Skip to main content
Official casework recordAllowedCurrent release

Appeal 6002827

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the installation of a telecommunications base station comprising a 17.50m monopole supporting 6No. antennas, 1No. 300mm dish together with 2No. ground-based cabinets, 1No. meter cabinet, and ancillary development thereto.

  1. Section 02

    Decision

    The appeal is allowed and prior approval is granted under the provisions of Article 3(1) and Schedule 2, Part 16, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for installation of a telecommunications base station comprising a 17.50m monopole supporting 6No. antennas, 1No. 300mm dish together with 2No. ground-based cabinets, 1No. meter cabinet, and ancillary development thereto at land at [address], [site address] , Trafford [postcode] in accordance with the application 117190/TEL/25 and the details submitted with it including drawings:100 Dwg [name]; 200 Dwg [name]; 201 Dwg [name]; 300 Dwg [name]; and 301 Dwg [name].

  2. Section 03

    Preliminary Matters

    The provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (GPDO), under Article 3(1) and Schedule 2, Part 16, Class A, [name].3(4) require the local planning authority to assess the proposed development solely on the basis of its siting and appearance, taking into account any representations received. My determination of this appeal has been made on the same basis.

    The principle of development is established by the GPDO, which does not require regard to be given to the development plan. I have had regard to Policy JP-P1 of the Places for Everyone Joint Development Plan Document (2024), Policy L7 of the [name] (2012), and the National Planning Policy Framework (the Framework) in so far as they are a material considerations relevant to matters of siting and appearance.

  3. Section 04

    [name]

    The main issues are: • the effect of the siting and appearance of the proposed installation on the character and appearance of the area, and on the living conditions of occupiers of nearby dwellings, with particular regards to outlook; and • if any harm would occur, whether this is outweighed by the need for the installation to be sited as proposed taking into account any suitable alternatives.

  4. Section 05

    Character and appearance

    The appeal site comprises a paved area of footway adjacent an area of grassed amenity land which is located between [address] and [address], close to its junction with [address].

    Existing vertical structures in the area include street lighting columns, telegraph poles and road signage. There are also several trees within the grass verges either side of the junction and alongside the road edge of the pavement. In combination with other street trees, these afford visual relief in the built form and consequently, the surrounding close-knit residential area has a predominantly leafy and verdant character and appearance.

    It is proposed to install a 17.5m high monopole which would accommodate six antennas and a single dish and would be sited parallel to the rear of the footway. The mast would be the minimum height required to provide adequate coverage to the target area, but it would nevertheless be significantly taller than the closest dwellings and the existing vertical structures, notably the street lighting columns on either side of [address]. Further, although of a slimline design, the circumference of the antennas and dish on the upper section of the mast would give it an appreciably bulkier appearance.

    Consequently, the mast would appear a conspicuous feature when viewed in proximity to the appeal site notably along the short section of [address] approaching the junction. Although typical of telecommunications equipment seen in urban areas, the introduction of the monopole and equipment cabinets would nevertheless noticeably erode the visual relief afforded by the adjacent amenity land. However, as the road bends and the alignment of the highway is staggered, the wider visual impact would be significantly reduced and from further away along [address] the installation would largely be seen alongside the street trees and the Birch trees within the adjacent amenity land.

    Similarly, in longer views from [address], [address], and from the junction of [address] with [address], the lower part of the mast would be seen against the backdrop of existing trees. Even when not in full leaf, these would provide some softening of the appearance of the monopole. However, because of its height, the upper part of the installation, and particularly the antennas and dish, would be visually dominant on the skyline, above the existing trees, surrounding dwellings and street lighting columns. The visual impact arising from the mast would not be sufficiently mitigated by its fir green colour.

    I therefore conclude that the siting and appearance of the proposed installation would be detrimental to the character and appearance of the area.

  5. Section 06

    Living Conditions

    The proposal would be seen in views from dwellings close to the junction. The nearest property is [address] which borders the footway and area of amenity space. The main windows of this dwelling would almost directly face the installation in reasonable proximity. When viewed from these windows or the garden, despite its slender profile, the lower part of the monopole would appear an overbearing structure, wider and more visually intrusive than nearby telegraph poles or street light columns.

    Other residences on [address], [address] and [address] are more distant from the site, and the proposal would also be offset in views from these dwellings. Moreover, the intervening trees would be effective in screening or filtering oblique views from the windows of these dwellings even during the winter months. Therefore, the proposal would not cause any undue obstruction to views or have any significant overbearing effect on these nearby dwellings.

    Nevertheless, the proposal would be dominant enough to result in harm to the living conditions of the neighbours at [address], with regards to outlook.

