Skip to main content
Official casework recordAllowedCurrent release

Appeal 6002487

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘Alterations to front boundary wall / hedgerow, erection of railings and gates, creation of off-street parking space with new dropped kerb to enable the parking of an electric car.’

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for alterations to front boundary wall / hedgerow, erection of railings and gates, creation of off-street parking space with new dropped kerb to enable the parking of an electric car at [site address] , Kensington and Chelsea, London [postcode] in accordance with the terms of the application, [name]/25/05191, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing nos: ‘Location and Site Plan’ AL(90)01 [name]; ‘[address] Plan’ AL(90)10 [name]; ‘Proposed Plan’ AL(00)10 [name]; ‘[name] and Section’ AL(00)11 [name]; ‘[name](00) 12.

    Notwithstanding condition 2, no development shall commence until a Flood Risk Assessment and a [name] (SuDS) Strategy, have been submitted to and approved in writing by the local planning authority. The SuDS Strategy shall include details of permeable paving and sub-surfacing, means of attenuation including volume, means of surface water run-off being conveyed to the SuDS, and any sewer system connection. The development shall be carried out, retained and maintained, in accordance with the approved details.

    The development shall be carried out in accordance with the mitigation measures and recommendations contained within the Arboricultural Impact Assessment Report (Ref: C2J/80OXG/AIA/01a), including tree protection during construction, and construction details.

    Notwithstanding condition 2, prior to the off-street parking space being first brought into use, details of a replacement wrought iron pedestrian gate, shall first be submitted to and approved in writing by the local planning authority. The approved pedestrian gate shall be installed, prior to first use of the off-street parking space, and retained thereafter.

    The gates hereby approved shall be black painted and so maintained.

    The vehicular gates shall be electronically operated such that they can be opened remotely and shall be retained as such.

  2. Section 03

    [name]

    The main issue is the effect of the development on parking provision.

  3. Section 04

    Reasons

    The appeal site is within a residential street, comprising large, detached dwellings with front gardens. The street is primarily on-street parking, which is demarcated by runs of parking areas, interspersed with pavement crossovers into around eight off-street spaces. Planning permission was granted for an additional off-street space at 70 Oxford Gardens1. The area is within a [name] (CPZ).

    Policies TR4 and TR8 of the Local Plan2 require improvements to the visual, functional and inclusive quality of streets, and require all work to be carried out in accordance with the Council’s Streetscape Guide. They also require the demonstration that following mitigation, development will not adversely increase traffic congestion or on-street parking pressure, amongst other things.

    Policy TR4 also seeks to resist pavement crossovers and forecourt parking. The Transport and Streets SPD3 provides additional guidance in this regard. It states that accesses should not compromise the visual or functional quality of the streetscape, highway safety, traffic flow or on-street parking availability. It also states that crossovers and forecourt parking will not gain consent where they result in the loss of on-street parking without a net gain of at least two parking spaces overall.

    The proposal relates to a continuous stretch of on-street parking, extending from the start of the demarked zone near the road junction with [address], to the western edge of a disabled bay. [address] Plan4, indicates that it is approximately 94.1 metres long. Even though the Council’s stance is that the area is circa. 95 metres long, this is not supported with evidence. There are no individually marked bays, however based on six metre long spaces to enable parallel parking, or one space being open-ended and therefore 4.8 metres long, the existing parking area can accommodate 15 cars. There is nothing before me to dispute this number. Accordingly, I am satisfied that this is a realistic calculation of the existing spaces.

    [address] Plan indicates that the proposed crossover would provide a break in the stretch of on-road parking and would leave the two bays on either side of the break, open-ended. As such, it would be easier to manoeuvre into them, and they could then be 4.8 metres long, rather than the 6 metre length required to parallel park. Taking account of this, and that the space at the western end of the on-street parking area is also open-ended, the total number of cars able to park, 1 PP/21/05662. 2 New Local Plan Review, July 2024, The Royal Borough of Kensington and Chelsea. 3 Transport and Streets Supplementary Planning Document, April 2016. 4 Dwg no AL(90)10C. would still amount to 15. There is nothing before me to dispute the appellant’s calculations, and I am therefore satisfied that there would be no loss of on-street parking within the stretch of on-road parking.

    I recognise that an incremental loss of available on-street parking could have a wider impact on the borough as a whole. Indeed, Paragraph 10.45 of the supporting text to Policy TR8 states that the whole borough is subject to one CPZ and therefore demand for parking from new development will not necessarily be focused in the area surrounding it. In the context of a lack of individual demarcated bays, the proposal would mean that there would be 4.3 metres less space overall, within the borough, for on-street parking. I note the Council’s similar stance in respect of the [address] appeal decision, whereby they consider the loss of any length of parking to be material.

    However in this specific case, and in the absence of evidence to the contrary, I have found that there would be no change to the number of cars being able to park. There is also nothing before me to indicate that the loss of 4.3 metres would compromise the overall functional quality of on-street parking availability within the CPZ. Accordingly, a net gain of at least two parking spaces overall, would not be required.

