Appeal 6002442
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
redevelopment of the site to erect a pair of semi-detached dwellings.
Section 02
Decision
The appeal is allowed and planning permission is granted for redevelopment of the site to erect a pair of semi-detached dwellings at [site address] , [site address] [postcode] in accordance with the terms of the application, Ref 25/00485/FUL, subject to the conditions in the attached schedule.
Section 03
Applications for costs
An application for an award of costs was made by [name] against [site address] Borough Council. That application is the subject of a separate Decision.
Section 04
Background
Planning permission (ref 17/00194/OUT) was granted in November 2017, in full for the demolition of [address] and the conversion of No 35 to 4 flats and in outline for the erection of up to 20 dwellings on the remainder of the site. Permission was then granted (ref 18/00693/FUL) and varied (ref 22/00990/FUL) for specialist accommodation for the elderly comprising 75 residential apartments1 with, among other things, parking. Prior approval (ref 24/00509/DEM) was granted in August 2024 for the demolition of No 35. Therefore, the principle of demolition and residential development of the appeal property has been established.
Section 05
Main Issue
The main issue is whether the proposal would provide a safe and suitable access.
Section 06
Reasons
No 35 is a large detached Victorian era dwellinghouse, most recently used as offices but vacant since 2016. It sits adjacent to the highway access that serves the neighbouring [address]. It is in a primarily residential area characterised by detached and semi-detached dwellings, generally 2-storey although mixed in terms of style and sizes. [address] is a classified road subject to a 40mph speed limit and with street lighting and footways. The location is suitable for residential 1 the neighbouring [address] development development, having regard to its proximity to the town centre and associated services, facilities and sustainable transport modes.
In contrast to the majority of detached and semi-detached dwellings along [address], there is no direct vehicular access from the highway to the front of No 35. However, the appeal property is served by 4 dedicated parking spaces which share the existing [address] highway access. These parking spaces would be retained to serve the proposed semi-detached dwellings.
The evidence indicates that the existing 4 parking spaces were approved as part of the [address] development in order to serve the appeal property. This is recognised in in the approved Car Park Management Strategy for [address] which specifies that the 4 spaces are allocated for No 35 and that parking by Brookfields staff, visitors and residents is prohibited. It therefore seems reasonably likely that these parking spaces were taken into account as part of highways assessments for [address].
[name] 35 has been vacant for several years, the proposal would result in an increase in traffic movements compared to the existing situation. However, there is little evidence that the proposal would result in any greater vehicle movements than would a lawful use of the appeal property. Moreover, even if the use of the approved 4 parking spaces was not considered as part of the [address] development, 2 semi-detached dwellings would generate only a relatively small number of vehicle trips. In the context of the scale of [address] and its predicated trip generation, the proposal would not result in a significant intensification of use of the highway access.
I note the concerns of the Council and neighbouring residents in relation to the highway access including that the boundaries, bus stop and parked cars restrict visibility. However, there is little substantive evidence before me in that regard. Conversely, the Highway Authority advises that the visibility splays are acceptable for both vehicles and pedestrians and the approved access is wide enough for 2 vehicles to pass. The bus stop, relocated as part of the neighbouring development, was subject to full technical approval which took into account [address] visibility splays. Moreover, there have been no personal injury collisions within 110m in either direction for the previous 5 years and there is little evidence before me in relation to accidents, incidents or near misses.
Therefore, I conclude that the proposal would provide a safe and suitable access to the site for all users, in accordance with paragraph 115 of the National Planning Policy Framework (the Framework). It would also accord with the aims of Framework paragraph 116 insofar as development should not be prevented or refused on highway grounds unless there would be unacceptable impacts on highway safety, or severe residual cumulative impacts on the road network.
Section 07
Other Matters
I note the concerns of some of the [address] residents in relation to the parking arrangements. However, the proposal would provide adequate parking spaces in accordance with the Council’s parking guidelines. Moreover, as noted above, [address] residents, staff and visitors are prohibited from using the parking spaces provided for No 35. Concerns about a potential breach of condition in relation to keeping the approved [address] visibility splays free of obstruction are not a matter for this appeal and do not weigh against the proposal.
The proposal would make a small but valuable contribution to the supply of housing, in the context of a shortfall in the Council’s 5 year supply of deliverable housing sites. There would be no adverse effects on neighbouring residential amenity. The dwellings would provide an adequate standard of living accommodation for future occupiers. The scale and design of the dwellings would be in keeping with the character and appearance of the area.
Section 08
Conditions
The Council suggests planning conditions in the event the appeal is allowed. I have considered these against the tests set out in the Framework and have amended them in places in the interests of precision or enforceability.
