed washing area.

    According to the submitted plans, the proposed canopies would be approximately 2.8m high, 5m deep and 8m wide, with support poles of approximately 3.4m. The container structure would be approximately 2.5m in height and depth, and approximately 6m wide. The safety screen would be approximately 2.5m high and 16m wide.

    The appeal site is in the Green Belt. Policy QP5 of the Royal Borough of Windsor and Maidenhead Borough Local Plan 2013-2033 (adopted 2022) (the Local Plan) states that planning permission will not be granted for inappropriate development (as defined by the National Planning Policy Framework), unless very special circumstances are demonstrated; and notes that certain forms of development are not considered inappropriate within the Green Belt, as defined in the National Planning Policy Framework.

    Paragraph 154 of the National Planning Policy Framework (December 2024) (the Framework) states that development in the Green Belt is inappropriate unless a specific exception applies, as set out in paragraph 154(a to h). The exception at paragraph 154(g) of the Framework relates to limited infilling or the partial or complete redevelopment of previously developed land (including a material change of use to residential or mixed use including residential), whether redundant or in continuing use (excluding temporary buildings), which would not cause substantial harm to the openness of the Green Belt.

    The proposal would comprise partial redevelopment of previously developed land (assessed against the definition set out in Annex 2 of the Framework). To establish whether the proposal would fully address the paragraph 154(g) exception requirements, it is necessary to consider whether the proposal would cause substantial harm to the openness of the Green Belt.

    Planning Practice Guidance (PPG) sets out several matters that may need to be taken into account when assessing the impact of a proposal on the openness of the Green Belt, including the spatial and visual aspects of openness and the degree of activity likely to be generated.

    The site and surrounding area fall within an urban setting. It is currently open hardstanding, in use as a car park. Existing vegetation to the west of the site acts as a significant barrier to views into and out of the site. This vegetation would largely screen the proposal from views from outside the site looking in, reducing these views to a fleeting glimpse through the pedestrian site entrance which is adjacent to the appeal site. I note that my site visit was conducted in winter when the vegetation was not in leaf; therefore, during spring and summer months when the vegetation would be in leaf, it would likely act as an even more significant barrier.

    The proposal would introduce built structures on the site, which would have an effect on openness, although these structures would be modest in terms of their height, volume and footprint, based on the dimensions in the submitted plans. The siting of the structures at the edge of the car park would help to mitigate their impact on the wider openness of the Green Belt, as it would reduce the level of spatial intrusion into more visually prominent parts of the site, making the proposal less conspicuous.

    The proposal would involve vehicles being parked within the site on a regular basis, which would have an effect on openness, albeit an effect that is transient in nature.

    The proposed canopy structures would be largely open-sided meaning there would be some visibility through the canopy structures when vehicles are not parked there. The proposed container structure would be timber clad meaning it would blend into the adjacent vegetation to a limited degree. The precise finish and details could be secured by condition.

    Taking these matters into account, I consider that the proposal would cause only moderate harm to the openness of the Green Belt. Therefore, the proposal would not be inappropriate development in the Green Belt having regard to paragraph 154(g) of the Framework, and as a result it would be in accordance with Policy QP5 of the Local Plan.

    The appellant has argued that the proposal would constitute an exception under paragraphs 154(b), 154(c) and 154(h) of the Framework. However, as I have found that the proposal is a relevant exception under paragraph 154(g) and would therefore not be inappropriate development, I do not need to examine these arguments in detail.

  4. Section 05

    Surface water flood risk

    Based on the information submitted with the appeal, the proposal is not located in an area at risk of flooding and the risk of surface water flooding is low. However, given the potential for intensive water use due to the nature of the proposal, it is necessary to ensure that the proposal incorporates adequate drainage for the management of surface water.

    Limited information on the proposed approach to drainage has been provided by the appellant. Further detail is essential to ensure that the proposal includes an appropriate surface water drainage scheme, incorporating sustainable drainage systems where possible, to mitigate surface water flood risk from the development, both on and off site.

    Given the general risk from flooding at this site is low, I am satisfied that this further detail can be required through a pre-commencement condition, which will enable the Council to consider the details of any proposed scheme prior to any development taking place.