    There is a high demand for on-street parking in the area, as evidenced by the introduction of the CPZ and the Council survey data indicating a weekday overnight permit parking demand of between 70% and 80%. The appellant refers to a 90% threshold for parking stress, citing the appeal decision at [address]. However, I have not been provided with details of the evidence before the Inspector in that case, which limits the weight I can attach to that figure. I also note that the decision was issued some years ago, and relevant benchmarks or guidance may since have evolved. In any event, site-specific parking surveys provide a more reliable indication of current parking demand than proxy measures such as permit revenue.

    Nevertheless, in the absence of robust evidence to the contrary, I conclude that the proposal would not result in the loss of available on-street parking and would not compromise the safe and efficient operation of the CPZ. As such, the proposal complies with Policies TR4 and TR8 of the Local Plan.

  4. Section 05

    Other Matters

    Policy TR6(F) of the Local Plan seeks to safeguard public access by ensuring development does not reduce access to, or attractiveness of, existing footways used by the public. The SPD guidance states that, crossovers and forecourt parking will not gain consent where (on narrow pavements), they would create an uneven surface for pedestrians to negotiate, amongst other requirements.

    The crossover would result in the pavement surface sloping downwards from the site boundary to road level. However, the pavement is not narrow, and so the slope would not be severe. There is also no other dished paving in close proximity, which would otherwise have resulted in an undulating surface. For these reasons, the access to, attractiveness, and functional quality of the public footway would not be unduly compromised, in accordance with Policy TR6 of the Local Plan, and the SPD.

    The site is within [address] Conservation Area (the CA). [address] is significant for the character and architectural quality of the residential houses, which are [name] development, of the Victorian era. A strong contributing factor to their significance is the building lines set behind front gardens, with low, frontage, boundary walls and hedges. However there is also variety in boundary treatments within the street scene, including wrought iron gates.

    The proposal would result in the loss of a short section of wall and hedge; however it would be replaced with black painted, wrought iron, bi-fold vehicle gates, which would accord with the Council’s streetscape requirements. The existing pedestrian gate is timber and is shown to be retained as such on the proposed plans. The replacement of this gate with a black painted wrought-iron equivalent, as agreed by the appellant, would adhere to Policy TR4(A) of the Local Plan, which requires an improvement to the quality of streets. Taken as a whole, including some loss of boundary features, and their replacement with suitable equivalents, the proposal would preserve the character and appearance of the CA and would not harm its significance.

    Three trees are growing in close proximity to the proposal and are the subject of a Tree Preservation Order. A shallow crossover design, and geo-web sub-base for the driveway, topped with a permeable paving section, as shown on drawing AL(00)12, would ensure there would be no damage to tree roots. I note the Council’s similar stance in this regard.

    The site is within the North Kensington Critical Drainage Area. The parties agree that a site specific flood risk assessment and sustainable drainage scheme should be secured by way of a condition of planning permission. Taking account of the small scale of development, and permeable surfacing, I have no reason to disagree.

  5. Section 06

    Conditions

    The Council has suggested a list of planning conditions, and the appellant has similarly commented. I have considered the conditions against advice contained in the Planning Practice Guidance. Where necessary I have altered wording to ensure enforceability, necessity and conciseness, and to ensure conditions are not unduly onerous in the context of the scale of development.

    It is necessary to confirm the standard time limit for the development, and to specify the approved plans and drawings, for the avoidance of doubt.

    A site specific flood risk assessment and sustainable drainage system (SuDS) scheme are required to ensure that the potential for surface water flooding is mitigated. It is required pre-commencement, as it is essential for the scheme to be incorporated into all aspects of the construction, including below ground elements.

    A condition is imposed requiring the development to be carried out in accordance with the recommendations set out in the Arboricultural Impact Assessment Report, including tree protection during construction. This is in order to safeguard the long term health of the trees.

    Details are required of the proposed pedestrian gates, and the painting black, of both sets of gates, to ensure harmonious treatment. A condition requiring the vehicular gates to be electronically operated is required to reduce instances of cars waiting in the road, in the interests of highway safety, and to accord with the Council’s requirements.

  6. Section 07

    Conclusion

    For the above reasons, the proposal accords with the development plan, when read as a whole. Material considerations do not indicate that a decision should be taken other than in accordance with the development plan. I therefore conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5239No official casework-database value to compare
    Extracted decision date · page 1
    19 May 2026Matches the official casework database
    Extracted site visit dates
    5 May 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6002487
Application reference
PP/25/05191
Lead case reference
Not recorded
Planning authority
Royal Borough of Kensington and Chelsea
Planning authority code
E09000020

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
400 m²
Number of residences
Not recorded
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
11 December 2025
Valid date
11 December 2025
Start date
12 March 2026
Planning authority decision date
22 October 2025
Appeal decision date
19 May 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office
Dataset status
Current release
Catalogue record ID
89005
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21