I have imposed the standard time limits condition (No 1) and a condition specifying the approved plans (No 2) in the interests of certainty. Conditions relating to external materials (No 3), boundary treatments (No 4), landscaping (No 8) and tree protection (No 9) are required in the interests of the character and appearance of the area. Conditions relating to construction management (No 5) and parking areas (No 7) are necessary in the interests of highway safety and residential amenity. Measures to address unexpected land contamination (No 6) are necessary to protect the environment and human health.
Section 09
Conclusion
For the reasons given above, I conclude that the proposal would be in accordance with the development plan and there are no material considerations that indicate making a decision otherwise than in accordance with it.
Therefore, I conclude that the appeal should be allowed.
Section 10
SCHEDULE OF CONDITIONS
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with drawing nos: 00031-0110 Location Plan; 00031-0111 Site Plan; 00031-0120 [name]; 00031-0150 [name]; 00031-0121 [name]; [address] Scene.
The external surfaces of the development hereby permitted shall be constructed in the materials detailed in the application forms and shown on drawing no. 00031-0150 [name].
The boundary treatments both within the site and the boundaries of the development hereby permitted shall be constructed in accordance with the details shown on drawing no. 00031-0121 [name].
Prior to the commencement of any construction, including demolition, a Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The approved CEMP shall include details relating to: • The construction access; • hours of construction; • routing of HGVs; • delivery times; • the location of the construction compounds, cabins, material storage areas and contractors parking; • a scheme for the management and suppression of dust and mud from construction activities including the provision of a vehicle wheel wash; • a method of demolition and restoration of the site; • measures for root protection; • lighting; • details to ensure that nesting birds are not adversely affected. All site operations shall be undertaken strictly in accordance with the approved CEMP for the duration of the construction programme.
In the event that contamination is found or is suspected to be present at the site when carrying out the development hereby permitted, it shall be reported immediately in writing to the local planning authority and development on that part of the site shall be halted until an investigation and risk assessment has been undertaken, in accordance with BS10175 (2001) – [name] Code of Practice, BS8485 (2007) Code of Practice for the Characterization and Remediation from [name] in [name], and CLR 11 [name] [name], issued by The Environment Agency. Any necessary remedial proposals shall be submitted to and approved in writing by the local planning authority prior to the recommencement of the development. Prior to commencement of the proposed use of the site, written confirmation shall be submitted to the local planning authority that no contamination was found or suspected or, if remedial actions were required, independent validation that proposed remedial measures have been carried out in accordance with the approved scheme.
The proposed car parking and circulation areas as shown on drawing no. 00031-0111 shall be hard surfaced in a bound material and marked out prior to the first occupation of the site hereby permitted. Thereafter these parking areas shall be retained in accordance with the approved plans for the lifetime of the development.
The approved [name], drawing no 00031-0121, shall be implemented within the first planting, seeding and turfing season following the construction of the buildings hereby approved. Any trees or shrubs that die, are removed or are seriously damaged or diseased within 5 years following planting shall be replaced in the next planting season with other trees or shrubs of a similar size and species.
The development hereby permitted shall be carried out in accordance with the tree protection measures contained in the approved Arboricultural Assessment by [name] & Design dated June 2025. The approved protection measures shall be installed before any works of demolition, site clearance or construction take place. The approved protection measures shall be retained in the agreed positions for the duration of the construction phase. End of Schedule
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 205No official casework-database value to compare
- Extracted decision date · page 1
- 2 March 2026Matches the official casework database
- Extracted site visit dates
- 17 February 2026 (page 1)
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 205No official casework-database value to compare
- Extracted decision date · page 1
- 2 March 2026Matches the official casework database
- Extracted site visit dates
- 17 February 2026 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 6002442
- Application reference
- 25/00485/FUL
- Lead case reference
- Not recorded
- Planning authority
- Newcastle-under-Lyme Borough Council
- Planning authority code
- E07000195
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- Not recorded
- Appeal reason
- refused
- Type detail
- Planning Appeals - Full
- Jurisdiction
- No Jurisdiction Associated
- Link status
- Not recorded
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0 hectares
- Floor space
- 605 m²
- Number of residences
- 2
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Yes
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 10 December 2025
- Valid date
- 10 December 2025
- Start date
- 12 December 2025
- Planning authority decision date
- 11 September 2025
- Appeal decision date
- 2 March 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- Not recorded
- Bespoke
- Not recorded
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Back Office-s78
- Dataset status
- Current release
- Catalogue record ID
- 85205
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 20 August 2026 at 16:29