    This approach would accord with Policy NR1 of the Local Plan which relates to managing flood risk and, amongst other things, requires development proposals to incorporate sustainable drainage systems in order to restrict or reduce surface water runoff; and reduce flood risk both within and beyond sites wherever practical.

    It would also be consistent with paragraphs 181 and 182 of the Framework, which, amongst other things, state that when determining any planning applications, local planning authorities should ensure that flood risk is not increased elsewhere; and that applications which could affect drainage on or around the site should incorporate sustainable drainage systems.

  5. Section 06

    Other Matters

    The Council briefly refer to the potential for contaminants to enter into the site’s hydrological system as a result of the proposal. However, this issue would be covered by separate regulatory regimes, therefore I do not need to explore it in the context of this planning appeal.

    The proposal would support economic growth and lead to increased employment opportunities, which is consistent with section 6 of the Framework. I ascribe this benefit limited weight.

  6. Section 07

    Conditions

    The Framework in paragraph 57 indicates that conditions should only be imposed where they are necessary, relevant to planning and to the development to be permitted, enforceable, precise and reasonable in all other respects.

    The Council has suggested conditions and I have considered these in relation to the Framework and the PPG, amending where necessary in the interests of precision and enforceability.

    The standard commencement condition and the plans condition are imposed to provide certainty. I have inserted the plan titles into the Council’s suggested plans condition in the interests of precision, for the avoidance of any doubt on which plans are approved. I have also made amendments to several drawing numbers in the Council’s suggested condition, in order to more accurately reflect the numbers of the drawings submitted with the appeal (which are the same plans upon which the Council made its decision).

    A pre-commencement condition requiring the submission and approval of a surface water drainage scheme is necessary to mitigate surface water flood risk impacts on and off site. The scheme needs to be submitted and approved before development commences given the nature of the development permitted. The appellant has agreed to this condition.

    A condition requiring approval of details of materials is necessary to prevent any adverse visual impacts. The Council’s suggested condition trigger was development above slab level. However, the reference to slab level is not relevant to the development permitted, therefore I have amended the wording to introduce a more appropriate condition trigger.

    A condition requiring a report detailing any proposed external lighting scheme is necessary to limit the impact of light pollution from artificial light on local wildlife.

    I have not imposed a condition requiring the development to be carried out in accordance with the recommendations of the [name]. This document was not provided as part of the appeal, and therefore it has not been demonstrated that the suggested condition is necessary, relevant to the development to be permitted or reasonable.

  7. Section 08

    Conclusion

    I have found that the proposal would be in accordance with the Development Plan read as a whole. Material considerations do not indicate a decision should be taken other than in accordance with the Development Plan. I therefore conclude the appeal should be allowed.

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: • Drawing no. 00024-05, dated March 2024 – Proposed elevations of external details • Drawing no. 05024-01, [name], dated April 2024 – Location plan • Drawing no. 05024-02, [name], dated April 2024 – Block plan • Drawing no. 05024-04, dated April 2024 – Proposed car park plan

    The development hereby permitted shall not commence until details of the design of a surface water drainage scheme have been submitted to and approved in writing by the local planning authority. The design must satisfy the [name] and be compliant with the National Planning Policy Framework and the accompanying Planning Practice Guidance.

    Prior to the use commencing, details of the materials to be used on the external surfaces of the development shall be submitted to and approved in writing by the local planning authority. The development shall be carried out and maintained in accordance with the approved details.

    No external lighting shall be installed until a report detailing the external lighting scheme, and how this will not adversely impact upon wildlife, has been submitted to and approved in writing by the Local Planning Authority. The report (if external lighting is to be installed) shall include the following figures and appendices: • A layout plan with beam orientation. • A schedule of equipment. • Measures to avoid glare. • Proposed lighting timings. The approved lighting plan shall thereafter be implemented as agreed. End of schedule

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4906No official casework-database value to compare
    Extracted decision date · page 1
    10 March 2026Matches the official casework database
    Extracted site visit dates
    19 February 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6002224
Application reference
25/01140
Lead case reference
Not recorded
Planning authority
Royal Borough of Windsor and Maidenhead
Planning authority code
E06000040

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
425 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
4 December 2025
Valid date
4 December 2025
Start date
10 December 2025
Planning authority decision date
30 July 2025
Appeal decision date
10 March 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
85662
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29