Skip to main content
Official casework recordDismissedCurrent release

Appeal 6002521

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

formation of setback access on land to the north of [address], [site address] .

  1. Section 02

    Decision

    The appeal is dismissed and planning permission is refused.

  2. Section 03

    [name]

    I have used the description of the proposal as set out in the appeal form, which is more concise than that used in the application form. I am satisfied that no party would be prejudiced as a result.

  3. Section 04

    Background and Main Issue

    The appeal results from the failure of the Council to determine the application within the prescribed period and so there is no formal Decision Notice. However, the Council’s Statement of Case sets out the reasons why planning permission would have been refused had it been empowered to do so. I have determined the appeal on this basis.

    The main issue is whether sufficient information has been provided to demonstrate that an exemption from the requirements of [name] (BNG) applies to the proposal, and its effect on biodiversity.

  4. Section 05

    Reasons

    The site consists of a gateway entrance to a field. It is located off the fast, busy A361. The proposal seeks to create a new vehicular and pedestrian access, set back from the road, together with fencing and areas of hard surface. This would necessitate the relocation of a length of existing hedgerow to be behind the new entrance splays.

    The application form states that the BNG condition does not apply because it is subject to the de minimis exemption of development below the threshold. This requires that the proposal does not impact a priority habitat, consists of less than [address] metres of onsite habitat, and contains less than five metres of linear habitats such as hedgerows. All of these criteria need to be met for the exemption to be satisfied.

    The application includes an ecological survey. Despite this, there is insufficient detail to be sure that the hedgerows to be removed do not qualify as a priority habitat. The Council’s undisputed calculations are that the area of onsite habitat grassland affected would be greater than [address] metres. The length of hedgerow to be transplanted would exceed five metres in length. It follows that the proposal does not demonstrably meet any of the criteria for the BNG exception.

    The current hedgerow has limited thickness, and only a relatively small area of grassland would be lost. The proposal may allow extra cover for nesting birds and small mammals, and provide them with better protection from wind and hedge-cutting activities. Against that, hedgerow translocation can result in a reduction in its condition, for instance because of root disturbance, soil structure changes, and altered connectivity. The appellants’ ecology report gives advice about how the proposal could avoid or minimise harm to protected species. However, it also recommends that a BNG assessment is undertaken, but none has been provided.

    For the reasons given, I conclude that the proposal is not exempt from BNG and so is subject to the biodiversity gain condition, together with the minimum information requirements set out in the Planning Practice Guidance1. In the absence of this, the biodiversity gain objective would not be met, and so I cannot be satisfied that the proposal would be acceptable with regard to this matter.

    The appellants have made other ecological improvements at the farm, such as the planting of trees. As well as bee farming and food production, they intend to create a small lake, and to install nesting boxes. That said, these benefits have not been quantified for the purposes of the biodiversity metric. As such, I do not have enough data to show that they would result in sufficient biodiversity net gains to justify the proposal.

    For the reasons given above, insufficient information has been provided to demonstrate that an exemption from BNG requirements applies to the proposal, and so it could well have a harmful effect on biodiversity or provide insufficient gains. On this basis, it would conflict with policy D20 of the Sedgemoor Local Plan, adopted February 2019, which requires proposals to maintain and where appropriate enhance biodiversity and geodiversity.

  5. Section 06

    Other Matters

    The proposal would provide improved visibility for vehicle drivers when leaving the site, and would allow vehicles to pull in off the road while the entrance gate is opened or closed. The hard surface would reduce or prevent mud being left on the highway. The Highway Authority has not objected to the proposal, and it would result in road safety benefits.

    Agriculture is an important industry facing difficult circumstances and the appellants intend to provide good quality food to the local community. The installation of a more secure gate would help to deter crime, which has been a recent problem. However, the relevant legislation2 makes clear that the BNG 1 Paragraph: 011 [name]: 74-011-20240214 2 Schedule 7A of the Town and Country Planning Act 1990 as inserted by Schedule 14 of the Environment Act 2021. requirements are mandatory, and so must be followed regardless of the highways and other benefits of the proposal.

    The appellants have expressed concern about how the planning application was handled by the Council. They say that it has made unnecessary and expensive requirements, did not visit the farm despite requests, and has failed to make a decision within the determination period. Nevertheless, my focus is on the planning merits of the appeal proposal, rather than how the application was dealt with.

  6. Section 07

    Conclusion

    For the reasons given, there would be conflict with the Development Plan, read as a whole. The material considerations identified do not indicate a decision otherwise than in accordance with it, or overcome the conflict with the legislation. I therefore conclude that the appeal must be dismissed and planning permission refused.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3683No official casework-database value to compare
    Extracted decision date · page 1
    16 April 2026Matches the official casework database
    Extracted site visit dates
    7 April 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6002521
Application reference
32/25/00002
Lead case reference
Not recorded
Planning authority
Somerset Council
Planning authority code
Not recorded

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
not_received
Type detail
Planning Appeals - Full
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
41,700 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
Yes
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
11 December 2025
Valid date
11 December 2025
Start date
16 December 2025
Planning authority decision date
20 August 2025
Appeal decision date
16 April 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
87468
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29