Skip to main content
Official casework recordDismissedCurrent release

Appeal 6002370

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

change of use and conversion of building to a dwelling and associated works.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues are whether the proposal would accord with the requirements of the Development Plan for the re-use of rural buildings in respect of: • whether it would necessitate significant external alteration or substantive rebuilding, and • whether it would result in a positive impact on the immediate setting of the building.

  3. Section 04

    [name]

    The site lies in the countryside, and consists of a former agricultural building which it is proposed to convert to a dwelling. Policy ST07 of the [name] and Torridge Local Plan (the Local Plan), adopted October 2018, limits new development to certain types, including the re-use of rural buildings. Policy DM27(c) further requires such conversions to be achieved without significant external alteration or substantive rebuilding.

    Parts of the appeal building consist of blockwork walls with timber cladding. Other large sections consist of thin metal sheeting on a frame. The Structural Survey (the Survey) includes a [name] for undertaking the proposal. It states that there are no signs of any structural movement to the external walls or timber frame structure to the roof.

    The Survey advises that there is no need to remove the cladding, and that minor repairs can be undertaken to leave it fully functional. However, the Survey is somewhat equivocal, saying that the cladding would only ‘appear’ to be in good condition. The extent of these repairs is not specified in detail. Some metal sheeting is currently missing, and the plans show that elements of timber cladding are proposed to be replaced with metal. New sections of external walling are shown on the east and west sides of the building, including at first floor level, whilst the retained block walls would have new lightweight internal walls behind them.

    The Survey states that the foundations are not in need of any additional structural alterations or strengthening works, but only ‘at this stage’ and that they would only ‘appear’ to be adequate. The frame is also said to appear to be suitable for retention. The Survey says that the existing roof sheeting could be replaced or retained with insulated lining ‘if required’, but it is unclear which option I would be approving. Part of the floor is currently formed of a concrete base, though most is compacted earth. As such, a new concrete slab is proposed, which would need to be levelled off, given the differences in internal floor level.

    I am aware of no requirement in planning policy for the undertaking of trial pits or the submission of structural calculations. The appellant has given evidence of approved barn conversions where these were not provided, despite involving buildings of metal sheeting and earth floors. The need for consistency in decision-making is important, although this must be set against the need to properly apply the policies of the Development Plan.

    In this case, the changes to the building could include large sections of new (i.e. substantially repaired or replaced) cladding, the new internal and external walls, new windows and door frames, possible strengthening work, a new roof and a new floor. This may well leave relatively little of the original structure being retained. Consequently, on the evidence before me, I cannot be satisfied that the works proposed to the building would not amount to significant alteration and substantive rebuilding.

    On this basis, the proposal would go beyond the scope of ‘re-use’ as permitted by policy ST07. The requirements of the Building Regulations do not affect my assessment which is based on its planning merits. For the reasons given above, the proposal would not accord with the requirements of the Development Plan for the re-use of rural buildings, necessitating significant external alterations or substantive rebuilding, conflicting with Local Plan policies ST07 and DM27.

  4. Section 05

    Character and Appearance

    Local Plan Policy DM27(b) requires that the proposal will have a positive impact on the immediate setting of the building, and that the wider rural character is protected. The supporting text to the policy refers to matters such as highway access, landscaping, means of enclosure and the provision of domestic paraphernalia. However, there is no dispute between the Council and the appellant about these elements of the proposal. It would include new trees and a substantial length of new hedgerow, resulting in small but positive benefits to the setting of the building.

    The building has a functional design. Given its form, conversion means that it is always likely to retain something of a utilitarian appearance. The proposal would create new openings on several sides of the building. That said, the appellant has provided examples of approved conversions with similar configurations. In this case, I am not convinced that the proportions, positioning or arrangement of the fenestration would appear particularly discordant or out of place.

    For the reasons given above, the proposal would accord with the requirements of the Development Plan in respect of having a positive impact on the immediate setting of the building. It would therefore comply with Local Plan policy DM27(c), and DM4(1)(a), which requires development to be appropriate and sympathetic including in respect of fenestration. It would also comply with the similar requirements of the National Planning Policy Framework. However, this does not change my findings in respect of the first main issue.

  5. Section 06

    Other Matters

    The proposal would add an additional dwelling to the supply of housing. It would also assist the local building industry, and its future occupiers would have positive social and economic advantages. The proposal would also result in ecological benefits. However, as a single dwelling, its contributions would be small, and they therefore carry limited positive weight. These matters do not therefore overcome my concerns above.

  6. Section 07

    Conclusion

    For the reasons given, I have found conflict with the Development Plan, read as a whole. The material considerations in this case do not indicate a decision other than in accordance with the Development Plan. This leads me to conclude that the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3683No official casework-database value to compare
    Extracted decision date · page 1
    5 March 2026Matches the official casework database
    Extracted site visit dates
    17 February 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6002370
Application reference
80132
Lead case reference
Not recorded
Planning authority
North Devon District Council
Planning authority code
E07000043

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,300 m²
Number of residences
1
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
8 December 2025
Valid date
8 December 2025
Start date
15 December 2025
Planning authority decision date
7 August 2025
Appeal decision date
5 March 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
85433
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29