  6. Section 07

    [name]

    The Framework states that decisions should support the expansion of electronic communications networks, including next generation mobile technology, such as 5G. The operator previously provided coverage from a shared base station site at a multi-storey car park at [address], but a ‘Notice to Quit’ has been served.

    The appellant has split the single cell area previously covered by this base station. The identified search area is the newly created southern cell area, which is relatively constrained and broadly comprises the residential roads either side of [address]. The proposal is required to provide replacement and improved network coverage and capacity, and to establish new 5G connectivity services for the VodafoneThree network. I am satisfied that the appellant has demonstrated that the site is within an area with demonstrable need for a new installation.

    The Framework encourages the use of existing masts, buildings and structures for new electronic capability. Paragraph 122 of the Framework requires evidence to be submitted to demonstrate that applicants have explored the possibility of erecting antennas on an existing building, mast or other structure. The appellant has undertaken a search for alternative sites within the cell search area, applying a sequential site selection process.

    Thirty-five potential alternative sites have been assessed by the appellant to accommodate the proposed development, including the NTQ site and several sections or lengths of pavement. Eleven rooftop options were discounted principally due to technical constraints, including the height or construction of the roof, or the size and design of installation which would be required for effective transmission or International Commission on [name] (ICNIRP) certification. The search area is characterised predominantly by relatively tight-knit suburban housing and the reasons for discounting the other sites included insufficient space on the footways (limited in places by street trees), the location of underground services, overhead lines and points of access to dwellings. Potential sites to the west of the tramline were discounted as the required coverage would not be met.

    Site 15 ([address] Yard) was discounted solely on the basis that an installation would be directly opposite 122-126 (even) [address]. I observed on my site visit that an installation sited on the frontage of Site 15 would be further from these dwellings than the appeal proposal would be from [address]. However, the installation would also be close to windows on the flank elevation of the adjoining apartment building, known as [address]. Further, in contrast to the appeal site, views of the installation would not be screened or filtered by trees.

    Therefore, based on my observations and the evidence, I am satisfied that there are no realistic opportunities to erect antennas on existing buildings, masts or other structures. The site selection process was robust, potential alternatives discounted on reasonable grounds and the Council themselves recognise that there are no alternative appropriate sites. Accordingly, I conclude that the harm to the character and appearance of the area and to the living conditions of nearby occupiers would be outweighed by the need for the installation to be sited as proposed given the lack of suitable alternatives.

  7. Section 08

    Other Matters

    The appellant has provided a certificate to confirm that the proposal has been designed to comply with the guidelines published by ICNIRP. In these circumstances, the Framework advises that health safeguards are not something which a decision-maker should determine. No persuasive evidence has been provided to indicate that the ICNIRP guidelines would not be complied with, or that a departure from national policy would be justified. Moreover, I have no sufficiently authoritative evidence before me that there is an objective justification for fears resulting from interference with medical equipment or implants.

    I have had regard to other concerns raised by interested parties. However, the principle of development is established by the GPDO, and my considerations are limited to the siting and appearance of the apparatus in accordance with the relevant legislation as set out in the preliminary matters section of my decision. In this regard, there is no substantive evidence relating to fear and anxiety, noise and disturbance, ecology or biodiversity, the cumulative effects of 5G rollout, or climate change that would alter or outweigh my findings on the main issues.

  8. Section 09

    Conditions and Conclusion

    The GPDO does not provide any specific authority for imposing additional conditions beyond the deemed conditions for development by electronic code operators contained within it. These specify that the development must be carried out in accordance with the details submitted, and the [name] plan shows the installation painted fir green, as requested by the Council.

    I conclude that the appeal should be allowed, and prior approval granted. [planning inspector] INSPECTOR

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5577No official casework-database value to compare
    Extracted decision date · page 1
    5 March 2026Matches the official casework database
    Extracted site visit dates
    19 February 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
6002827
Application reference
117190/TEL/25
Lead case reference
Not recorded
Planning authority
Trafford Metropolitan Borough Council
Planning authority code
E08000009

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Other minor developments
Appeal type reason
Not recorded
Appeal reason
refused
Type detail
Prior Approval
Jurisdiction
No Jurisdiction Associated
Link status
Not recorded

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
0 hectares
Floor space
1,000 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
No
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
18 December 2025
Valid date
18 December 2025
Start date
31 December 2025
Planning authority decision date
23 October 2025
Appeal decision date
5 March 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
Not recorded
Bespoke
Not recorded
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Back Office-s78
Dataset status
Current release
Catalogue record ID
85441
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
20 August 2026 at 16:29