Appeal 6002435
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
canopy/balcony to rear/part side.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are: • whether the proposal would be inappropriate development in the Green Belt, having regard to the National Planning Policy Framework (the Framework) and the development plan; and • if it would be inappropriate development, whether the harm by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations amounting to the very special circumstances necessary to justify the development.
Section 04
Whether inappropriate development
The appeal site lies in the Green Belt. Paragraph 154 of the Framework states that development in the Green Belt is inappropriate other than in specific exceptional circumstances. Paragraph 154.c) of the Framework provides one of these exceptions, for the extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original building.
Policy LPD05 of the [site address] Borough Local Plan up to 2037 (the LP) reflects this approach, setting out a general guideline that extensions in the Green Belt should not exceed 30% of the original building when considered individually or cumulatively.
In this case, the Council has undertaken a detailed assessment of the volume of the original dwelling, the cumulative volume of existing extensions, and the additional volume created by the appeal proposal. The appellant has not submitted any substantive evidence to challenge or contradict those calculations, and on the evidence before me I have no reason to dispute those figures.
It is therefore undisputed that the host dwelling has already been extended well beyond the 30% guideline referred to in Policy LPD05, and that the proposal would add further built form to a dwelling which has already undergone extensive enlargement. In these circumstances, the proposal would exacerbate an already significant increase from the size of the original building.
The appellant’s case places considerable emphasis on the visual effects of the proposal. However, in determining whether development is inappropriate under paragraph 154.c) of the Framework, the principal consideration is whether the proposal would amount to a disproportionate addition over and above the size of the original building. This is not primarily a test of visual or openness impacts.
The appeal proposal would introduce a new balcony and canopy structure projecting from the dwelling, supported by posts and incorporating a roofed element. Although it would not be enclosed, the development would create additional volume and built form when considered cumulatively with the existing extensions. Given the extent to which the original dwelling has already been enlarged, I am not persuaded that this further addition can reasonably be regarded as anything other than a disproportionate addition. Moreover, none of the other exceptions listed under paragraph 154 would apply to the proposal.
For these reasons, I conclude that the proposed development would not fall within any of the exceptions in paragraph 154 of the Framework and it would conflict with LP Policy LPD05, the aims of which have previously been set out. It would therefore be inappropriate development in the Green Belt.
Section 05
Other considerations and Green Belt balance
Paragraph 153 of the Framework states that substantial weight must be given to any harm to the Green Belt. Inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Such circumstances will not exist unless the harm to the Green Belt by reason of inappropriateness, and any other harm, is clearly outweighed by other considerations.
The appellant has advanced personal circumstances, specifically that the proposal is intended to benefit the specific needs of an occupier. [name] acknowledge the importance of these matters and I have given them careful consideration, only limited supporting evidence has been submitted to demonstrate the specific functional need for the appeal proposal in the form proposed. Although the appellant has suggested that amendments could be made to reduce harm, I must determine the appeal on the plans before me and on which the planning application was determined, which do not include those amendments. Taking these factors together, whilst the personal circumstances attract some weight, that weight is limited in the planning balance.
The appellant’s argument concerning visual impact primarily seeks to reduce the perceived visual effects of the development. However, as set out above, harm by reason of inappropriateness exists because of the development’s size and the cumulative volume of the existing extensions at the property, irrespective of detailed design.
Furthermore, I do not fully concur with the appellant’s assessment of the visual effects. Whilst intervisibility from the windows of the adjoining property would be limited, the development would nonetheless remain visibly prominent from the garden area of the adjoining property. It would also be perceptible in longer views from the north, including from the A580 [address], albeit at a greater distance. Consequently, the proposal would introduce additional visual presence within the Green Belt, reinforcing rather than negating the identified harm. In any event, even if visual impacts were limited, this would amount at best to a neutral consideration and would not outweigh, or overcome, the harm previously identified through inappropriateness.
I have also had regard to the appellant’s rights under Article 8 of the [name] on Human Rights, as incorporated into the Human Rights Act 1998, which protects the right to respect for private and family life and the home. The proposal is intended to improve the living conditions of the occupiers, and I accept that dismissing the appeal would prevent the appellant from carrying out the development as proposed. I have also had regard to the general principles of the [name] on the Rights of the Child (UNCRC), including the need to treat the best interests of a child as a primary consideration. However, these interests must be weighed alongside the wider public interest. In this case, any interference with Article 8 rights would be limited and proportionate, arising from the application of established planning policies which pursue the legitimate objective of preventing inappropriate development in the Green Belt. I therefore find no breach of Article 8, nor any conflict with the relevant principles of the UNCRC.
In addition, I have considered the Public Sector Equality Duty (PSED) set out in section 149 of the Equality Act 2010. I acknowledge that the proposal is partly motivated by the needs of an occupier with protected characteristics. However, the PSED does not require that planning permission be granted where development would otherwise conflict with adopted policy, nor does it remove the requirement for very special circumstances to justify inappropriate development in the Green Belt. In this case, there is limited supporting evidence for the development to support the specific needs of the occupier, and the dwelling remains capable of continued residential occupation in its existing form. Taking these matters together, I find that no equality, human rights, or child‐related considerations, whether individually or cumulatively, outweigh the harm identified. Accordingly, these matters do not alter the overall planning balance.
No other considerations have been put forward that would outweigh the harm identified. The absence of neighbour objection, the domestic scale of the proposal, and the use of sympathetic materials are common features of householder schemes and do not, individually or cumulatively, amount to very special circumstances in a Green Belt context.
Taking all matters together, I conclude that the other considerations advanced by the appellant, either individually or cumulatively, do not clearly outweigh the harm to the Green Belt arising from the inappropriateness of the development. Accordingly, the very special circumstances necessary to justify the proposal do not exist.
Section 06
Other Matters
The appellant has raised concerns regarding the Council’s handling of the application, including a perceived lack of engagement and the absence of an opportunity to amend the scheme prior to refusal. However, issues relating to procedural conduct or the way in which the application was processed are not determinative of the planning merits of the proposal before me. Accordingly, these matters do not alter my previous findings on the main issues.
Section 07
Conclusion
For the reasons given above, I conclude that the proposed development would conflict with the development plan, and there are no material considerations to indicate that the appeal should be determined other than in accordance with the plan. I therefore conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4240No official casework-database value to compare
- Extracted decision date · page 1
- 29 April 2026Matches the official casework database
- Extracted site visit dates
- 2 April 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6002435
- Application reference
- P/2025/0536/HHFP
- Lead case reference
- Not recorded
- Planning authority
- St Helens Metropolitan Borough Council
- Planning authority code
- E08000013
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Householder
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 594 m²
- Number of residences
- Not recorded
- Site in Green Belt
- Yes
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 10 December 2025
- Valid date
- 10 December 2025
- Start date
- 10 December 2025
- Planning authority decision date
- 17 November 2025
- Appeal decision date
- 29 April 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office
- Dataset status
- Current release
- Catalogue record ID
- 88021
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21